- 05000369/FIN-2016002-01 + (Failure to Perform General Visual Examinations of Containment Moisture Barriers Associated with Containment Liner Leak Chase Test Connections)
- 05000263/FIN-2015003-02 + (Failure to Perform High Radiation Area Portable Fire Extinguisher Surveillances)
- 05000287/FIN-2018002-01 + (Failure to Perform ISI General Visual Examinations of Containment Moisture Barrier Associated with Containment Liner Leak Chase Test Connection Piping)
- 05000287/FIN-2016002-01 + (Failure to Perform ISI General Visual Examinations of Containment Moisture Barrier)
- 05000348/FIN-2012003-01 + (Failure to Perform ISI General Visual Examinations of Containment Moisture Barrier Associated with Containment Liner Leak Chase Test Connection Threaded Pipe Plugs)
- 05000327/FIN-2012005-04 + (Failure to Perform ISI General Visual Examinations of Containment Moisture Barrier Associated with Containment Liner Leak Chase Test Connection Threaded Pipe Plugs)
- 05000395/FIN-2011003-02 + (Failure to Perform ISI General Visual Examinations of Containment Moisture Barrier Associated with Containment Liner Leak Chase Test Connection Threaded Pipe Plugs)
- 05000390/FIN-2015004-01 + (Failure to Perform ISI General Visual Examination of Containment Moisture Barrier Associated with Containment Liner Leak-chase Test Connection Threaded Pipe Plugs)
- 05000255/FIN-2012005-01 + (Failure to Perform Immediate Operability Determination)
- 05000306/FIN-2015001-01 + (Failure to Perform Immediate Operability Determination for 14 CFCU as Required by Procedure)
- 05000413/FIN-2007011-01 + (Failure to Perform Indoctrination and Training of Personnel Performing 10 CFR 72.48 Reviews)
- 05000341/FIN-2014002-04 + (Failure to Perform Inservice Testing of High Pressure Coolant Injection and Reactor Core Isolation Cooling System Valves)
- 05000327/FIN-2011003-01 + (Failure to Perform Instrumentation Surveillance Testing within Required Frequency)
- 05000289/FIN-2013005-02 + (Failure to Perform Leak Rate Testing on Containment Boundary Piping)
- ML100740119 + (Failure to Perform Leak Tests Associated with Shipment of Radioactive Material (Case No. 2-2009-038))
- 05000296/FIN-2014002-03 + (Failure to Perform MSIV As-found Leakage Test Under Suitable Conditions)
- 05000237/FIN-2010005-02 + (Failure to Perform Magnetic Particle Examination on the 3/2/1501-20/20-10 U3 LPCI Support in Accordance with Procedures)
- 05000282/FIN-2012007-02 + (Failure to Perform Maintenance Rule Evaluations After Discovering Degraded Radiation Monitors)
- 05000305/FIN-2011004-02 + (Failure to Perform Maintenance Rule Evaluations for Risk Significant Fire Door Failures)
- 05000354/FIN-2013004-02 + (Failure to Perform Maintenance in Accordance with Station Procedures Led to RCS Pressure Boundary Leakage)
- 05000412/FIN-2015002-02 + (Failure to Perform Maintenance in accordance with Licensee Maintenance Process)
- 05000461/FIN-2017001-04 + (Failure to Perform Maintenance on Residual Heat Removal Pump C Breaker in Accordance with Procedures)
- 05000382/FIN-2017002-05 + (Failure to Perform Maintenance on the Correct Safety-Related Component)
- 05000331/FIN-2018001-01 + (Failure to Perform Nondestructive Examination of Main Steam Isolation Valve 4415 Following Machining of Valve Bore)
- 05000483/FIN-2014004-01 + (Failure to Perform Nondestructive Testing on Essential Service Water Piping in Accordance with Procedures)
- 05000255/LER-2007-001, Failure to Perform Offsite Power Source Check + (Failure to Perform Offsite Power Source Check)
- 05000361/FIN-2009003-05 + (Failure to Perform Operability Determination in a Timely Manner on Safety-related Equipment)
- 05000382/FIN-2016008-02 + (Failure to Perform Operability Determinations for Nonconforming Conditions)
- 05000306/FIN-2014004-01 + (Failure to Perform Operability Determination as Required by Procedure)
- 05000482/FIN-2014007-01 + (Failure to Perform Operability Determinations on Degraded Boundaries)
- 05000275/FIN-2012005-01 + (Failure to Perform Operability Evaluation)
- 05000266/FIN-2012002-08 + (Failure to Perform Operability Evaluations as Required by Procedure)
- 05000416/FIN-2017014-02 + (Failure to Perform Operator Rounds)
- 05000263/FIN-2015008-01 + (Failure to Perform Penetrant Tests in Accordance with Procedural Requirements)
- 05000338/FIN-2009007-01 + (Failure to Perform Periodic TOL Testing on Unit 1)
- 05000424/FIN-2016007-05 + (Failure to Perform Periodic Testing Of Safety-Related Valve Interlocks)
- 05000249/FIN-2008006-01 + (Failure to Perform Periodic Trip Tests on Thermal Overload Heaters)
- 05000293/FIN-2013005-02 + (Failure to Perform Plant Level Maintenance Rule Monitoring)
- 05000361/FIN-2011004-04 + (Failure to Perform Plant Modification in Accordance with Applicable Specifications)
- 05000456/FIN-2011003-03 + (Failure to Perform Post VT-3 Examination Illumination Verification in Accordance with ASME Code)
- 05000483/FIN-2015001-01 + (Failure to Perform Post-maintenance Testing on Safety-related Equipment Prior to Declaring it Operable)
- 05000313/FIN-2016007-12 + (Failure to Perform Predictive Maintenance on Safety-Related Medium-Voltage Switchgear)
- 05000498/FIN-2012005-01 + (Failure to Perform Pressure Testing of the Reactor Vessel Flange LEAK-OFF Lines)
- 05000528/FIN-2012005-02 + (Failure to Perform Pressure Testing of the Reactor Vessel Flange Leak-Off Lines)
- 05000443/FIN-2013008-03 + (Failure to Perform Preventative Maintenance on the Supplemental Emergency Power System)
- 05000416/FIN-2011004-02 + (Failure to Perform Preventative Maintenance on the Fuel Handling Bridge Paddle Switch)
- 05000461/FIN-2010005-02 + (Failure to Perform Preventative Maintenance of Division 1 Self Test System (STS) Power Supply Results in Spurious Repositioning of Safety-Related Valves)
- 05000335/FIN-2012007-01 + (Failure to Perform Preventive Maintenance on the 1B Condensate Pump Discharge Check Valve)
- 05000373/FIN-2016004-03 + (Failure to Perform Preventive Maintenance Resulting in Two Subsequent Unit 1 RCIC Turbine Trips During Surveillance Testing)
- 05000313/FIN-2013004-01 + (Failure to Perform Preventive Maintenance on Plant ProtectionSystem Test Switches)
- 05000461/FIN-2012005-01 + (Failure to Perform Preventive Maintenance on Standby Gas Treatment System Relay 0UAY-VG506D)