ML041400376

From kanterella
Jump to navigation Jump to search
Draft Section a Operating
ML041400376
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 04/20/2004
From: Christman R
Entergy Nuclear Northeast
To: Conte R
NRC/RGN-I/DRS/OSB
Conte R
References
50-286/04-301
Download: ML041400376 (37)


Text

1 Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Indian Point Unit 3 Task No.:

Task

Title:

Perform a QPTR Calculation JPM No.: A.l WA

Reference:

2.1.7 Ability to evaluate plant Importance (3.714.4) performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: Plant is at 100% power BOL. The Control Roan personal computer is unavailable.

Task Standard:

Required Materials: Calculator, GRAPH NI-2, Blank Quadrant Power Tilt Rate Calculation Form General

References:

SOP-RPC-O05A, GRAPH NI-2 Initiating Cue: You are requested to perform a Manual Quadrant Power Tilt Rate Calculation using Attachment 1 of SOP-RPC-005A Time Critical Task:

Validation Time: 45 Minutes IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 2 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)

Performance Step: 1 Step 1.O ENSURE appropriate meter range for detectors A and B, for each operable NIS Power Range Channel Standard: Ensures range meter indication between 1/3 and 213 of full scale Comment: None Performance Step: 2 Step 2.0 RECORD the date, time, and % power Standard: Date, time, and % power recorded correctly on QPTR Form Comment:

  • Performance Step: 3 Step 3.0 RECORD UPPER and LOWER detector currents on operable NIS Power Range drawers Standard: Candidate demonstrates the ability to obtain readings from the correct meters and records them appropriately in the attachment Comment: Cue: Question the Candidate on how to obtain the detector currents.

Provide the Candidate with detector currents for use in the remainder of the JPM Performance Step: 4 Step 3.1 N/A Standard:

Comment:

IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 3 of 7 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 5 Step 4.0 N/A Standard:

Comment:

  • Performance Step: 6 Step 5.0 CALCULATE (normalized) detector currents Standard: Divide actual Detector Current recorded in Attachment I , Step 3.0 by full power axial offset detector current obtained from last incore/excore calibration (Graph NI-2) 41 Upper 617/610=1.011 41 Lower 635/641=0.991 42 Upper 650/656=0.991 42 Lower 640/633=1.OOl 43 Upper 630/641=0.983 43 Lower 610/611=0.9.98 44 Upper 670/668=1.003 44 Lower 7001711=0.985 Comment: Candidate must find graph NI-2 without prompting. If the candidate takes the numbers to the 4'h decimal place, then the solutions will vary slightly. This effect will be noted later in the JPM.
  • Performance Step: 7 Step 6.0 DETERMINE both upper and lower Average Normalized Ratios Standard: Step 6.1 CALCULATE average normalized ratios for Upper detectors:

= 41 U + 42U + 43U + 44U = 1.011+0.991+0.983+1.003 4 4

- 0.995 Step 6.2 CALCULATE average normalized ratios for Lower detectors:

= 41L + 42L + 43L + 44L = 0.991+1.001+0.998+0.985 4 4 Comment: CUE:

IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION

  • Performance Step: 8 Step 7.0 DETERMINE both upper and lower Quadrant Power Tilt Ratios Standard: Step 7.1 CALCULATE Quadrant Power Tilt Ratio for Upper detectors:

= Highest Ratio of 41U + 42U + 43U + 44U = 1.01I Average Ratio (Step 6.1) 0.995

= 1.016 Step 7.2 CALCULATE Quadrant Power Tilt Ratio for Lower detectors:

= Hinhest Ratio of 41L + 42L + 43L + 44L = 1.001 Average Ratio (Step 6.2) 0.994

= 1.007 Comment: If candidate took the calculations to the bhdecimal place, then 7.2 would be higher. In neither case should I.02 be exceeded.

  • Performance Step: 9 Step 8.0 RECORD highest Quadrant Power Tilt Ratio calculated in Steps 7.1 OR 7.2 Standard: Step 7.1 is the highest and should be recorded Comment: If candidate took the calculations to the $h decimal place, then 7.2 would be higher. In neither case should 1.02 be exceeded.

