ML18033A825
| ML18033A825 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 07/12/1989 |
| From: | Michael Ray TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 8907140244 | |
| Download: ML18033A825 (4) | |
Text
gC CK1KRATED DIl)~BUTION DEMONSTRATION SY~Zg REGULAT INFORMATION DISTRIBUTION STEM (RIDS)
ACCESSION NBR:8907140244 DOC.DATE: 89/07/12 NOTARIZED: NO DOCKET N
FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee
'5000260 AUTH.NAME AUTHOR AFFILIATION RAY,M.L.
Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards current status of readiness for plant restart insps.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR + ENCL f
SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:1 Copy each to: S.Black,D.M.Crutchfield,B.D.Liaw,
.R.Pierson,B.Wilson 05000260 5
RECIPIENT ZD CODE/NAME PD INTERNAL: ACRS AEOD/DEIZB DEDRO NRR/DEST DIR NRR/DOEA DIR 11 NRR/DREP/RPB 10 NUDOCS-ABSTRACT OGC/HDS2 RES MORISSEAU,D EXTERNAL: LPDR NSIC NOTES:
COPIES LTTR ENCL 1
1 2
2 1
1 1
1 1
1 1
1 2
2-1 1
1 1
1 1
1 1
1 1'
5 RECIPIENT ID CODE/NAME.
GEARS,G AEOD AEOD/TPAD NRR SHANKMAN,S NRR/DLPQ/PEB NRR/DREP/EPB 10 NRR/PMAS/ILRB12 OE LIEBERMAN,J RG 2
F 1
NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
NOIR 'IO ALL 'RIES" KXIPZENIS'LEASE HELP US 'IO~REDOCE HASTE.'GNI'ACI' DOCUMENI'XNTRDLDESK, RXN Pl-37 (EXT.'20079) K) KZiBGKLTE YOUR MNE HKH DZPI%)IBUTICS LISTS KR DOCUMEHIS YOU DCSERT NEED!
h D
D S
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 30 ENCL 30
TENNESSEE VALLEYAUTHOR1TY CHATTANOOGA. TENNESSEE 37401 5N 1578 Lookout Place JUL! 3 e>
U.S. Nuclear Regulatory Commission ATTN: 'ocument Control Desk Hashington, D.C.
20555 Docket No. 50-260 Gentlemen:
a
'n the Matter of
)
a Tennessee Valley Authority
)
BROGANS FERRY NUCLEAR PLANT (BFN) SCHEDULE FOR MAJOR INSPECTIONS FOR UNIT 2 RESTART On May 17,
- 1989, TVA submitted to the NRC staff a letter documenting the status of readiness for BFN unit 2 restart'nspections.
Inspections were
'lassified into four categories:
ongoing inspections (i.e., in progress),
firm date inspections, schedule dependent, and under review.
The information provided included:
inspection prerequisites, the dates when TVA expected to complete the prerequisites, and the scheduled NRC inspection dates.
The enclosure to this letter provides the current status of readiness for BFN unit 2 restart inspections.
This information was discussed during the June 6,
1989 and July 10, 1989 meetings between TVA representatives and members of the NRC staff.
TVA wi 1 1 continue to meet periodically with the NRC staff to review our progress relative to the schedule.
For those inspections listed as "firm.
date,"
TVA requests that the NRC staff conduct the inspections on the agreed upon dates.
TVA is confident that the prerequisites have either been completed or will be completed by the date noted in the schedule.
If you have any questions, please 'telephone Patrick P. Carier, BFN, Site Licensing, at (205) 729-3570.
Very truly yours, TENNESSEE VALLEY AUTHORITY Enclosure cc:
See page 2
Manager Nuclear ( cgnslng and Regulatory Affairs 8907140244 8 o00260 pDR ADO@K'0~ pgU 9
An Equal Opportunity Employer
U.S. Nuclear Regulatory Commission JUL i 8 1%8 cc (Enclosures.):
Ms. S.
