Browse wiki

Jump to navigation Jump to search
The inspectors identified a non-cited violThe inspectors identified a non-cited violation of Units 1 and 2 TS Surveillance Requirement (SR) 4.0.2 for the licensees failure to perform SRs specified in Units 1 and 2 TS 3/4.3.1, Reactor Trip System Instrumentation, and 3/4.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, within the required surveillance frequencies. The inspectors identified eight examples over the last three years (five examples on Unit 1 and three examples on Unit 2) where the interval between tests of the automatic actuation logic and reactor trip breaker functions required by SRs 4.3.1.1.1 and 4.3.2.1.1 exceeded the maximum surveillance interval allowed by TS. The licensee entered this issue into their corrective action program as PER 369938. Corrective actions included ensuring that work control processes correctly implement the required surveillance intervals. The finding was determined to be greater than minor because it was associated with the equipment performance attribute of the mitigating systems cornerstone and affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, extending beyond the required maximum interval between TS surveillance tests affects the ability to confirm continued availability of TS equipment, and the ability to detect potential latent operability concerns in a timely manner. Using Inspection IMC 0609, Significance Determination Process, Attachment 4, Phase 1 - Initial Screening and Characterization of Findings, the finding was determined to be of very low safety significance (Green) since it did not represent an actual loss of safety function of a single train for greater than the associated TS allowed outage time. The inspectors did not identify that the cause of this finding was related to any of the cross-cutting aspects defined in IMC 0310, and therefore no cross-cutting aspect was assigned to this findingutting aspect was assigned to this finding  
23:59:59, 30 June 2011  +
05000327  +  and 05000328  +
23:59:59, 30 June 2011  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
19:06:25, 30 September 2017  +
23:59:59, 30 June 2011  +
Failure to Perform Instrumentation Surveillance Testing within Required Frequency  +