Performance Step: 10 Step 9.0 DETERMINE if the Highest Quadrant Power Tilt Ratio recorded in Step 8.0 exceeds 1.02 Standard: Quadrant Power Tilt Ratio does not exceed 1.02 so Candidate proceeds to Step 10.0 Comment: The QPTR does not exceed 1.02 therefore the candidate should not proceed to procedure section 4.1.10.

Terminating Cue: Candidate determines in Step 9.0 above that the QPTR does not exceed 1.02 and submits the attachment to the CRS/SM for IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION review. Inform the candidate that the JPM is complete.

IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION

~~ ~~

Job Performance Measure No.:

Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: Plant is at 100% power BOL. The Control Room computer is unavailable.

INITIATING CUE: You are requested to perform a Manual Quadrant Power Tilt Rate Calculation using Attachment 1 of SOP-RPC-OOSA IP3 NRC Admin- NUREG 1021, Revision 9

Upper and Lower Detector Currents For JPM Use 41U = 617 41L = 635 42U = 650 42L = 640 43U = 630 43L = 610 44U = 670 44L = 700

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Indian Point Unit 3 Task No.:

Task

Title:

Perform the CRS Subsequent JPM No.: A.2 Action Steps 4.1-4.17 of 3-AOP-SSD-1 WA

Reference:

2.1.31 Ability to locate control room Importance (4.2/3.9) switches, controls, and indications and to determine that they correctly reflect the desired plant lineup.

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The plant is at 100% power at approximately BOL conditions. All equipment is operable and no maintenance is in progress.

Task Standard: CRS is to obtain 3-AOPSSD-I and perform all Critical Steps within 4.1-4/17 correctly.

Required Materials: NONE General

References:

3-AOP-SSD-1 Initiating Cue: A fire has occurred on the 33 of the Control Building. Many Control Room indicators have failed and/or are operating erratically. The Shift Manager has determined the CCR controls/indications to be unreliable and orders a CCR evacuation. You are to perform the CRS actions of 3-AOP-SSD-1, Steps 4.1 through 4.17.

Time Critical Task:

Validation Time: 30 Minutes IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 2 of 8 Form ES-C-I PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)

Performance Step: 1 Obtain a current revision of 3-AOP-SSD-1 Standard: Candidate demonstrates the ability to obtain a current revision of 3-A0P-SSD-I Comment: When Candidate has demonstrated the ability to obtain and verify a current revision of 3-AOP-SSD-I, provide the Candidate a copy of the procedure for use during this JPM.

Performance Step: 2 Review all three notes prior to step 4.1 Standard: Candidate reviews all three notes prior to step 4.1 Comment: EOPs are not applicable Plant conditions will dictate that all steps are applicable so the CRS should proceed with steps 4.1-4.17.

If asked, examiner should prompt Candidate that all steps are to be performed.

  • Performance Step: 3 Trip the Reactor Standard: Candidate trips the reactor using the pushbutton the panel FCF Comment: None
  • Performance Step: 4 Trip the Turbine Standard: Candidate trips the Turbine using the pushbutton the panel FAF Comment: None
  • Performance Step: 5 Trip both MBFPs Standard: Candidate trips both MBFPs on panel FAF Comment: None IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 3 of 8 Form ES-C-1 PERFORMANCE INFORMATION

  • Performance Step: 6 Trip ALL RCPs Standard: Candidate trips ALL RCPs on panel SAF Comment: None
  • Performance Step: 7 Announce reactor trip and Control Room evacuation over PA and direct watch personnel as follows:

0 Condensate Polisher NPO report to the SG Level Local Control Panel on the 15 el of Auxiliary Boiler Feed Pump Building 0 Remaining watch personnel not involved with Fire Brigade report to the Appendix R locker Standard: Announcement made IAW the procedure Comment: None

  • Performance Step: 8 Direct SM to report to Appendix R locker and initiate 3-AOP-SSD-I at Step 4.18 Standard: Candidate directs SM to Appendix R locker to initiate 3-AOP-SSD-I Comment: None
  • Performance Step: 9 Direct RO to obtain RO set of Security Keys from lock box and initiate Attachment 2 of 3AOP-SSD-1 Standard: Candidate directs RO to initiate Attachment 2 of 3AOP-SSD-I Comment: Obtaining keys is not Critical since this can be accomplished by Security Outside the CCR IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 4 of 8 Form ES-C-I PERFORMANCE INFORMATION