C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockvi lie, Maryland 20852 Mr. B. A. Wilson, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637
- Athens, Alabama 35609-2000
BFN UNIT 2 CYCLE 5 NRC RESTART INSPECTIONS A.
ONGOING RESTART TEST PROGRAH (PHASE II REVIEW)
EHPLOYEE CONCERNS INSPECTION OLD 8, NEW PROGRAMS HANAGEMENT EFFECTIVENESS OPERATOR EXAH (GROUP 4)
Total
= 4 B.
FIRH DATE SEISMIC STRUCTURAL FOLLOW-UP APP R SSD FOLLOW-UP GE REACTOR VESSEL FOLLOW-UP SHALL BORE CRITERIA AND IHPLEHENTATION 79-02/14 PRE-RESTART INSPECTION (Large Bore)
INTENANCE PERFORHANCE BASED TEAH INSPECTION LL PARTICIPATION REP EXERCISE Total
= 7 C.
SCHEDULE DEPENDENT ELECTRICAL ISSUES, INSPECTION ELECTRICAL ISSUES FOLLOWUP POWER ASCENSION 'TEST PROGRAH INSPECTION ENVIRONHENTAL QUALIFICATION INSPECTION ILRT HYDRO HAINTENANCE FOLLOWUP INSPECTION OPERATIONAL READINESS/RESTART ASSESSHENT SYSTEH ALIGNHENT INSPECTION Total
= 9 D.
UNDER REVIEW SURVEILLANCE INSTRUCTION ADEQUACY 8 SYSTEH ENGG QUALITY ASSURANCE PROGRAM ECH SPEC ADEQUACY INSPECTION - PART I ECH SPEC PART II INSPECTION EHERGENCY OPERATING PROCEDURES ZNSPECTION
.SAFETY SYSTEH QUALITY EVALUATION (Vertical Slice)
TRAINING VERIFICATION,- MGHT. & ORG.
FOLLOWUP PROCUREHENT/PIECE PARTS INSPECTION ECP SPECIAL INSPECTION - OPERATIONS PROGRAMHATIC FIRE PROTECTION REGION II BI-ANNUAL INSPECTION Total = 10 GRAND TOTAL = 30 COHPLETE COHPLETE PDS ISS; STABLE ORG CHARTS 8 PER OPERATOR PREPARATION CLOSE INSPECTION FINDINGS OPEN ITEHS COHPLETE OR TVA POSITION ESTAB GE CALC READY 90K DESIGN COHP + 5 PRBLH VERIF 90K DESIGN COMPLETE PROGRAH ISSUES RESOLVED COMPLETE 89-25 ACTION ITEHS TO BE CONFIRHED ON 7/12/89 RESOLVE OPEN ITEMS STARTUP WORK COHPLETE 90K PACKAGES COMPLETE/
75 HODS 8 HRS COMPLETE READY FOR TEST READY FOR TEST RESOLVE OPEN ITEHS 20 DAYS BEFORE RESTART FINAL SYSTEH ALIGNHENT TVA READY 8 PROCEDURES READY - OPEN LER 8 ZNSPECTION ITEHS READY FOR CLOSURE RESOLVE 60 NRC TOPICAL REPORT QUESTIONS BFN VERIFICATION COMPLETE & CORRECTIVE ACTIONS IN PROGRESS BFN VERIFICATION COMPLETE & CORRECTIVE ACTION IN PROGRESS ADDRESS88-200 CONCERNS TBD TBD BASED ON INSPECTION REPORT FUEL LOAD SYS COHP NONE COMPLETE NRC INSPECTION PROCEDURE 64704 PREREQ
. CQHLQhIE READY READY READY READY READY 7/14/89 7/24/89 8/14/89 9/18/89 9/22/89 10/30/89 8/04/89 TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD
'/24/89 8/24/89 8/25/89 TBD TBD TBD READY TBD INSPECTION JS~BIE ONGOING ONGOING ONGOING 7/10/89 - 7/21/89 TBD 7/17/89 8/14/89 8/21/89 9/25/89 TBD 11/1/89 - 11/2/89 8/07/89 TBD TBD TBD TBD TBD TBD