Title | Failure to Perform Post VT-3 Examination Illumination Verification in Accordance with ASME Code |
Description | The inspectors identified a finding of very low safety significance and an associated NCV of 10 CFR 50.55a(g)4 when a licensee vendor examiner failed to perform VT-3 visual examinations in accordance with the American Society of Mechanical Engineers (ASME) Code. Specifically the examiner failed to verify the adequacy of illumination following a snubber VT-3 examination. The licensee entered this issue into the corrective action program as IR 1208643 and, following an extent of condition evaluation, re-performed 18 VT-3 visual examinations. The inspectors determined that the licensee examiners failure to verify the adequacy of the illumination level following the examination of a snubber was a performance deficiency. This issue was determined to be more than minor in accordance with IMC 0612, Appendix B, Issue Screening, because it was associated with the Equipment Performance attribute of the Mitigating Systems Cornerstone and affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). Absent NRC identification, the licensee would not have performed the ASME Code-required examinations for a number of components, which could have allowed a rejectable condition to go undetected. The inspectors determined the finding could be evaluated using the SDP in accordance with IMC 0609, Significance Determination Process, Attachment 4, Phase I - Initial Screening and Characterization of Findings, Table 4a for the Mitigating Systems Cornerstone and answered No to the Mitigating Systems Cornerstone questions. Specifically, the issue did not result in the actual loss of the operability or functionality of a safety system. Therefore, the finding screened as having very low safety significance (Green). This finding had a cross-cutting aspect in the Work Practices component of the Human Performance cross-cutting area (H.4(b)) because the licensee did not effectively communicate expectations regarding procedural compliance and licensee personnel did not follow procedures. |
Site: | Braidwood |
---|---|
Report | IR 05000456/2011003 Section 1R08 |
Date counted | Jun 30, 2011 (2011Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.08 |
Inspectors (proximate) | A Garmoe D Betancourt E Duncan J Benjamin J Gilliam J Robbins M Perry N Adorno N Feliz Adorno R Ng T Bilik T Go V Meghani |
CCA | H.8, Procedure Adherence |
INPO aspect | WP.4 |
' | |
Finding - Braidwood - IR 05000456/2011003 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|