  • Performance Step: I O Direct STA to perform the following:

Contact Security to initiate the EPlan Obtain STA set of Security Keys Initiate Attachment 3 of 3AOP-SSD-I Standard: Candidate directs STA to initiate Attachment 3 of 3-AOP-SSD-1 Comment: Obtaining keys is not Critical since this can be accomplished by Security Outside the CCR

  • Performance Step: 1I Open the following circuits to fail letdown valves and PORVs:

0 32 DCDP Ckt 15 0 31DCDPCkt5 Standard: 31 and 32 DCDPs located and correct breakers opened Comment: None Performance Step: 12 Close HCV-I42 (Charging Line PR. Control)

Standard: HCV-142 located and closed on panel SGF Comment: None Performance Step: 13 Place the following valves in OPEN:

0 PCV-I 31OA (32 ABFP Steam Supply First Isolation)

PCV-I 31OB (32 ABFP Steam Supply Second Isolation)

Standard: PCV-l310A&B control switches on SBF-2 in the open position Comment: None Performance Step: 14 Close ALL MSlVs Standard: All (4) MSlV lockout relays are tripped Comment: None IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 5 of 8 Form ES-C-I PERFORMANCE INFORMATION Performance Step: 15 Place atmospheric steam dump controllers in manual and closed Standard: ALL (4) atmospheric steam dump controller T-bars are in manual and the controller output is at 0%

Comment: None

  • Performance Step: 16 Dispatch Nuclear NPO to perform the following:

0 OPEN CH-288 (RWST to Charging Pump Suction Isolation) 0 De-energize and CLOSE CH-LCV-1 12C (VCT Outlet Valve) 0 CLOSE CH-228 (HCV-142 Inlet Isolation) 0 Report to PZR Pressure and Level Control Panel in the PAB 55 el Standard: Nuclear NPO dispatched to OPEN CH-288, CLOSE CH-228, De-energize and CLOSE CH-LCV-112C, and report to the PZR Pressure and Level Control Panel in the PAB 55 el Comment: None Performance Step: 17 Check the following 480V busses energized:

0 2N3A 0 5A 6A Standard: Candidate checks ALL 480V busses energized using any of the following:

0 480V voltmeters (analog or digital) 0 480V bus energized white lites on SHF Comment: None IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 6 of 8 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 18 Check if Lens Caps for n/ Cameras are removed Standard: Candidate determines that the Lens Caps are off.

Comment: Appropriate tools and safety precautions are required for this task Performance Step: I 9 Obtain the CRS set of Security Keys from the lock box and evacuate to the Appendix R locker Standard: CRS Keys obtained from lock box and Candidate exits the CCR (Simulated CCR).

Comment: None Terminating Cue: When Candidate exits the Simulator, inform himlher that the JPM is complete. Note: If Candidate indicates he/she would exit the CCR and proceed t o the App R Locker inform the JPM is complete as well.

IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 7 of 8 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.:

Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 8 of 8 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: The plant is at 100% power at approximately BOL conditions. All equipment is operable and no maintenance is in progress.

INITIATING CUE: A fire has occurred on the 33 of the Control Building. Many Control Room indicators have failed and/or are operating erratically. The Shift Manager has determined the CCR controls/indications to be unreliable and orders a CCR evacuation.

You are to perform the CRS actions of 3-AOP-SSD-I, Steps 4.1 through 4.17.

IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Indian Point Unit 3 Task No.:

Task

Title:

Independent Valve Lineup JPM No.: A.3 Verification for Safety Injection System in the Vacco filter Room K/A

Reference:

2.2.14 Knowledge of process for Importance (2.1/3.0) making configuration control changes Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The Plant is in CSD at 195F following a Refueling Outage. Preparations are underway to heatup to Mode 4.

