t DISTRIBUTION M 11 1988 central Files BElliot Dr. Joseph K. Gasper, Chairman ADRI RF AThadani Combustion Engineering Owners Group FJMiraglia WHodges c/o Omaha Public Power District SAVarga RPerfetti 1623 Harney AJMendiola Shou 5
Omaha, NE 68102 NRC PDR LMarsh BABoger PHartzman r
Dear Dr. Gasper:
Slee i
SUBJECT:
STATUS OF NRC REVIEW OF CE OWNERS GROUP REPORTS In response to your letter of March 30. I am forwarding to you the current status of the NRC review of CE Owners Group reports. My staff understands the current status as follows: of the ten issues discussed at our meeting in January, only four reports (Emergency Procedure Guidelines, RPS/ESFAS Test Interval Extension, RCS Coolant System Leak-Before-Break Justification, and Small Break LOCA Margin Improvement New Evaluation Model Development) have actually been received by the NRC reviewers.
Four other issues are having their reports prepared by CEOG, and as indicated in your letter, the Restructured Technical Specifications issue is being handled through NUMARC.
We understand that CEOG will not issue a topical report on the remaining issue (Charging Pump Performance Improvement Program), but will instead provide a sumary
]
presentation to the NPC upon request.
[
One of the reports the NRC has received, Small Break LOCA Margin Improvement New Evaluation Model Development, was issued by Combustion Engineering in late April.
Although the origin of this report is different (CE versus CEOG), the NRC recomendation that topical reports be submitted on specific dockets in order to irprove their review priority still stands.
i Enclosed is the current status update on all ten issues.
If you have any l
questions on the information enclosed or need additional information, please Contact me.
j Sincerely, l
Origital signed ty
]
Fret J+ Wirad in
)
Frank J. Miraglia Associate Director for Projects l
Office of Nuclear Reactor Regulation
Enclosure:
DRP:ADRI:TA DRP:ADRI RP:DIR T
As stated AJMendiola:ah*
BABoger*
SAYarga 05/lo/88*g j
05/09/88 05/09/88 cc w/ enclosure:
},
i See next page A
j
- see previous concurrence (F i glia b
l 05l^
88 q iJJ n
g gsg* $$a Y
4 1
j
Dr. Joseph Gasper May 11, 1983 cc w/ enclosure:
Mr. Edward Sterling Mr. Ralph L. Phelps Mail Station 7034 Southern California Edison Arizona Public Service Co.
P. O. Box 800 P. O. Box 52034 Rosemead CA 91770 Phoeniz, AZ 85072-2034 Mr. J. T. Enos Mr. Jim Pfiefer Arkansas Power & Light Co.
Combustion Engineering, Inc.
P. O. Box 551 1000 Prospect Hill Road Little Rock, AR 72203-0551 Windsor, CT 06095-0500 Mr. Marvin E. Bowman Mr. Charles Brinkman Baltimore Gas & Electric Co.
Combustion Engineering, Inc.
Calvert Cliffs Nuclear Power Plant 7910 Woodmont Avenue, Suite 1310 Routes 2 A 4 Bethesda, MD 20814 Lusby, MD 20657 Mr. Kenneth Berry Consumers Power Co.
Mail Stop 24614 1945 West Parnall Road Jackson, MI 49201 Mr. John J. Hutchinson Florida Power and Light P. O. Box 14000 Juno Beach, FL 33408 Mr. Michael Meisner Louisiana Power and Light Co.
317 Barenne Street (4th Floor)
New Orleans, LA 70160 Mr. G. Douglas Whittier Maine Yankee Atomic Power Co.
Edison Drive Augusta, NE 04336 Pr. Rik W. Wells NUS-203 Northeast Utilities Service Co.
P. O. Box 270 Hartford, CT 06101
1 i
ENCLOSURE REPORT
_ REVIEW STATUS EMERGENCY PROCEDURE GUIDELINES Report currently in review process.
Cannot make 6/88 review completion date, expect 12/P8 to be a more realistic completion date.
Delay due to change in guideline format, closure of several open issues from previous submittals, and reviewer is part of NRC E0P Evaluation Team.
RPS/ESFAS TEST INTERVAL EXTENSION Report currently in review process.
Currently expect to meet 6/88 review completion date.
JUSTIFICATION OF HIGHER FUEL Report yet to be issued to the NRC for INTERNAL GAS PRESSURE review.
RCS LEAK-BEFORE-BREAK JUSTIFICATION Report currently in review process.
Review has been given a low priority since it has not been connected to any specific docket.
LTOP TRANSIENT LIMIT Report yet to be issued to the Nk0 for review.
SMALL BREAK LOCA MARGIN IMPPOVEMENT Report currently in review process, but NEW EVALUATION MOCEL DEVELOPMENT has been given a low priority since it has not been connected to any specific docket. Review is expected to be very j
detailed and take a long time.
Because 3
a the report utilizes the proposed new rule on 10 CFR 50.46 and Appendix K.
the review of the report cannot be completed until the proposed new rule is in effect. Completion of the review by 12/88 is questionable.
MAIN STEAM LINE LEAK-BEFORE-BREAK Report yet to be issued to the NRC for JUSTIFICATION review.
CHARGING PUMP PERFORMANCE IMPROVEMENT We understand that the CEOG will not I
PROGRAM issue a topical report on this subject, but will instead continue the program l
and provide a summary presentation to
]
the NRC upon request.
RESTRUCTURED TECHNICAL SPECIFICATIONS As discussed, NUMARC is handling this 1
issue separately.
