Title | Failure to Perform Maintenance on Residual Heat Removal Pump C Breaker in Accordance with Procedures |
Description | Green. The inspectors documented a self-revealed finding of very low safety significance and associated non-cited violation of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures and Drawings, for the licensees failure to perform maintenance on a safety related breaker in accordance with station procedure Clinton Power Station (CPS) 8410.12C001, Westinghouse DHP Circuit Breaker Checklist, Revision 7. Specifically, the licensee failed to ensure the remaining travel on the latch check switch for the RHR C pump breaker was within the acceptable range resulting in the RHR C pump failing to start. The licensee entered this issue into their corrective action program as AR 03949655. The corrective actions taken by the licensee included providing coaching to the involved individuals as well as changing the procedure to include a block to record the latch check switch over travel. The performance deficiency was determined to be more than minor because it impacted the Mitigating Systems cornerstone attribute of equipment performance and adversely affected the cornerstone objective of ensuring the availability, capability, and reliability of equipment that responds to initiating events. Specifically, the performance deficiency adversely impacted the operability of the RHR C pump. The inspectors reviewed the Mitigating Systems screening questions and determined a detailed risk evaluation was required because question A.3 was answered yes. The SRA performed the detailed risk evaluation and concluded the finding was of very low safety significance. The inspectors determined that this finding affected the cross-cutting area of human performance in the aspect of resources, where leaders ensure that personnel, equipment, procedures, and other resources are available and adequate to support nuclear safety. Specifically, the organization failed to ensure the procedure step included a block for recording the latch check switch over travel value, which led to confusion on whether the value was required to be recorded and ultimately resulted in a failure to perform the step as written. [H.1] |
Site: | Clinton |
---|---|
Report | IR 05000461/2017001 Section 4OA3 |
Date counted | Mar 31, 2017 (2017Q1) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71153 |
Inspectors (proximate) | E Sanchez-Santiago G Edwards J Wojewoda K Stoedter S Mischke W Schaup |
Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion V |
CCA | H.1, Resources |
INPO aspect | LA.1 |
' | |