Task Standard: COL-SI-1 Section 2.2 Vacco Filter Room valve lineup verification performed correctly Required Materials: Blank COL, Flashlight, Safety EquipmenVPPE General

References:

COL-SI-1, Safety Injection System Initiating Cue: You are directed to perform the initial COL-SI-1, Section 2.2 Valve Lineup Verification for the Vacco Filter Room Time Critical Task: No Validation Time: 45 Minutes IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 2 of 6 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)

Performance Step: 1 Obtain a blank copy of COL-SI-1 Standard: Candidate obtains a copy of COL-SI-1 and verifies it is the current revision Comment: When Candidate demonstrates the ability to obtain the correct COL, you may provide a copy for the examination.

Examiner may question Candidate on how to verify the correct revision in lieu of actual performance at the examiners discretion

  • Performance Step: 2 Verify SHUT Sl-734, RWST Recirculation Pump Suction Isolation Standard: Candidate locates the valve, verifies correct valve using the valve label, and describes to the examiner how to check the valve shut. This can be done by either of the following:
1. Observing the position indicator is aligned perpendicular to the pipe (i.e. flow path)
2. Rotating the handle in the closed direction (clockwise) and checking that the valve hand wheel does not move.

Comment: Examiner should direct Candidate t o explain how to check the valve Shut Performance Step: 3 Verify SHUT SI-16, RWST Recirculation Pump Suction Strainer Drain Standard: Candidate locates the valve, verifies using the valve label, and describes to the examiner how to check the valve shut by rotating the valve in the closed direction and checking that the valve hand wheel does not move.

Comment: Examiner should direct Candidate t o explain how to check the valve Shut Performance Step: 4 Verify SHUT SI-108,RWST Recirculation Pump Seal Water Leak off Isolation Standard: Candidate locates the valve, verifies using the valve label, and describes to the examiner how to check the valve shut by rotating the valve in the closed direction and checking that the valve hand wheel does not move.

IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 3 of 6 Form ES-C-I PERFORMANCE INFORMATION Comment: Examiner should direct Candidate to explain how to check the valve Shut Performance Step: 5 Verify SHUT Sl-845, PI-I0 & RWST Recirculation Pump Discharge Vent Isolation Standard: Candidate locates the valve, verifies using the valve label, and describes to the examiner how to check the valve shut by rotating the valve in the closed direction and checking that the valve hand wheel does not move.

Comment: Examiner should direct Candidate to explain how to check the valve Shut Performance Step: 6 Verify SHUT RWST Recirculation Pump Discharge Vent Standard: Candidate locates the valve, verifies using the valve label, and describes to the examiner how to check the valve shut by rotating the valve in the closed direction and checking that the valve hand wheel does not move.

Comment: Examiner should direct Candidate to explain how to check the valve Shut

  • Performance Step: 7 Verify SHUT WD-474, RWST Recirculation Pump Discharge to Vacco Filter System Isolation Standard: Candidate locates the valve, verifies correct valve using the valve label, and describes to the examiner how to check the valve shut. This can be done by either of the following:
1. Observing the position indicator is aligned perpendicular to the pipe (i.e. flow path)
2. Rotating the handle in the closed direction (clockwise) and checking that the valve hand wheel does not move.

Comment: Examiner should direct Candidate to explain how to check the valve Shut IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 4 of 6 Form ES-C-1 PERFORMANCE INFORMATION

  • Performance Step: 8 Verify SHUT SI-861, RWST Recirculation Pump Discharge to RWST Isolation Standard: Candidate locates the valve, verifies correct valve using the valve label, and describes to the examiner how to check the valve shut. This can be done by either of the following:
1. Observing the position indicator is aligned perpendicular to the pipe (i.e. flow path)
2. Rotating the handle in the closed direction (clockwise) and checking that the valve hand wheel does not move.

Comment: Examiner should direct Candidate to explain how to check CUE:

the valve Shut Terminating Cue: When Candidate has located and verified all specified valves are in their required position, inform candidate the JPM is complete.

IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 5 of 6 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.:

Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 6 of 6 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: The Plant is in CSD at 195F following a Refueling Outage.

Preparations are underway to heatup to Mode 4.

INITIATING CUE: You are directed to perform the initial COL-SI-1, Section 2.2 Valve Lineup Verification for the Vacco Filter Room IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Indian Point Unit 3 Task No.:

Task

Title:

JPM No.: A.4 WA

Reference:

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Act uaI Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE Iwill explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: 1. 32 Monitor Tank has been on recirculation for 4hrs and the chemistry results have been obtained.