I REFUELING SURVEILLANCE FREQUENCY CEOG work still in progress.
1 EXTENSION i
1
J\\
/pt84 "igg'o UNITED STATES
~ ",
!\\
j NUCLEAR REGULATORY COMMISSION 3 c. -
E WASHING TON, D. C. 20555
/
May 11, 1988 Dr. Joseph K. Gasper, Chainnan Combustion Engineering Owners Group i
c/o Omaha Public Power District l
1623 Harney Omaha, NE 68102
Dear Dr. Gasper:
SUBJECT:
STATUS OF NRC REVIEW OF CE OWNERS GROUP REPORTS In response to your letter of tiarch 30 I am forwarding to you the current status of the NRC review of CE Owners Group reports.
My staff understands the current status as follows: of the ten issues discussed at our meeting in i
January, only four reports (Emergency Procedure Guidelines, RPS/ESFAS Test Interval Extension, RCS Coolant System Leak-Before-Break Justification, and Small Break LOCA Margin Improvement New Evaluation Model Development) have actually been received by the NRC reviewers.
Four other issues are having their reports prepared by CEOG, and as indicated in your letter, the Restructured Technical Specifications issue is being handled through NUMARC. We understand i
that CEOG will not issue a topical report on the remaining issue (Charging Pump Performance Improvement Program), but will instead provide a sumary presentation to the NRC upon request.
One of the reports the NRC has receiveo, %all Break LOCA Margin Improvement New Evaluation Model Development, was issued by Combustion Engineering in late April. Although the origin of this report is different (CE versus CEOG), tne NRC recomendation that topical reports be submitted on specific dockets in order to improve their review priority still stands.
Enclosed is the current status update on all ten issues.
If you have any questions on the information enclosed or need additional information, please contact me.
Sincerely, i
6% $.
li b d
s Frank J(..Miraglit.
Associate Director for Projects j
Office of Nuclear Reactor Regulation
)
Enclosure:
As stated i
ec w/ enclosure:
See next page
p i
l Dr. Joseph Gasper May 11, 1983 cc w/ enclosure:
1 I
Mr. Edward Sterling Mr. Ralph L. Phelps Mail Station 7034 Southern California Edison 1
i Arizona Public Service Co.
P. O. Box 800 d
P. O. Box 52034 Rosemead, CA 91770 i
Phoeniz, AZ 85072-2034 Mr. J. T. Enos Mr. Jim Pfiefer Arkansas Power & Light Co.
Combustion Engineering Inc.
P. O. Box 551 1000 Prospect Hill Road 4
Little Rock, AR 72203-0551 Windsor, CT 06095-0500 4
4 Mr. Marvin E. Bowman Mr. Charles Brinkman Baltimore Gas & Electric Co.
Combustion Engineering, Inc.
Calvert Cliffs Nuclear Power Plant 7910 Woodmont Avenue, Suite 1310
.I Routes 2 A 4 Bethesda, MD 20814 Lusby, MD 70657 Mr. Kenneth Berry Consumers Power Co.
Mail Stop 2a614 1945 West Parnall Road Jackson, MI 49201 i
Mr. John J. Hutchinson L
Florida Power and Light
}
P. O. Box 14000 Juno Beach, FL 33408 Mr. Michael Meisner Louisiana Power and Light Co.
317 Barenne Street (4th Floor) l New Orleans, LA 70160 J
Mr. G. Douglas Whittier Maine Yankee Atomic Power Co.
Edison Drive Augusta, ME 04336 Mr. Rik W. Wells NUS-203 Northeast Utilities Service Co.
P. O. Box 270 l
Hartford, CT 06101 i
i 1
l
7 J
l ENCLOSURE REPORT REVIEW STATUS EMERGENCY PROCEDURE GUIDELINES Report currently in review process.
Cannot make 6/88 review completion date, expect 12/88 to be a more realistic completion date.
Delay due to change in guideline format. closure of several open issues from previous submittals, and reviewr is part of NRC E0P Evaluation Team.
RPS/ESFAS TEST INTERVAL EXTENSION Report currently in review process.
3 Currently expect to meet 6/83 review completion date.
JUSTIFICATION OF HIGHER FUEL Report yet to be issued to the NRC for INTERNAL GAS PRESSURE review.
RCS LEAV-BEFORE-BREAK JUSTIFICATION Report currently in review process.
Review has been given a low priority 3
l since it has not been connected to any specific docket, i
LTOP TRANSIENT LIMIT Report yet to be issued to the NRC for review.
i SMALL BREAK LOCA MARGIN IMPPOVEMENT Report currently in review process, but NEW EVALUATION MOCEL DEVELOPMENT has been given a low priority since it has not been connected to any specific docket.
Review is expected to be very 1
detailed and take a long time.
B9cause the report utilizes the proposed new rule on 10 CFR 50.46 and Appendix K, the review of the report cannot be completed until the proposed new rule is in effect. Completion of the review by 12/88 is questionable.
MAIN STEAM LINE LEAX-BEFORE-BREAX Report yet to be issued to the NRC for JUSTIFICATION review.
CHARGING PUMP PERFORMANCE IMPROVEMENT We understand that the CEOG will not PROGRAM issue a topical report on this subject.
i but will instead continue the program and provide a sunnary presentation to the NRC upon request.
RESTRUCTURED TECHNICAL SPECIFICATIONS As discussed, NUMARC is handling this issue separately.
REFUELING SURVE!LLANCE FREQUENCY CEOG work still in progress.
EXTENSION 4
)
-