ML20135J035
| ML20135J035 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 09/13/1985 |
| From: | Adensam E Office of Nuclear Reactor Regulation |
| To: | Foster D GEORGIA POWER CO. |
| References | |
| NUDOCS 8509250155 | |
| Download: ML20135J035 (3) | |
Text
September 13, 1985 Docket Nos: 50-424 DISTRIBUTION:
and 50-425
-Dacket. File: i NRC PDR local PDR PRC System NSIC Mr. Donald O. Foster LBf4 r/f Vice President and General Manager MDuncan Georgia Power Company MMiller Box 299A, Route 2 OELD, Attorney Waynesboro, GA 30830 ACRS (16)
JPartlow
Dear Mr. Foster:
BGrimes EJordan
Subject:
Vogtle Technical Specifications Review CMoon, TSRG The current schedule for the Vogtle Unit 1 Technical Specifications (Tech Specs) review which the NRC staff has developed is enclosed. This schedule is based on your latest fuel load projection of December 1,1986. The version of the Tech Specs which is to be marked up and submitted to the NRC for evaluation will be transmitted to you by October 21, 1985, in accordance with the enclosed schedule. The NRC staff plans to meet with your staff around October 21 to discuss in detail the Vogtle Tech Specs review.
If there are any questions, contact the Project Manager, Melanie Miller, (301)492-4259.
Sincerely, Elinor G. Adensam, Chief licensing Branch No. 4 Division of licensing
Enclosures:
As stated cc: See next page DES;c"m U Cl?ICt!Lt$
cert 1f,,,B, 8509250155 850913' PDR ADOCK 05000424 A
PDR (U
1 DL:lB #4fV DL:lB #4,
LA:DL:LB,#4 TSRG TSRG MMiller/ah MDuncan CBillups*
MVirgilio* EAdensam 9/ /85 9/ /85 9/ /85 9/ /85 9/(3/85 l
- SEE PREVIOUS CONCURRENCES l-
Mr. Donald Foster Georgia Power Company Vogtle Electric Generating Plant cc:
Mr. L. T. Gucwa Resident Inspector Chief Nuclear Engineer Nuclear Regulatory Commission Georgia Power Company P. O. Box 572 P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302 Mr. Ruble A. Thomas Deppish Kirkland, III, Counsel Vice President - licensing Office of the Consumers' Utility Vogtle Project Council Georgia Power Company /
Suite 225 Southern Company Services, Inc.
32 Peachtree Street, N.W.
P.O. Box 2625 Atlanta, Georgia 30303 Bimingham, Alabama 35202 James E. Joiner Mr. R. E. Conway Troutman, Sanders, lockerman, Senior Vice President - Nuclear
- & Ashmore Power Candler Building Georgia Power Company 127 Peachtree Street, N.E.
P.O. Box 4545 Atlanta, Georgia 30303 Atlanta, Georgia 30302 Douglas C. Teper Mr. J. A. Bailey Georgians Against Nuclear Energy Project Licensing Manager 1253 Lenox Circle Southern Company Services, Inc.
Atlanta, Georgia 30306 P.O. Box 2625 Birmingham, Alabama 35202 laurie Fowler, Esq.
218 Flora Avenue, N.W.
Ernest L. Blake, Jr.
Atlanta, Georgia 30307 Bruce W. Churchill, Esq.
Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.
Washington, D. C.
20036 Tim Johnson Mr. G. Bockhold, Jr.
Executive Director Vogtle Plant Manager Educational Campaign for Georgia Power Company a Prosperous Georgia Route 2, Box 299-A 175 Trinity Avenue, S.W.
Waynesboro, Georgia 30830 Atlanta, Georgia 30303 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323
DEVELOPMENT OF TECHNICAL SPECIFICATIONS FOR V gtle Unit 1
.c s..
, m.
is..
is.c
~.
s rs' *
- a
- =
- =
5
~
t'.'."". '. :is.
u t
F._.". -
,,11.
.c
. ~....
~,..
16
- 0. e m.,
b..tc
.ng A
.*A**
g,ygg
.n.dC sin si....
.n. NA'C Ih T I 6.sv
.?
i
~-
~ ~ ~
=,s I
i i
?
rs r *'
I lil i
i I
I O
I 1
l
~~
l I
I I
10/,21/US
- 1 1
l lb l 11/14/etq i
l i
l l
l 12/01/86< --Appitct 02/28/86 04/18/86 05/16/86 07/18/86 OR/29/86 10/01/R6 10/31/86 11/28/g6 est. FL g
0 i
l i
I L
I I
I I
=
i i4 1
2i i
27 si I
39 44 I
s0 Isalssi n
3: 1 I I
I I
I I
I I
I I I I f
m.
-0 l
17 l
24
' 28 37 43 48 52 z'1 g
5'4 l s'6 l
i l
uss I
i l
i:
I i
i I
l 1
I i
i 1
02/07/86 03/28/8f 05/09/86 06/06/86 08/01/86 09/05/86 10/17/86 l11/21/BC 33/20/87 l
l l
I l
I l
l
~!
l h
11/07/8tl ll 1
l l
Tsmo l
4 c-1 3
I I
l
=,. '
l e.a..n.f l
6 8..>-
De.i TsmG
.h
.an.e i, 4F TsRG
- e. pe-es.i.v s
..w.s.
issG O a' 1 sac isac
+
.i l
u so n.
vsac
.e sin
-c-Tsac u.,,,
is.,s..
O ~,,,,,,aa=
.'..'.'.'"in
.Ts.
.a"c*.*'.." ". ' ' '. '. '
"*n*.*.*.d
".. " ~..
~
. ' ' '. ' ' '. "., - u o'* *'
s e
,m is
.n.
... is
., aw
.i 1s.
.G.n.c Is Im..no.w-is is.a.v
.T..a p c.
e.asc.a t to a v I
.no eye-t c n..
co
==h f.m
- iis im i
-ms e
y.l v.3 f.
. 888 mgl
.gl ts e.y.4 sat d.y.1
==.h k.a Lica "E
P 8,
i.
C
- The three weeks added to the schedule are to allor.' for the Thanksgiving and Christmas-flew Year's holidays.
- i
-