2. 32 Monitor Tank is at 88%
3. Monitor Tank Boron weight is 17 pounds I .
4. All Circulators are in service at 310 rpm
5. Radiation monitor R-18 has been out-of-service (00s)for 7 days 6 . Chemistry analysis sample number is 40,000
7. 32 Monitor Tank Boron concentration 197 ppm
8. Allowable diluted concentration per AP-11 is 1.04 E-7 uci/ml
9. Total gamma activity (C) is 3.26 E-7 uci/ml I O . Next sequential release permit number is 5000 Task Standard: Candidate determines the most restrictive discharge rate is 150 gpm based on pump limitations. Note: Candidate may elect to use the most restrictive of activity and boron of 3.503 E+3 gpm for activity since this is the method used in the Attachment 2 Example. This is acceptable as well.

Required Materials: Calculator Release form Attachment 1 Graphs book General

References:

SOP-WDS-014 IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Initiating Cue: Computer is 00s and you are directed to perform a manual liquid release rate calculation IAW 3-SOP-WDS-014, Section 4.1, Steps 4.1.1 through 4.1.13 Time Critical Task:

Validation Time: 60 Minutes IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 3 of 8 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)

Performance Step: I Ensure tank is on recirc per SOP-WDS-006 Standard: Tank is verified on recirc per given information Comment: Given information Performance Step: 2 Determine that computer generated calculation is not available Standard : Candidate refers to step 4.1.3 to perform a manual calculation Comment: Computer unavailable per given information

  • Performance Step: 3 Record pertinent data per procedure step 4.1.3.1 and 2 Standard: Candidate records the following pertinent information:

0 Release ID as 32 Monitor Tank Liquid volume in tank 10,500 gallons 0 Recirc start date and time current values minus 4 hrs 0 Minimum recirc time 4 hrs 0 Earliest sample date and time is current date and time Comment:

Performance Step: 4 Record release permit number Standard: Candidate records 5000 Comment:

Performance Step: 5 Record R-18 in the rad monitor block on permit Standard: Candidate records R-18 Comment:

IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 4 of 8 Form ES-C-I PERFORMANCE INFORMATION Performance Step: 6 Determine if R-18 is in service and circle yes/no Standard: Candidate circles NO Comment:

  • Performance Step: 7 Determine available dilution flow per attachment 7 Standard: Candidate determines flow is 6.9 E+5 gpm Comment: Cue: No Circs are borrowed from Unit 2 Performance Step: 8 When Monitor Tank has recirculated for 4 hrs, then request chemistry to sample the tanks Standard: Determines that the tank has been recirculated and sampled.

Comment: Given information

  • Performance Step: 9 When sample results are obtained, then record information in attachment 1 as follows:

0 Radio analysis sample number 0 Sample Date 0 SampleTime 0 Total Gamma Activity (C)

Allowable diluted concentration per AP-11 0 Boron concentration 0 Boron weight Standard:

Comment: CUE: Inform candidate that the sample has just been taken

  • Performance Step: 10 Request sample gamma activity excluding noble gases from chemistry and verify value is less than 5.0 E-5 MUml Standard: Candidate recognizes the sample activity of 3.26 E-7 is less than 5.0 E-5 Comment: If candidate asks about Noble Gases, inform himlher there are none.

IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 5 of 8 Form ES-C-1 PERFORMANCE INFORMATION

  • Performance Step: 11 Determine the most restrictive discharge rate (D) using attachment 8 Standard: Step 1.O Candidate calculates Dr-2.201 E+5 gpm Step 2.0 Determine pounds of boron in tank are 17 pounds which is given information Step 3.0 Candidate calculates Dc=3.503 E+3 gpm Step 4.1 Candidate determines and records Dc as most restrictive value at 3.503 E+3 Step 5.0 Candidate determines the most restrictive discharge rate (D) is 150 gpm per pump limitations Comment: Note: Boron weight is given so no boron calc is required and this portion is not critical.

The candidate SHOULD determine that D=150 gpm which is the limitation on the pump. However, the candidate may select Dc, since this is the most restrictive of the boron and activity limitations.

This is also the way the computer calculates the limit, AND is used in the given example (attachment 2). Should this discrepancy occur, it could be critiqued, but would not constitute failure of this critical step.

