Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML25015A151 + (Draft Second Round RAI Sequoyah Nuclear Plant and Watts Bar Nuclear Plant LAR to Revise TS Table 3.3.2-1, Function 5)
- ML25014A406 + (Draft Second Round Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2. License Amendment Request to Revise Technical Specification 3.3.2-1, Function 5)
- ML041890344 + (Draft Section B Operating)
- ML042190036 + (Draft Section B Operating)
- ML041620470 + (Draft Section B Operating)
- ML041060133 + (Draft Section B Operating)
- ML033100028 + (Draft Section B Operating)
- ML033160348 + (Draft Section B Operating)
- ML042730353 + (Draft Section B Operating (RO & SRO) (Folder 2))
- ML042190061 + (Draft Section C Operating)
- ML041890346 + (Draft Section C Operating)
- ML041060146 + (Draft Section C Operating)
- ML040790024 + (Draft Section C Operating)
- ML033100032 + (Draft Section C Operating)
- ML032880216 + (Draft Section C Operating)
- ML042730356 + (Draft Section C Operating (RO & SRO) (Folder 2))
- ML041620486 + (Draft Section C Operating for Salem, Units 1 and 2)
- ML041890341 + (Draft Section a Operating)
- ML033090626 + (Draft Section a Operating)
- ML042190033 + (Draft Section a Operating)
- ML041400376 + (Draft Section a Operating)
- ML041060130 + (Draft Section a Operating)
- ML033160342 + (Draft Section a Operating)
- ML042730350 + (Draft Section a Operating (RO & SRO) (Folder 2))
- ML041620461 + (Draft Section a Operating for Salem, Units 1 and 2)
- ML23354A258 + (Draft Security RAI Rev 1)
- ML19203A219 + (Draft Secy Paper - Population - Related Siting Considerations for Advanced Reactors)
- ML19078A240 + (Draft Secy Paper and Guidance Documents to Implement a Technology-Inclusive, Risk-Informed, and Performance-Based Approach to Inform the Content of Applications for Licenses, Certifications, and Approvals for Non-Light-Water Reactors)
- ML18108A404 + (Draft Secy Paper, Functional Containment Performance Criteria for Non-Light Water Reactor Designs)
- ML22290A177 + (Draft Secy White Paper on Licensing and Regulating Fusion Energy Systems October 5-7, 2022 Full Committee)
- ML22294A159 + (Draft Secy White Paper on Licensing and Regulating Fusion Energy Systems October 5-7, 2022 Full Committee)
- ML19010A160 + (Draft Seep Monitoring Evaluation Report Mexican Hat, Utah, Umtrca Title I Disposal Site)
- ML20210T959 + (Draft Seismic & Dymanic Qualification of Safety-Related Electrical & Mechanical Equipment in Operating Nuclear Power Plants. Supporting Documentation Encl)
- ML20239A626 + (Draft Seismic Effects on Bodega Bay Reactor. Related Info Encl)
- ML20003A096 + (Draft Seismic Evaluation of Bldg 102 of GE Vallecitos Nuclear Ctr)
- ML20126D952 + (Draft Seismic Hazard Analysis for Savannah River Plant,Sc)
- ML19249B997 + (Draft Seismic Hazard Analysis:Methodology for Eastern Us)
- ML19249C008 + (Draft Seismic Hazard Analysis:Site Specific Response Spectra Results)
- ML111720634 + (Draft Seismic Information Evaluation Flowchart)
- ML19257C273 + (Draft Seismic Re-evaluation Program Criteria Document)
- ML19268B868 + (Draft Seismic Review of Unit for Systematic Evaluation Program Phase 1 Rept)
- ML20204E912 + (Draft Seismic Verification Program)
- ML20234F515 + (Draft Seismicity & Tsunami Rept Bodega Head,Ca)
- ML19338G041 + (Draft Senior Reactor Operator Level Instructor Certification Guide)
- ML14261A276 + (Draft September 23, 2014, Category 1 Public Meeting with V. C. Summer - Draft License Amendment Related to Approval of the Technical Support Center)
- ML20095C690 + (Draft Sequoyah Nuclear Plant Integrated Containment Analysis, Technical Rept)
- ML20128G797 + (Draft Ser,Pump & Valve Inservice Testing Program,Millstone Nuclear Power Station,Unit 1)
- ML20128G780 + (Draft Ser,Pump & Valve Inservice Testing Program,Millstone Nuclear Power Station,Unit 1,for Second 10-Yr Interval)
- ML20065S869 + (Draft Setpoint Calculation for RPS Turbine Control Valve Fast Closure Trip Function)
- ML19102A322 + (Draft Shine Medical Technologies, Inc. - Conforming Amendment to Construction Permit No. CPMIF-001)
- ML13221A393 + (Draft Shine Response to Proposed Action Request 5)