License No. 57F-3 Serial No. 1-131 May 20, 1980 Mr. James G. Keppler, Director Nuclear Regulatory Cc=sission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Keppler:
Toledo Edison acknowledges receipt on May 5, 1980 of your undated I= mediate Action Letter which required certain actions to be taken with regards to the implementation of sections of the Davis-3 esse Nuclear Power Station Unit No. 1 Industrial Security Plan.
Following a thorough examination of the actions outlined, the enclosed response details the current status and the continuing imple=entation actions.
Upon cocpletion of this activity, Toledo Edison considers itself to be in full co=pliance with the I:=ediate Action Letter and consistent with industry practice.
Yours very truly, MC RFC:MRP:j=s Enclosure l
cc:
Mr. Robert N. Reid, Chief Operating Reac;crs 3 ranch No. 4 Divisi:n of Operating Reactors l
U. 3. Nuclear Regulaccry Cecmission
- shington, D. C.
20535
(
-a (p\\ It\\
i Enclosure Contains 10 Cy?. 2.79C (d) Infor ation NE? LICOIO5 N 00'.to n.<
EOSON :'.AZA CCC MA : SON a'<!%E
~0L3 C. CHC 40652 8005280 1