Performance Step: 12 Record data from attachment 8 onto attachment 1 Standard: Candidate records the following on attachment 1:

0 Dr-Permissible Radioactive discharge rate Boron Concentration 0 Pounds of Boron Dc-Maximum Boron (chemistry) discharge rate 0 D-Most Restrictive discharge rate Comment:

  • Performance Step: 13 Candidate skips Step 4.1 .I 2 and performs Step 4. I.I 3 with R-I 8 is out-of-service IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 6 of 8 Form ES-C-1 PERFORMANCE INFORMATION Standard: 1. Candidate recognizes monitor R-I 8 00s 30 days

2. Candidate recognizes second chemistry sample be drawn approximately 15 minutes after the 1 sample
3. Candidate recognizes independent verification of the release calculation is required Comment: 1. When Candidate indicates monitor 00s for 7 days, CUE the Candidate to record current date and time minus 7 days
2. When Candidate recognizes the need for a second sample within 15 minutes, cue Candidate the sample results are the same as given.

Terminating Cue:

IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 7 of 8 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.:

Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 8 of 8 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: 1. 32 Monitor Tank has been on recirculation for 4hrs and the chemistry results have been obtained.

2. 32 Monitor Tank is at 88%
3. Monitor Tank Boron weight is 17 pounds
4. All Circulators are in service at 310 rpm
5. Radiation monitor R-I 8 has been out-of-service (00s)for 7 days
6. Chemistry analysis sample number is 40,000
7. 32 Monitor Tank Boron concentration 197 ppm
8. Allowable diluted concentration per AP-1 Iis I.04 E-7 uci/ml
9. Total gamma activity (C) is 3.26 E-7 uci/ml I O . Next sequential release permit number is 5000 INITIATING CUE: Computer is 00s and you are directed to perform a manual liquid release rate calculation IAW 3-SOP-WDS-014, Section 4.1, Steps 4.1.1 through 4.1.13 IP3 NRC Admin- NUREG 1021, Revision 9

Appendix C Page 1 of 7 Form ES-C-1 PERFORMANCE INFORMATION Facility: Indian Point Unit 3 Task No.: 150*002*05*03 150*002*05*06 150*009*05*03 Task

Title:

Determine EPLAN Classification JPM No.: A.5 Fill out Part IForm Implement EPLAN Classification Flow Chart WA

Reference:

2.4.41-Knowledge of EALS Importance ( 2.3/4.1) thresholds and classifications.

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

The following plant conditions exist following a SGTR:

Initial estimated SGTR leakage was 450 gpm in 32 SG.

The Operators tripped the Rx and Manually Initiated Safety

. Injection.

Following the Rx Trip/SI, the affected SG (32) Safety Valve opened and failed to reseat.

R25 and 26 read 18 Rem/hr

= Wind Speed is 7 mph

. Wind Direction is from 270 degrees Stability Class C Task Standard: Classify the event within 15 minutes and make the proper notifications in accordance with IP-EP-213 and complete all identified critical elements correctly on the part 1 Form within 15 minutes of classifying the event.

Required Materials: Part 1 Forms EAL Tables General

References:

E Plan Volumes 1-3 EAL Tables EAL Technical bases Document E-3 and ECA-3.1 if needed

Appendix C Page 2 of 7 Form ES-C-1 PERFORMANCE INFORMATION Initiating Cue: You are directed to evaluate the following plant conditions, classify the event, fill out the Part 1 form, and make the required initial plant notifications.

Time Critical Task: Yes, the Candidate has 15 minutes to classify the event and 15 minutes to complete the Part 1 form and make initial notifications Validation Time: 30 minutes Performance Step: I Obtains copy of IP-EP-213 and EAL Tables Standard: Obtain most recent copy of IP-EP-213 and EAL Tables.

Comment: Cue-Hand the candidate a copy of IP-EP-213 and indicate that the EAL Tables are available for use.

  • Performance Step: 2 Reviews plant conditions and classifies the event within 15 minutes in accordance with IP-EP-120 Emergency Classification or EAL Table.

Standard: Classifies the event as General Emergency. A SGTR is in progress in conjunction with a loss of Containment due to a significant secondary line break (Safety Valve stuck open on the affected SG), and actual or potential loss of fuel clad integrity Record start time Time required to classify the event 15 Minutes The actual time the Candidate classified the event The Candidate must correctly classify the event within 15 minutes of the initiating cue.

Comment: The EAL Bases document and E-3/ECA3.1 are available if the candidate requests them.

Performance Step: 3 If the initial emergency classification is due to a security event, then consider mobilization of the ERO to either primary or backup locations, or suspending initial mobilization.

Standard: Determine that the initiating event is not due to a security event.

Comment:

Performance Step: 4 Confer with Unit 2 SM. If agreed that both units are affected then the Unit 2 SM shall classify the event and assume the role of the Emergency Director.

Standard: Recommends to Unit 2 SM that the event effects only Unit 3.

Appendix C Page 3 of 7 Form ES-C-1 PERFORMANCE INFORMATION Comment: Que as Unit 2 SM that the event only affects Unit 3.

  • Performance Step: 5 If a General Emergency is declared then protective action recommendations must be made in accordance with IP-EPO-410, Protective Action recommendations.

Standard: Protective Action Recommendations to Evacuate a 2-Mile radius shelter ERPAs (xx) downwind are communicated to the State and Counties Comment:

Performance Step: 6 Ensure Unit 2 Control Room is notified of the emergency.

Standard: Simulates calling the Unit 2 CCR and reports a General Emergency is being declared due to A SGTR is in progress in conjunction with a loss of Containment due to a significant secondary line break (Safety Valve stuck open on the affected SG), and actual or potential loss of fuel clad integrity Comment: Que that Unit 2 has been notified of the General Emergency.

Performance Step: 7 Declare the emergency and announce the classification to Control Room Personnel.

Standard: Gives Update to control room personnel. declaring THAT a General Emergency has been declared because A SGTR is in progress in conjunction with a loss of Containment due to a significant secondary line break (Safety Valve stuck open on the affected SG), and actual or potential loss of fuel clad integrity Comment:

Performance Step: 8 Conduct Notification and Mobilization for a General Emergency using IP-EP-115 Form EP-4)

Standard: Locates and Implements IP-EP-115 Form EP-4, Control Room Initial Notification Checklist Comment:

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 8 Ensure Both Unit 2 and Unit 3 Site Assembly alarms are sounded for 30 seconds and the appropriate announcements are made.

Standard: Simulate sounding the Evacuation alarm for 30 seconds and make the following announcement three times: Attention all personnel, a GENERAL EMERGENCY has been declared. All Personnel report to your assigned facility. All other personnel report to the Training Center. Repeats two more times.

Comment: CUE: Tell Candidate he/she may simulate these actions Performance Step: 9 Notify the Security Shift Supervisor and provide them with the affected unit and the datehime of the classification. Request the Offsite Communicator Report to the Control Room.

Standard: Security contact at 736-8067 and inform that an GENERAL EMERGENCY has been declared on Unit 3 due Comment:

Performance Step:lO Contact Unit 2 and direct notification using Envelope A IPEC ALL ERO Mobilization to mobilize all ERO.

Standard: Unit 2 notified to use Envelop A to mobilize ERO.

Comment:

Performance Step: I 1 Notify State and Counties using the RECS line E Standard: The Offsite communicator is directed to initiate a roll call using the RECS line.

Comment: CUE:

  • Performance Step: 12 Complete or have completed and sign a NYS Radiological Emergency Data Form, Part I-IP-EP-I 15 Form EP-1) within 15 minutes.

Appendix C Page 5 of 7 Form ES-C-I PERFORMANCE INFORMATION Standard: The part 1 form must be completed and signed within 15 minutes of event declaration. The following steps are critical steps.

0 Step 6 Either C or D selecte 0 Step 7 B. Evacuate and circle the correct ERPAs 0 Step 8 EAL Number and Description 0 Step 11 Wind Speed 0 Step 12 Wind Direction 0 Step Stability Class C Comment:

  • Performance Step: 13 Inform JPM Evaluator that the JPM is complete.

Standard:

Comment: CUE: Acknowledge that the JPM is complete.

Terminating Cue: Event properly classified, Part 1 form complete, and initial notifications are complete with the required time frames.

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.:

Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

INITIATING CUE: