is PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET 3.1/3.1 SIR0 64.0P.007.151 1
02/11 /04 202002 A2.05 Appl. To JPM Number Rev. No.
Date NUREG 1123 Sys. No.
WA Task
Title:
Reset A Fluid Drive Scoop Tube Lock IAW OP-164-001 Completed By:
Reviews:
Russ Halm Writer Date I nstructorNV ri ter Date Approval:
Requesting Supv./C.A.
Date Nuclear Trng. Supv.
Date Head Date of Performance:
JPM Performed By:
L 10 Allowed Time (Min.)
Time Taken (Min.)
Student Name:
Last First M. I.
Employee #/S.S. #
Performance
(
)
Satisfactory
(
)
Unsatisfactory Evaluation:
Evaluator Name:
Signature Typed or Printed Comments:
- b.
STCP-QA-125A Rev. 2, (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1 File NO. A14-5B
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SlRO 64.0P.007.151 I. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
1, Whenever any electrical panel is opened for inspection during JPM performance.
- 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
II. REFERENCES OP-I 64-001, Reactor Recirculation System (Revision 38) 111. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):
34 Reset Recirculation Scoop Tube Lock IV. TASK CONDITIONS
-i A. The plant is in Mode 1 @ 95 O h power.
B. Scoop Tube Lock has occurred on B Recirc MG Set.
C. The condition which caused the Scoop Tube Lock has been corrected.
V. INITIATING CUE Reset the Fluid Drive Scoop Tube Lock.
VI. TASK STANDARD 5 Recirculation MG Scoop Tube Lock is reset, then re-locked when speed is determined to be increasing rapidly.
VII. TASK SAFETY SIGNIFICANCE Potential Unanticipated positive reactivity addition U
2004 NRC Exam Rev. 1
\\
PERFORMANCt CHECKLIST Appl. To/JPM No.: 64.0P.007.151 Step Action EVALUATOR NOTE:
0 Establish task conditions as directed on attached setup instructions.
The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS.
When student is ready to begin JPM, place the simulator in RUN.
0 0
Simulator Setup 0
Place Simulator in RUN 0
Run batch file RRB.STLBJPM.
0 Select any MODE 1 100% IC.
Manually runback recirc flow to achieve 95%
power Depress B Reactor Recirc Controller INCREASE pushbutton to ensure controller is saturated.
- Critical Step
- Critical Sequence Student Name:
Standard Eva1 c
Page 3 of 8 Comments STCP-QA-1256 Rev. 2 (9193)
Page 1 of 1 2004 NRC Exam Rev. 1
PERFORMANCt CHECKLIST Page 4 of 8 i
Appl. To/JPM No.: 64.0P.007.151 Step Action Simulator Operator 0
Select Recirc Screen RR6.
0 AND 0
Servo Controller Demand XI-140328.
As NPO, direct student to change demand until signals are matched.
During this JPM you will be required to ROLE play as the in plant NPO at the scoop tube positioner.
Monitor Tachometer Generator Speed Si-I 4032B Obtain a controlled copy of OP-164-001, Reactor Recirculation System Select the correct section to perform.
Review the prerequisites.
EVALUATOR CUE:
Inform the student all prerequisites have been met.
Review all precautions.
- Critical Step
- Critical Sequence Student Name:
Standard Controlled copy obtained.
Selects section 2.6 Ensures all prerequisites have been met.
Follows all precautions as applicable.
Eva1 Comments STCP-QA-1258 Rev. 2 (9193)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.: 64.0P.007.151 Step 5
6 7
PERFORMANCE CHECKLIST Action ENSURE Reactor Recirculation Pump B Speed Controller SY-B31-1 R621 B is in MANUAL OBSERVE White indicator light above Scoop Tube B LOCK OR RESET HS-B31-1S03B pushbutton ILLUMINATED REMOVE the enclosure cover from the amplifier at 1 CBI 37B and ESTABLISH communication between the Control Room and the scoop tube positioner /
amplifier.
EVALUATOR CUE:
Role-play as NPO at scoop tube positioner, report that enclosure cover is removed.
- Critical Step
- Critical Sequence Student Name:
Standard Verifies:
Reactor Recirculation Pump B Speed Controller SY-B31-1 R621 B AMBER MANUAL light LIT Verifies:
White indicator light above Scoop Tube pushbutton LIT B LOCK OR RESET HS-B31-1 S03B Contacts in plant NPO and directs removal of enclosure cover and Establishes communication between the Control Room and the scoop tube positioner / amplifier.
Eva1
(
Page 5 of 8 Comments STCP-QA-1258 Rev. 2 (9193)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.: 64.0P.007.151 Step 3rc8 i
PERFORMANCt CHECKLIST i
Page 6 of 8 Action Restoration Of Scoop Tube Lock Without Having Taken Manual Control At Positioner If the scoop tube lockout condition is being reset without having taken manual (i.e. hand crank) control at the positioner 1 S I 37B, perform the following steps:
MATCH the controller demand and scoop tube position signals as displayed at 1 CB137B on the amplifier digital display (see Attachment B), by increasing or decreasing controller SY-B31-1 R621 B output.
EVALUATOR NOTE:
PlCSY group display STDP 83 may be used to help match speeds BOOTH CUE:
0 0
0 ROLE play as NPO at scoop tube positioner.
Monitor Tach Generator Speed SI-14032B and Servo Controller Demand XI-140328.
Direct student to change demand until signals are matched.
- Critical Step
- Critical Sequence Student Name:
Standard Communicates with in plant NPO, and adjusts SY-B31-1 R621 B controller output with the INCREASE and DECREASE pushbuttons until signals match Eva1 Comments STCP-CIA-1255 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.: 64.0P.007.151 Step
- 9 10
- I 1
12 i
PERFORMANCt CHECKLIST 5
Page 7 of 8 Action FAULT STATEMENT RRP B WILL EXPERIENCE AN UNCONTROLLED SPEED INCREASE AFTER THE SCOOP TUBE LOCK IS RESET.
DEPRESS SCOOP TUBE B LOCK OR RESET HS-B31-1S03B RESET push button - 4 to 5 seconds (to allow position amplifier timer to clear and reset logic to seal in).
MONITOR GEN 1B SPEED SI-14032B.
If speed increases rapidly, TRIP scoop tube on affected generator by depressing SCOOP TUBE LOCK OR RESET HS-B31-1S03B TRIP push button.
Notify Shift Supervision.
- Critical Step
- Critical Sequence Student Name:
Standard Depresses and holds for 4-5 seconds Scoop Tube B Lock Reset pushbutton HS-B31-1 S03B.
Checks:
GEN 1 B SPEED SI-14032B Determines speed is rapidly increasing Depresses SCOOP TUBE LOCK OR button.
Verifies:
GEN 1 B SPEED SI-14032B stops rising RESET HS-B31-1S03B TRIP push Informs Shift Supervision that RRP B has been locked due to uncontrolled speed increase.
Eva1 Comments STCP-QA-125B Rev. 2 (9193)
Page 1 of 1 2004 NRC Exam Rev. 1 i,
Appl. To/JPM No.: 64.0P.007.151 Eva1 Step Comments 13 PERFORMANCt CHECKLIST Action At 1 C137B REPLACE the cover on the scoop tube position amplifier.
EVALUATOR CUE:
That completes this JPM
- Critical Step
- Critical Sequence Student Name:
Standard Contacts in plant NPO and directs replacing enclosure cover.
(.
Page 8 of 8 STCP-QA-125B Rev. 2 (9193)
Page 1 of 1 2004 NRC Exam Rev. 1
TASK CONDITIONS 4
A.
B.
C.
The plant is in Mode 1 @ 95 YO power.
Scoop Tube Lock has occurred on B Recirc MG Set.
The condition which caused the Scoop Tube Lock has been corrected.
INITIATING CUE Reset the Fluid Drive Scoop Tube Lock.
2004 NRC Exam Rev. 1 1 of2
TASK CONDITIONS A.
B.
C.
The plant is in Mode 1 @ 95 % power.
Scoop Tube Lock has occurred on B Recirc MG Set.
The condition which caused the Scoop Tube Lock has been corrected.
I W
INITIATING CUE Reset the Fluid Drive Scoop Tube Lock.
2004 NRC Exam Rev. 1 2 of 2
PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET v
SIR0 70.0P.004.151 0
1 / I 6/04 261000 A3.01 3.213.3 Appl. To JPM Number Rev. No.
Date NUREG 1123 Sys. No.
WA Task
Title:
Perform a Manual Startup of the SGTS in Accordance With OP-070-001 Completed By:
Reviews:
Russ Halm Writer Date Instructor/Writer Date Ap prova I :
Requesting Supv./C.A.
Date Nuclear Trng. Supv.
Date Head 10120 Date of Performance:
Allowed Time (Min.)
Time Taken (Min.)
L, JPM Performed By:
Student Name:
Last First M.I.
Employee #/S.S. #
Performance
(
)
Satisfactory
(
)
Unsatisfactory Evaluation:
Evaluator Name:
Signature Typed or Printed Comments:
STCP-QA-125A Rev. 2, (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1 File No. A14-5B
v REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 70.0P.004.151
- 1.
SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
- 6. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
- 1. Whenever any electricai panel is opened for inspection during JPM performance.
- 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
II. REFERENCES OP-070-001, Standby Gas Treatment System (Rev. 19)
AR-029-001 SGTS A FILTER TRAIN FAILED (AI 1) (Revision 21)
II I. REACTIVITY MAN I P U LATIONS This JPM satisfies the requirements of Operational Activity(s):
NONE
...-l IV. TASK CONDITIONS A. Unit 1 is operating in Mode 1
- 6. The HPCl System is to be started up for surveillance.
C. The SGTS is aligned for automatic initiation in accordance with OP-070-001.
D. All prerequisites are met.
V. INITIATING CUE Your Supervisor directs you to Perform a manual startup of SGTS A.
VI. TASK STANDARD Identifies the FAILED CLOSED SGTS MAKEUP OA DMP FD07551A2 damper and secures SGTS Fan OVl09A.
VII. TASK SAFETY SIGNIFICANCE Provides the ability to perform HPCl operability surveillance.
2004 NRC Exam Rev. 1
i Appl. To/JPM No.: 70.0P.004.151 1
2 3
4
- 5 PERFORMAN& CHECKLIST Action EVALUATOR NOTE:
This JPM must be performed in the simulator.
Select any Mode 1 100% IC Run batch file IGBSBGTAFAIL When student is ready to begin JPM, place the simulator in RUN.
Obtain a controlled copy of OP-070-001 Standby Gas Treatment System, Select the correct section to perform.
Review the prerequisites.
EVALUATOR CUE:
Inform the student all prerequisites have been met.
Review all precautions.
At Panel OC681, DEPRESS SGTS Clg OA Dmp HD07555A OPEN pushbutton.
- Critical Step
- Critical Sequence Student Name:
Standard Controlled copy obtained.
Selects section 3.2 Ensures all prerequisites have been met.
Follows all precautions as applicable.
Depresses SGTS CLG OA DMP HD 07555A OPEN pushbutton.
Eva1
(,
Page 3 of 9 Comments STCPQA-1258 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
i Appl. To/JPM No.: 70.0P.004.151 Step 6
5 7 8
PERFORMANCE CHECKLIST Action
~~
~
OBSERVE SGTS Clg OA Dmp HD07555A OPENS to allow suction flow path for start of SGTS Fan A.
At Panel OC681, START Standby Gas Treatment System A by placing selector switch for SGTS Fan OV109A to START.
When Fan starts, OBSERVE flow increases >3000 cfm on SGTS Air Flow FR07553A.
EVALUATOR NOTE:
SGTS Fans may not obtain 10,100 cfm due to insufficient suction flow path through SGTS Makeup OA Dmp FD07551A2.
EVALUATOR NOTE:
Flowrate for this JPM should be (-4,800 CFM)
- Critical Step
- Critical Sequence Student Name:
Standard Verifies:
Red Light is LIT and Amber Light is NOT LIT for SGTS CLG OA DMP HD 07555A Places selector switch for SGTS FAN OV109A to START Verifies:
Red Light is LIT and Amber AND White Lights are NOT LIT Verifies:
increases to greater than 3000 CFM.
SGTS AIR FLOW FR-07553A Eva1 Page 4 of 9 Comments STCP-QA-125B Rev. 2 (9193)
Page 1 of 1 2004 NRC Exam Rev. 1
{
PERFORMANCE CHECKLIST Page 5 of 9 Appl. To/JPM No.: 70.0P.004.151 Step 9
10 11 Action CHECK following positioned as indicated:
SGTS Fan Inlet Dmp HD07552A FULL OPEN.
SGTS A Inlet Dmp HD07553A FULL OPEN.
EVALUATOR NOTE:
When OA DMP FD 07551A2 reaches FULL OPEN it will FAIL CLOSED causing AR-029-001 (AI 1) SGTS A FILTER TRAIN FAILED alarm to actuate. Fan OV109A will ALSO fail to trip.
SGTS Makeup OA Dmp FD07551A2 MODULATED/OPEN approximately 70 seconds after SGTS Fan OV109A started.
- Critical Step
- Critical Sequence Student Name:
Standard Verifies:
Red Light is LIT and Amber Light is NOT LIT for SGTS FAN INLET DMP HD 07552A Verifies:
Red Light is LIT and Amber Light is NOT LIT for SGTS A INLET DMP HD 07553A Approximately 70 seconds after SGTS Fan OV109A started.
Verifies:
SGTS Makeup OA DMP FD 07551A2 BOTH Red Light and Amber Light LIT Eva1 Comments STCP-QA-1258 Rev. 2 (9193)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.: 70.0P.004.151 Step 12 13
(
PERFORMANCt CHECKLIST Action FAULT STATEMENT:
OA DMP FD07551A2 fails CLOSED. Fan OV109A will ALSO fail to trip EVALUATOR NOTE:
Candidate may STOP SGTS FAN OVl09A before alarms due to loss of suction flowpath. If the candidate stops the fan at this time, it would not be necessary to perform the remaining steps of the AR.
This is acceptable.
AR-029-001 (AI I ) SGTS A FILTER TRAIN FAILED Acknowledges AR-029-001 (AI I ) SGTS A FILTER TRAIN FAILED alarm Refers to appropriate alarm response procedure.
- Critical Step
- Critical Sequence Student Name:
Standard Selects AR-029-001 (AI 1) SGTS A FILTER TRAIN FAILED Eva1 Page 6 of 9 Comments STCP-OA-125B Rev. 2 (9193)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.: 70.0P.004.151 Step 514 15 16 17 PERFORMANCt CHECKLIST Page 7 of 9 Action If no initiation signal present, CHECK SGTS FAN OVI 09A tripped.
CHECK SGTS AIR FLOW & HEPA FlLT PRESS DlFF FR07553A. SGTS AIR FLOW should be approximately 10,100 cfm.
CHECK HIC07555A on Panel OC883A is set at 45.
EVALUATOR CUE:
Role-play as NPO and acknowledge the request.
Inform candidate that HIC07555A is set at 45 CHECK SGTS Fan OVI 09A supply breaker MCC OB13601 1, thermal overloads and control power fuse.
- Critical Step
- C ri t ica I Seq uence Student Name:
Standard Checks:
SGTS FAN OV109A red light LIT and Amber light NOT LIT Places control switch for SGTS FAN OV109A to STOP Verifies:
SGTS FAN OV109A red light NOT LIT and Amber light LIT Determines not applicable since Fan is tripped Contacts NPO to check HIC07555A is set at 45 Determines not applicable.
Eva1 Comments STCP-QA-1258 Rev. 2 (9193)
Page 1 of 1 2004 NRC Exam Rev. 1 1
I
Appl. To/JPM No.: 70.0P.004.151 Step 18 19 20 21 PERFORMANCt CHECKLIST
~
~~
Action If fan tripped after starting time delay, CHECK fan integrity.
COMPLY with TS 3.6.4.3 and TR 3.6.1.
If Zone 3 Secondary Containment Isolation signal present, CONFIRM SGTS FAN OV109A trips when Zone 3 lockout relay XY07553A reset.
EVALUATOR CUE:
That completes the RO portion of the JPM.
EVALUATOR CUE:
FOR SRO CANDIDATES ONLY Give the SRO candidate the second cue sheet that addresses the Tech Spec LCO for the inoperable SGTS.
Obtains a copy of Tech Specs
- Critical Step
- Critical Sequence Student Name:
Standard Determines not applicable.
Informs supervisor to refer to TS 3.6.4.3 and TR 3.6.1.
Determines not applicable.
References Tech Spec 3.6.4.3 and TR 3.6.1 Eva1 Page 8 of 9 Comments STCP-QA-1258 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.: 70.0P.004.151 Step
- 22 PERFORMANCE CHECKLIST Action Determines required actions EVALUATOR CUE:
This completes the JPM.
- Critical Step
- Critical Sequence Student Name:
Standard Determines the following actions will be required per 3.6.4.3 action A:
Within 7 days Restore the inoperable SGTS to operable status.
(TR 3.6.1 is not applicable since no purging or venting is in progress) i-Page 9 of 9 Eva1 I Comments STCP-QA-I 258 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
=..-.-
SRO ONLY TASK CONDITIONS The Plant is in Mode I.
A.
A Train of Standby Gas Treatment System has just been declared inoperable.
INITIATING CUE What Technical Specifications action@), including time limits, idare required as a result of this failure?
2004 NRC Exam Rev. 1 I
O f 4
SRO ONLY TASK CONDITIONS The Plant is in Mode 1.
A.
A Train of Standby Gas Treatment System has just been declared inoperable.
INITIATING CUE What Technical Specifications action@), including time limits, idare required as a result of this failure?
2004 NRC Exam Rev. I
TASK CONDITIONS A. Unit 1 is operating in Mode 1.
B. The HPCl System is to be started up for surveillance.
C. The SGTS is aligned for automatic initiation in accordance with OP-070-001.
D. All prerequisites are met.
INITIATING CUE i_,
Your Supervisor directs you to Perform a manual startup of SGTS A.
2004 NRC Exam Rev. I 3 0 f 4
TASK CONDITIONS
-.../-
A. Unit 1 is operating in Mode 1.
B. The HPCl System is to be started up for surveillance.
C. The SGTS is aligned for automatic initiation in accordance with OP-070-001.
D. All prerequisites are met.
INITIATING CUE Your Supervisor directs you to Perform a manual startup of SGTS A.
2004 NRC Exam Rev. I 4 o f 4
SGTS A FILTER TRAIN FAILED (A1 1)
SETPOINT:
ORIGIN:
AR-029-001 Revision 21 Page 11 of 59 A1 1 2000 cfm 62FSLX-07551 A ( FSLO7551 A ),
62PDSLLX-07553A ( PDSLL-07553A )
74-13601 1 overload, or
- 1.
PROBABLE CAUSE:
1.1 1.2 Mechanical failure of fan.
1.3
-Loss of fan control power.
1.4 HIC07555A not set at 45 (approx. 4500 CFM).
1.5 If Zone 3 Secondary Containment Isolation signal present, low flow condition may have occurred immediately following the SGTS initiation. Alarm will seal in even though SGTS flow returns to normal. When lock-out on OC681 is-GseTaXd SBGT is taken to off to reset logic, the alarm should clear.
Fan Motor overload or electrical fault.
(')
- 2.
OPERATOR ACTION:
2.1 2.2 2.3 2.4 2.5 2.6 2.7 If no initiation signal present, CHECK SGTS FAN OV1 09A tripped.
CHECK SGTS AIR FLOW & HEPA FlLT PRESS DlFF FR07553A. SGTS AIR FLOW should be approximately 10,l 00 cfm.
CHECK HIC07555A on Panel OC883A is set at 45.
CHECK SGTS Fan OV109A supply breaker MCC OB13601 1, thermal overloads and control power fuse.
If fan tripped after starting time delay, CHECK fan integrity.
COMPLY with TS 3.6.4.3 and TR 3.6.1.
If Zone 3 Secondary Containment Isolation signal present, CONFIRM SGTS FAN OV109A trips when Zone 3 lockout relay XY07553A reset.
(')
- 3.
AUTOMATIC ACTION:
3.1 3.2 If Zone 3 Secondary Containment Isolation signal present, no automatic actions occur.
If Zone 3 Secondary Containment Isolation signal present, SGTS FAN OV109A trips.
- 4.
REFERENCE:
4.1 E-332 4.2 VC-175 4.3 V-175 4.4 E-201 4.5 TS 3.6.4.3 4.6 TR3.6.1 4.7
(')
CR 97-0623 both SGTS Fans tripped when Restoring from swap of RPS.
PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE U-APPROVAL AND ADMINISTRATIVE DATA SHEET S/RO 24.0P.006.102 1
0 1 /19104 264000 A4.04 3.713.7 Appl. To JPM Number Rev. No.
Date NUREG 1123 Sys. No.
KIA Task
Title:
Manually Synchronize Diesel Generator A to 4.16 KV Bus 1A from Panel OC653 in Accordance With OP-024-001 Completed By:
Reviews:
Russ Halm Writer Date InstructorNVriter Ap p rova I:
Requesting Supv./C.A.
Date Nuclear Trng. Supv.
Head Date of Performance:
JPM Performed By:
/
a Date Date 20 Allowed Time (Min.)
Time Taken (Min.)
Student Name:
Last First M.I.
Employee #lS.S. #
Performance
(
)
Satisfactory
(
)
Unsatisfactory Eva I ua t ion:
Evaluator Name:
Signatu re Typed or Printed Comments:
STCP-QA-125A Rev. 2, (9193)
Page 1 of 1 2004 NRC Exam Rev. 1 File No. A14-5B
5u-REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SlRO 24.0P.006.102
- 1.
SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
- 1. Whenever any electrical panel is opened for inspection during JPM performance.
- 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
II. REFERENCES OP-024-001 Diesel Generator (Revision 40) 111. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):
NONE IV. TASK CONDITIONS A.
B.
C.
D.
Diesel Generator A was started manually from OC653 in accordance with OP-024-001, Diesel Generator and has been running unloaded for 15 minutes.
No other diesel generator is operating synchronized to the grid.
A NPO is stationed at the diesel.
Air intake manifold temperatures are being controlled in AUTOMATIC.
V. INITIATING CUE Manually synchronize Diesel Generator A with 4.16 KV Bus 1A and pick up 3600 to 4000 KW of load IAW OP-024-001, Diesel Generator section 2.3.
VI. TASK STANDARD Diesel Generator A synchronized to 4.16 KV Bus I A and loaded to 3600 to 4000 KW without causing any automatic Diesel generator trips to occur.
VII. TASK SAFETY SIGNIFICANCE Verifies operability of a safety related electrical power source.
2004 NRC Exam Rev. 1
PERFORMANCt CHECKLIST Appl. To/JPM No.: 24.0P.006.102 Step I
Action EVALUATOR NOTE:
0 0
This JPM must be performed in the simulator.
Manually start A D/G IAW OP-024-001 section 2.2 MANUAL START OF DIESEL GENERATOR A(B)(C)(D)(E) FROM PANEL OC653 Start A & B ESW pumps Fill out a DG start log for the A DG.
0 The following conditions should then exist:
0 DG A Watts - 0 0 DG A Amps - 0 0 DG A Freq - -60 Hz 0 Ready to Run Light illuminated 0 DG A Gov Mode Sel HS-00055A - DROOP 0 DG A Volt Reg Mode Sei HS-00056A - AUTO 0 DG A to Bus I A Bkr 1A20104 - OPEN 0 DG A to Bus 1A Synch Set HS-00039A - OFF 0 The PMS CRT is displaying the DG electrical screen When student is ready to begin JPM, place the simulator in RUN.
Obtain a controlled copy of OP-024-001 Diesel Generator DG A Volts - -4,200 VAC
- Critical Step
- Critical Sequence Student Name:
Page 3 of 11 Standard Controlled copy obtained.
Eva1 Comments STCP-CIA-1250 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.: 24.0P.006.102 2
3 4
4
(
l PERFORMANCt CHECKLIST Page 4 of 11 Action Selects the correct section to perform.
EVALUATOR NOTE:
Due to the nature of this JPM, it may be necessary to allow the candidate to check the prerequisites and precautions. This is acceptable.
Review the prerequisites.
Review the precautions.
EVALUATOR NOTE:
During synchronizing or load changes, increasing voltage adjust will reduce negative (in) WARS and decreasing voltage adjust will reduce positive (out)
WARS.
EVALUATOR NOTE:
When the sync switch is placed in the ON position the synchroscope pointer will start moving (either direction), the white light on each side of the synchroscope will flash off and on as the pointer rotates.
- Critical Step
- Critical Sequence Student Name:
Standard Selects section 2.3 Ensures that all prerequisites have been met.
Follows the precautions as applicable.
Eva1 Comments STCP-QA-1258 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.: 24.0P.006.102 Step
- 5
- 6 7
PERFORMAN& CHECKLIST Page 5 of 11 (
Action AFTER diesel generator run unloaded 5 minutes or as required during emergency, Synchronize Diesel Generator A to 4.16KV Bus IA, as follows:
Place DG A to Bus 1A Sync Sel HS-00039A switch to ON.
Adjust DG A Voltage Adjust HS-00053A so red scale 4 KV Diff AC Volts XI-00036 indicates slightly right of 0 and not exceed 35 volts AC. The Green Band on XI-00036 is the acceptable area.
EVALUATOR NOTE:
The FAST direction on the Synchroscope is clockwise.
Adjust DG A Speed Governor HS-00054A so Synchroscope XI-00037 rotating in FAST (clockwise) direction at - 1 (one) revolution per 60 seconds.
- Critical Step
- Critical Sequence Student Name:
Standard Inserts Key into DG A to Bus 1A Sync Sel HS-00039A switch and places in the ON position.
Places the DG A Voltage Adjust HS-00053A switch to the RAISE or LOWER position as required to achieve Green band value on XI-00036.
Places DG A Speed Governor HS-00054A switch to the RAISE or LOWER position to cause the Synchroscope XI-00037 pointer to rotate slowly (approximately 1 rpm) in the FAST (clockwise) direction.
Eva1 Comments STCP-QA-1258 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 6 of 1 I
(:
Appl. To/JPM No.: 24.0P.006.102 Step
- 8
- 9 Action EVALUATOR NOTE:
When DG A to Bus 1A Bkr 1A20104 breaker is closed in the next step, the following should occur:
Both white lights will remain extinguished and the synchroscope pointer will stop at the 12 o'clock position.
The Running Idle light will extinguish and the Running Loaded light illuminates on the Local Panel (OC521A).
Close DG A to Bus 1A Bkr lA20104 when synchroscope at or slightly before "12 o'clock" position.
Promptly go to RAISE and Slowly increase load to 1000 KW over a 30-45 second period using DG A Speed Governor HS-00054A switch.
- Critical Step
- Critical Sequence Student Name:
Standard When the Synchroscope XI-00037 pointer is at or slightly before the 12 o'clock position:
Places DG A to Bus 1A Bkr 1A20104 to the closed position Verifies:
Red light LIT and Amber light NOT LIT Places DG A Speed Governor HS-00054A switch to RAISE over a period of 30-45 seconds until DG A Watts XI-00032A meter indicates 1,000 KW.
Eva1 Comments STCP-QA-1258 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
PERFORMANCt CHECKLIST Appl. To/JPM No.: 24.0P.006.102 Step
+ I O I 1 12 Action Promptly Position DG A Voltage Adjust HS-00053A to maintain 0 to 900 KVARs but as close to 0 on positive side as possible on DG A KVARs GVARM on Panel OC519A and/or PlCSY Format Diesel Generator A.
Place DG A to Bus 1A Sync Sel HS-00039A switch to OFF.
AT Diesel Engine Control Panel OC521A, Observe Running Loaded light ILLUMINATED Ensure intake air manifold temperatures maintained in accordance with section 2.15 of this procedure at all times diesel generator operating.
+Critical Step
- Critical Sequence Student Name:
(
Page 7 of 11 Standard Places DG A Voltage Adjust HS-00053A switch to LOWER/RAISE in order to maintain 0 to 900 WARS but as close to 0 on positive side as possible on PlCSY Format Diesel Generator A Places DG A to Bus 1A Sync Sei HS-00039A switch to OFF.
Contacts NPO at the Diesel and requests the status of the Running Loaded light Instructs NPO to ensure intake air manifold temperatures maintained in accordance with section 2.15 of this procedure at all times while diesel generator is operating.
AND Eva1 Comments STCP-QA-1258 Rev. 2 (9193)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.: 24.0P.006.102
{
PERFORMANCt CHECKLIST i
Page 8 of 11 Action EVALUATOR NOTE:
Role-play the diesel NPO and inform the control room that the Running Loaded light is LIT AND intake air manifold temperatures are being maintained in accordance with section 2.15 of this procedure.
IF diesel generator started due to emergency:
Load as required to support plant conditions.
CAUTIO N During each increase, anticipated DG output must not exceed present T-IO (T-20) bus load CAUTION If T-IO (T-20) Tap Changer Setpoint of Positive (Out) or Negative (In) I000 WARS is reached for 2 20 seconds, Tap Changer will automatically change tap EVALUATOR CUE:
Inform the candidate that 5 minutes has elapsed.
- Critical Step
- Critical Sequence Student Name:
Standard Determines Diesel generator was not started due to an emergency based on initial conditions.
Eva1 Comments STCP-QA-1258 Rev. 2 (9193)
Page 1 of 1 2004 NRC Exam Rev. 1
(
PERFORMAN& CHECKLIST Eva1 Appl. To/JPM No.: 24.0P.006.102 Comments Step 514 Action IF diesel generator started for test or other than emergency condition:
AFTER 5 minutes operation, Slowly increase load to 2000 KW using DG A Speed Governor HS-00054A switch.
AND Promptly Adjust WARS to maintain 0 to 900 WARS but as close to 0 on positive side as possible using HS-00053A.
EVALUATOR CUE:
Inform the candidate that 10 minutes has elapsed.
- Critical Step
- C ri t ica I Seq uence Student Name:
(:'
Page 9 of 11 Standard Places DG A Speed Governor HS-00054A switch to RAISE until DG A Watts XI-00032A meter indicates 2,000 KW.
AND Places DG A Voltage Adjust HS-00053A switch to LOWEWRAISE in order to maintain 0 to 900 WARS but as close to 0 on positive side as possible on PlCSY Format Diesel Generator A I
STCP-QA-1256 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.: 24.0P.006.102 Eva1 Step Comments PERFORMANCE CHECKLIST Page 10 of 11 Action AFTER 10 minutes operation at 2000 KW, Slowly increase load to 3000 KW over a 30-45 second period using DG A HS-00054A.
AND Promptly Adjust WARS to maintain 0 to 900 KVAR but as close to 0 on positive side as possible using HS-00053A EVALUATOR CUE:
Inform the candidate that 10 minutes has elapsed.
%Critical Step
- Critical Sequence Student Name:
Standard Places DG A Speed Governor HS-00054A switch to RAISE over a period of 30-45 seconds until DG A Watts XI-00032A meter indicates 3,000 KW.
AND Places DG A Voltage Adjust HS-00053A switch to LOWEWRAISE in order to maintain 0 to 900 WARS but as close to 0 on positive side as possible on PlCSY Format Diesel Generator A STCP-QA-1256 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.: 24.0P.006.102 Step
+I6 17 PERFORMANCt CHECKLIST Page 11 of 11 Action AFTER 10 minutes operation at 3000 KW, (A-D DG only) Slowly increase load to 3600 to 4000 KW over a 30-45 second period using DG A Speed Governor HS-00054A switch.
AND Promptly Adjust KVARs to maintain 0 to 900 KVARs but as close to 0 on positive side as possible using HS-00053A IF diesel generator operated at 2000 KW, Perform following for 15 minutes for every hour 2000 KW and immediately before shutdown:
Raise load to 3600 to 4000 KW using HS-O0054A, Promptly Adjust KVARs to maintain 0 to 900 KVARs but as close to 0 on positive side as possible using AND HS-00053A.
EVALUATOR CUE:
This completes the JPM
+Critical Step
- Critical Sequence Student Name:
Standard Places DG A Speed Governor HS-00054A switch to RAISE over a period of 30-45 seconds until DG A Watts XI-00032A meter indicates 3600 to 4000 KW.
AND Places DG A Voltage Adjust HS-00053A switch to LOWEWRAISE in order to maintain 0 to 900 KVARs but as close to 0 on positive side as possible on PlCSY Format Diesel Generator A Determines that this step is not applicable since the diesel was just started.
Eva1 Comments STCPQA-1256 Rev. 2 (9193)
Page 1 of 1 2004 NRC Exam Rev. 1
TASK CONDITIONS A.
B.
C.
D.
Diesel Generator A was started manually from OC653 in accordance with OP-024-001, Diesel Generator and has been running unloaded for 15 minutes.
No other diesel generator is operating synchronized to the grid.
A NPO is stationed at the diesel.
Air intake manifold temperatures are being controlled in AUTOMATIC.
-v-INITIATING CUE Manually synchronize Diesel Generator A with 4.16 W Bus 1A and pick up 3600 to 4000 KW of load IAW OP-024-001, Diesel Generator section 2.3.
2004 NRC Exam Rev. 1 1 of2
TASK CONDITIONS A.
B.
C.
D.
Diesel Generator A was started manually from OC653 in accordance with OP-024-001, Diesel Generator and has been running unloaded for 15 minutes.
No other diesel generator is operating synchronized to the grid.
A NPO is stationed at the diesel.
Air intake manifold temperatures are being controlled in AUTOMATIC.
L-INITIATING CUE Manually synchronize Diesel Generator A with 4.16 W Bus 1A and pick up 3600 to 4000 KVV of load IAW OP-024-001, Diesel Generator section 2.3.
2004 NRC Exam Rev. 1 2 o f 2
PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET L'
S/RO 34.E0.005.101 2
01/14/04 295028 EA1.03 3.9/3.9 Appl. To JPM Number Rev. No.
Date NUREG 1123 Sys. No.
WA Task
Title:
Reset Drywell Cooling Isolation and Restore Drywell Cooling IAW ES-134-001 (Control Room Actions)
Completed By:
Reviews:
Russ Halm Writer Date InstructorNVriter Date Ap prova I :
Requesting Supv./C.A.
Date Nuclear Trng. Supv.
Date Head Date of Performance:
v 10 Allowed Time (Min.)
Time Taken (Min.)
JPM Performed By:
Student Name:
Last First M.I.
Employee #/S.S. #
Performance
(
)
Satisfactory
(
)
Unsatisfactory Evaluation:
Evaluator Name:
Signature Typed or Printed Comments:
c STCP-QA-1Z5A Rev. 2, (9193)
Page 1 of 1 2004 NRC Exam Rev. 1 File No. A14SB
'._/
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 34.E0.005.101
- 1.
SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
- 1. Whenever any electrical panel is opened for inspection during JPM performance.
- 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
II. REFERENCES ES-134-001, Restoring Drywell Cooling With A LOCA Signal Present Revision 12 I I I. REACTIVITY MAN I PULATIONS This JPM satisfies the requirements of Operational Activity(s):
NONE IV. TASK CONDITIONS
.w A. An ATWS has occurred coincident with a loss of drywell cooling.
B.
EO-1 00-1 13 is being implemented for IeveVpower control.
C. EO-100-103 is being executed for primary containment control.
D. All containment isolations and ECCS actions have properly occurred.
E. ES-134-001 is being implemented and is complete through Step 4.2.
F. CIG 90 # header has been restored.
V. INITIATING CUE Your supervisor directs you to Reset Drywell Cooling Logic isolations and restore Drywell Cooling in accordance with ES-134-001, section 4.3.
VI. TASK STANDARD Drywell Cooling Logic isolations reset and Drywell cooling restored.
VII. TASK SAFETY SIGNIFICANCE Re-establish containment cooling.
2004 NRC Exam Rev. 1
Appl. To/JPM No.: 34.E0.005.101 Step r
PERFORMANCt CHECKLIST Action EVALUATOR NOTE:
0 This JPM is to run AFTER JPM 84.0P.001.I 51 has been completed. This will allow for CIG 90#
header to be restored.
This JPM must be performed on the simulator.
Set up the simulator IAW the attached setup instructions.
Place the simulator in Freeze.
Fill out and approve for use a blank copy of ES-134-001 up to step 4.3; mark steps 4.3.2 and 4.3.4 as N/A. Provide this to the candidate for use in completing the task.
0 When student is ready to begin JPM, place the simulator in RUN.
Obtain a controlled copy of ES-I 34-001, RESTORING DRYWELL COOLING WITH A LOCA SIGNAL PRESENT 0
0 0
Review Sections 1.O through 3.0.
Check for approval in Section 4.1.
%Critical Step
- Critical Sequence Student Name:
Standard Controlled copy obtained.
Review Sections 1.O through 3.0.
Verifies:
Shift Manager approval at step 4.1 Eva1
(
Page 3 of 7 Comments STCP-PA-125B Rev. '2 (9193)
Page 1 of 1 2004 NRC Exam Rev. 1
i PERFORMANC t CHECKLIST Appl. To/JPM No.: 34.E0.005.101 Step Action Verify step 4.2 is marked as complete Selects the correct section to perform.
Ensure the following valves are closed prior to resetting isolation logic:
A CLRS CLG WTR OB IS0 VLVS HV-18781A1 and A CLRS CLG WTR IB IS0 VLVS HV-18782B1 and B CLRS CLG WTR OB IS0 VLVS HV-I8781B1 and B CLRS CLG WTR IB IS0 VLVS HV-18782Al and HV-I 8781A2.
HV-18782B2.
HV-1878182.
HV-18782A2.
- Critical Step
- Critical Sequence Student Name:
Standard Verifies:
step 4.2 is marked as complete Selects section 4.3 Verifies:
Amber light -LIT and red light NOT LIT for the following valves:
A CLRS CLG WTR OB IS0 VLVS HV-18781Al and HV-18781A2.
A CLRS CLG WTR IB IS0 VLVS HV-18782B1 and HV-I 8782B2.
B CLRS CLG WTR OB IS0 VLVS HV-18781 B1 and HV-1878182.
B CLRS CLG WTR IB IS0 VLVS HV-18782A1 and HV-18782A2.
Eva1 Page 4 of 7
~~~
Comments STCP-QA-1258 Rev. 2 (9193)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.: 34.E0.005.101 Step 7
- 8 9
- I O 11 PERFORMAN& CHECKLIST Action
~
~
If Containment Instrument Gas has not been restored by ES-184-002, Ensure the following are closed at Panel 1 C601 prior to resetting isolation logic:
INSTR GAS TO CONTN IS0 SV-12651.
INSTR GAS CMP IB SUCT IS0 HV-12603.
INSTR GAS CMP OB SUCT IS0 SV-12605.
Reset Drywell Cooling (HVAC LOCA Trip 1A and IB)
Logic:
On IC601 momentarily Depress CHAN A DRWL CLG HS-14141A RESET push button.
Observe CHAN A DRWL CLG RESET green IS0 light extinguishes.
On IC601 momentarily Depress CHAN B DRWL CLG HS-14141 B RESET push button.
Observe CHAN B DRWL CLG RESET green IS0 light extinguishes,
- Critical Step
- Critical Sequence Student Name:
Standard
~ _ _ _ _
Based on initial conditions:
Determines that CIG 90# header has been restored.
Depresses CHAN A DRWL CLG HS-14141A RESET pushbutton.
Verifies:
Green light above the pushbutton NOT LIT.
Depresses CHAN B DRWL CLG HS-14141 B RESET pushbutton.
Verifies:
Green light above the pushbutton NOT LIT.
Eva1
(
Page 5 of 7 Comments STCP-QA-1258 Rev. 2 (9193)
Page 1 of 1 2004 NRC Exam Rev. 1
i, Appl. To/JPM No.: 34.E0.005.101 Step
- I2 13
- I4 15 16 PERFORMANCE CHECKLIST i
Page 6 of 7 Action On 1 C681 Heat and Ventilation Control Panel momentarily Depress Chan A RBCW IS0 VALVE POS RESET HS-14140A push button.
Observe Chan A RBCW IS0 VALVE POS RESET white Is0 light extinguishes.
On 1 C681 Heat and Ventilation Control Panel momentarily Depress Chan B RBCW IS0 VALVE POS RESET HS-14140B push button.
Observe Chan B RBCW IS0 VALVE POS RESET white Is0 light extinguishes.
If Containment Instrument Gas has not been restored by ES-184-002, Restore CIG in accordance with section 4.4 of this procedure.
EVALUATOR NOTE:
Following valves may not open if CIG header pressure is low.
Drywell cooling will occur after the following steps if RBCCW is in service and the drywell cooling swap valves have re-aligned.
- Critical Step
- Critical Sequence STCP-QA-1258 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1 Student Name:
Standard Depresses CHAN A RBCW IS0 VALVE POS RESET HS-14140A.
Verifies:
White light above the pushbutton NOT LIT.
Depresses CHAN B RBCW IS0 VALVE POS RESET HS-14140B.
Verifies:
White light above the pushbutton NOT LIT.
Based on initial conditions:
Determines that CIG 90# header has been restored.
Eva1 Comments
Appl. To/JPM No.: 34.E0.005.101 Step 17
('
PERFORMAN& P HECK LIST Action On 1 C681 Heat and Ventilation Control Panel, Ensure following valves open:
A CLRS CLG WTR OB IS0 VLVS HV-18781Al and A CLRS CLG WTR IB IS0 VLVS HV-18782B1 and B CLRS CLG WTR OB IS0 VLVS HV-18781 B1 and B CLRS CLG WTR IB IS0 VLVS HV-18782A1 and HV-18781A2.
HV-I 8782B2.
HV-I 8781 B2.
HV-18782A2.
EVALUATOR NOTE:
That completes this JPM
%Critical Step
- Critical Sequence Student Name:
Standard Verifies:
Amber light - NOT LIT and red light LIT for the following valves:
A CLRS CLG WTR OB IS0 VLVS HV-18781Al and HV-18781A2.
A CLRS CLG WTR IB IS0 VLVS HV-18782B1 and HV-18782B2.
B CLRS CLG WTR OB IS0 VLVS HV-18781 B1 and HV-18781 B2.
B CLRS CLG WTR IB IS0 VLVS HV-18782A1 and HV-18782A2.
Eva1 Comments STCP-QA-1258 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
TASK CONDITIONS A.
An ATWS has occurred coincident with a loss of drywell cooling.
B.
EO-100-113 is being implemented for IeveVpower control.
C. EO-100-103 is being executed for primary containment control.
D. All containment isolations and ECCS actions have properly occurred.
E. ES-134-001 is being implemented and is complete through Step 4.2.
F. CIG 90 # header has been restored.
V. INITIATING CUE Your supervisor directs you to Reset Drywell Cooling Logic isolations and restore Drywell Cooling in accordance with ES-134-001, section 4.3.
-e-2004 NRC Exam Rev. I 1 of2
TASK CONDITIONS A.
An ATWS has occurred coincident with a loss of drywell cooling.
B. EO-100-1 13 is being implemented for level/power control.
C. EO-I 00-1 03 is being executed for primary containment control.
D. All containment isolations and ECCS actions have properly occurred.
E. ES-134-001 is being implemented and is complete through Step 4.2.
F.
CIG 90 # header has been restored.
V. INITIATING CUE Your supervisor directs you to Reset Drywell Cooling Logic isolations and restore Drywell Cooling in accordance with ES-134-001, section 4.3.
2004 NRC Exam Rev. 1 2 o f 2
PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET StRO 84.0P.OO1.I 51 I
01 /I 5/04 295037 EA1.I 1
3.U3.6 Appl. To JPM Number Rev. No.
Date NUREG 1123 Sys. No.
WA Task
Title:
Bypass MSlV and CIG Interlocks During An ATWS And Restore CIG IAW OP-I 84-001 Completed By:
Reviews:
Russ Halm Writer Date InstructorNVriter Date Ap prova I :
Requesting Supv./C.A.
Date Nuclear Trng. Supv.
Date Head 10 Date of Performance:
Allowed Time (Min.)
Time Taken (Min.)
JPM Performed By:
Student Name:
Last First M.I.
Employee #/S.S. #
Performance
(
)
Satisfactory
(
)
Unsatisfactory Evaluation:
Evaluator Name:
Signature Typed or Printed Comments:
STCP-QA-125A Rev. 2, (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1 File No. A14-56
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SlRO 84.0P.001.I 51
- 1.
SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
- 1. Whenever any electrical panel is opened for inspection during JPM performance.
- 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
II. REFERENCES OP-184-001, Main Steam System (Revision 19) 5 Keys for the bypass switches 111. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):
NONE IV. TASK CONDITIONS A. An ATWS has occurred coincident with a loss of drywell cooling.
B. MSIVs and steam line drains are open.
C. The main condenser is available.
D. RPS power is available.
E. CIG System has isolated due to high drywell pressure; both compressors have tripped.
V. INITIATING CUE Your Supervisor directs you to Bypass MSlV and CIG interlocks and restore CIG System pressure IAW appropriate Hard card.
VI. TASK STANDARD MSlV and CIG interlocks Bypassed and CIG System 90# header pressurized.
VII. TASK SAFETY SIGNIFICANCE Protect the containment by providing Normal heat sink capability.
2004 NRC Exam Rev. 1
Appl. To/JPM No.:84.OP.001.I51 Step PERFORMANCE CHECKLIST Action EVALUATOR NOTE:
0 This JPM must be performed in the simulator.
The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS.
Set up the simulator IAW attached setup instructions.
Place the simulator in Freeze.
When student is ready to begin JPM, place the simulator in RUN.
Obtain a controlled copy of OP-184-001.
Selects the correct section to perform.
EVALUATOR NOTE:
When first switch on IC645 is placed in BYPASS, Annunciator AR-147-D1 will alarm.
Bypass MSlV Low Water Level 1 Isolation at IC645 by Placing the following to BYPASS:
- Critical Step
- Critical Sequence Student Name:
Standard Controlled copy obtained.
Selects Attachment A of OP-I 84-001 (Hard Card)
Eva1 Page 3 of 8 Comments STCP-QA-1258 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
r; Page 4 of 8 Appl. To/JPM No.:84.OP.001.I51 Step
- 4
- 5 6
PERFORMANCt CHECKLIST Action HS-B21-S38A Rx Wtr Lvl I MSlV Bypass Logic A.
HS-B21-S38C Rx Wtr Lvl 1 MSlV Bypass Logic C.
EVALUATOR NOTE:
When first switch on IC644 is placed in BYPASS, Annunciator AR-148-D1 will alarm.
Bypass CIG Low Water Level 1 and High Drywell Pressure Isolation by Placing the following to BYPASS:
- Critical Step
- Critical Sequence Student Name:
Standard
~~
Inserts key into Bypass switch HS-B21-S38A Rx Wtr Lvl 1 MSlV Bypass Logic A and Places to BYPASS position.
Verifies:
Green light LIT White light NOT LIT Inserts key into Bypass switch HS-B21-S38C Rx Wtr Lvl 1 MSlV Bypass Logic C and Places to BYPASS position.
Verifies:
Green light LIT White light NOT LIT Eva1
-~
~~
Comments STCP-QA-1258 Rev. 2 (9193)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.:84.OP.001. I 51 Step
- 7
+8
- 9 i'
PERFORMANCt CHECKLIST Action At 1C645, HS-12694 Low Lvl 1/Hi Drywell Press CIG Bypass (HV-I 2603)
At 1 C645, HS-I 2695 Low Lvl l/Hi Drywell Press CIG Bypass (SV-12651)
At 1 C644, HS-12696 Low Lvl 1/Hi Drywell Press CIG Bypass (SV-12605)
- Critical Step
- Critical Sequence Student Name:
Standard Inserts key into Bypass switch HS-12694 Low Lvl 1/Hi Drywell Press CIG Bypass and Places to BYPASS position.
Verifies:
Green light LIT White light NOT LIT Inserts key into Bypass switch HS-12695 Low Lvl l/Hi Drywell Press CIG Bypass and Places to BYPASS posit ion.
Verifies:
Green light LIT White light NOT LIT Inserts key into Bypass switch HS-12696 Low Lvl 1/Hi Drywell Press CIG Bypass and Places to BYPASS posit ion.
Verifies:
Green light LIT White light NOT LIT Eva1
('
Page 5 of 8 Comments STCP-PA-1258 Rev. 2 (9193)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.:84.OP.001.I51 Step 10 tl 1 t 1 2 t 1 3 i
PERFORMANCE CHECKLIST Action IF 1.72# High Drywell Pressure isolation has occurred, Restore CIG as follows:
Open lnstr Gas Cmp Suct Is0 HV-12603.
Open lnstr Gas To Contn Is0 SV-1265 Open lnstr Gas Cmp OB Suct IS0 SV-12605.
- Critical Step
- Critical Sequence Student Name:
Standard Determines that high drywell pressure does exist either from the initiating cue OR control room indications.
Depresses OPEN pushbutton for lnstr Gas Cmp Suct Is0 HV-I2603 and verifies:
Red light LIT Amber light NOT LIT Depresses OPEN pushbutton for lnstr Gas To Contn Is0 SV-12651 and verifies:
Red light LIT Amber light NOT LIT Depresses OPEN pushbutton for lnstr Gas Cmp OB Suct IS0 SV-12605 and verifies:
Red light LIT Amber light NOT LIT Eva1 Page 6 of 8 Comments STCP-QA-1256 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.:84.OP.001.I51 Step 14
- I 5 PERFORMAN& CHECKLIST Action Reset Instrument Gas Compressor 1 K205A and 1 K205B at Containment Instrument Gas Control Panel 1 C239 EVALUATOR CUE:
Role-play the NPO and acknowledge the request.
FAULT STATEMENT:
As NPO, REPORT THE CIG COMPRESSORS WILL NOT RESET.
IF Instrument Air available, Cross-Tie Instrument Air to CIG 90# Header as follows.
Slowly Open I-A to CIG Cross-Tie 1261 72 And 126167
- Critical Step
- Critical Sequence Student Name:
Standard Contacts NPO and directs CIG compressors be placed into service IAW OP-184-001 attachment A step 4.a through 4.f Verifies:
IA I K107A and IA I K107B White lights LIT and Amber lights NOT LIT IA Pressure PI-I251 1A - I00 psig Contacts NPO and requests:
Slowly Open I-A to CIG Cross-Tie 1261 72 And 1261 67 Eva1
(
Page 7 of 8 Comments STCP-QA-125B Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.:84.OP.001.I51 Step 16 PERFORMANCt CHECKLIST Action EVALUATOR CUE:
Role-play the NPO and acknowledge the request.
BOOTH CUE Insert pfs 2 MRF PC125001 OPEN (opens IA 1261 67/126172)
EVALUATOR CUE:
Role-play NPO and contact PCO to inform Cross-Tie 126172 And 126167 are OPEN Verifies 90# CIG header is being pressurized EVALUATOR CUE:
That completes this JPM
-A to CIG
- Critical Step
- Critical Sequence Student Name:
(1 Page 8 of 8 Standard Acknowledges the report Verifies:
INSTR GAS HDR PRESS PI-I2612 AND INSTR GAS SUPP PRESS PI-I2642 Slowly rising Eva1 Comments STCP-QA-1258 Rev. 2 (9193)
Page 1 of 1 2004 NRC Exam Rev. 1
TASK CONDITIONS A.
An ATWS has occurred coincident with a loss of drywell cooling.
B.
MSlVs and steam line drains are open.
C. The main condenser is available.
D. RPS power is available.
E. CIG System has isolated due to high drywell pressure; both compressors have tripped.
INITIATING CUE Your Supervisor directs you to Bypass MSlV and CIG interlocks and restore CIG System pressure IAW appropriate Hard card.
2004 NRC Exam Rev. I 1 of2
TASK CONDITIONS A.
An ATWS has occurred coincident with a loss of drywell cooling.
B.
MSlVs and steam line drains are open.
C. The main condenser is available.
D. RPS power is available.
E.
CIG System has isolated due to high drywell pressure; both compressors have tripped.
INITIATING CUE Your Supervisor directs you to Bypass MSlV and CIG interlocks and restore CIG System pressure IAW appropriate Hard card.
2004 NRC Exam Rev. 1 2 of 2
For Information O n l y Attachment A BYPASSING MSIV AND CIG lNTERLOCKS OP-184-001 (Ref. Section 2.4)
Revision 19 Page 17 of f7
- 5 Keys Required*"
I7 1.
Bypass MSlV Low Water Level 1 Isolation at lC645 by Placing the following to BYPASS:
- a.
0
- b.
Bypass CIG Low Water Level 1 and High Drywell Pressure Isolation by Placing the following to BYPASS
- a.
At 1C645, HS-12694 Low Lvl 1Mi Drywell Press CIG Bypass (HV-12603)
- b.
At 1C645, HS-12695 Low Lvl 1/Hi Drywell Press CIG Bypass (SV-12651) 0
- c.
At 1C644, HS-12696 Low LvIl/Hi Drywell Press CIG Bypass (SV-12605)
E 1.72# High Drywell Pressure isolation has occurred, Restore CIG as follows:
- a.
- b.
0
- c.
Reset Instrument Gas Compressor 1 K205A and 1 K205B at Containment Instrument Gas Control Panel 1 C239 as follows:
HS-BZl-S38A Rx Wtr Lvl 1 MSlV Bypass Logic A.
HS-B21-S38C Rx Wtr Lvl 1 MSlV Bypass Logic C.
a 2.
17 3.
Open lnstr Gas Crnp Suct Is0 HV-12603.
Open lnstr Gas To Contn Is0 SV-12651.
Open lnstr Gas Cmp OB Suct IS0 SV-12605.
- 4.
- a.
0
- b.
0
- c.
[3 d.
Depress Cmp N B Logic Reset Pushbutton on 1C239 to restart both GIG compressors. Ecompressors did not start Continue:
Place Instrument Gas Compressor 1 K205A Mode Selector Switch to OFFmESET.
Place Instrument Gas Compressor 1 K205B Mode Selector Switch to OFFRESET.
Place Instrument Gas Compressor 1 K205A Mode Selector Switch to AUTO.
0
- e.
Place Instrument Gas Compressor 1K205B Mode Selector Switch to AUTO.
D f.
Check White AC Power On Light for both compressors ILLUMINATED.
OR 0 5. -
IF instrument Air available, Cross-Tie Instrument Air to CIG 90# Header as follows.
0
- a.
Slowly Open I-A to CIG Cross-Tie 126172.
I
-.e
- b.
Slowly Open I-A to CIG Cross-Tie 126167.
FORM OP-184-001-1, Rev. 1, Page I of 1
PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET S/RO 45.0P.013.151 4
01/11/04 259001 A2.07 3.7/3.8 Appl. To JPM Number Rev. No.
Date NUREG 1123 Sys. No.
KIA Task
Title:
Perform Switching Feedwater Level Control Completed By:
Reviews:
Russ Halm Writer Date InstructorNVriter Date Approval:
Requesting Supv./C.A.
Date Nuclear Trng. Supv.
Date Head Date of Performance:
10 Allowed Time (Min.)
Time Taken (Min.)
JPM Performed By:
Student Name:
Last First M.I.
Employee #/S.S.
Performance
(
)
Satisfactory Evaluation:
(
)
Unsatisfactory Evaluator Name:
Signature Typed or Printed Comments:
STCP-QA-125B Rev. 2, (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1 File No. A14-5B
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 45.0P.013.151 I. SAFETY CONSIDERATIONS 1-A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
- 1. Whenever any electrical panel is opened for inspection during JPM performance.
- 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
- 11.
REFERENCES A. OP-145-001, RFP and RFP Lube Oil System (Rev. 35)
I I I. REACTIVITY MAN I PU LATIONS This JPM satisfies the requirements of Operational Activity(s):
None b-IV. TASK CONDITIONS A. Unit 1 is in Mode 1 100% power.
B. Feedwater Level Control is in Automatic, Three-Element Control with the level input in SELECT on Narrow Range LEVEL A.
C. I&C has requested Operations select the LEVEL B input for Feedwater Control to perform testing.
V. INITIATING CUE Transfer Automatic Feedwater Level Control Input to Level B.
VI. TASK STANDARD FW LEVEL Control returned to A channel with NO limiter 1 runback on low RX water level (+I3 inches) and NO turbine trip on high RX water level (+54 inches) occurs.
VII. TASK SAFETY SIGNIFICANCE Incorrect performance of the task could result in excessive moisture to the main turbine due to carryover, or loss of available NPSH to the recirculation pumps due to carryunder.
STCP-QA-1256 Rev. 2. (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
PERFORMANCt CHECKLIST Appl. To/JPM No.: S/RO 45.0P.013.151 Step Action EVALUATOR NOTE:
This JPM must be performed in the simulator.
Select a 100% IC Place feedwater level control in SELECT Narrow range Level A Insert BAT FWB.FWLC-BFL The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS.
When candidate is ready to begin JPM, place the simulator in RUN.
Candidate locates procedure and refers to appropriate section.
Reviews prerequisites and precautions.
- Critical Step
- Critical Sequence Student Name:
Page 3 of 7 Standard Obtains procedure OP-145-001, RFP and RFP Lube Oil System section 2. I O.
Reviews prerequisites and precautions and Checks:
Rx water level A & B within 2 inches of each other on LI-C32-1 R606A & B.
Eva1 Comments STCP-QA-1258 Rev. 2, (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. TolJPM No.: S/RO 45.0P.013.151 Step 3
\\
PERFORMANCt CHECKLIST
- Critical Step Action Verify feed flow/steam flow delta Stable.
EVALUATOR NOTE:
Steam flow/feed flow delta and/or RPV water level may change during the next step, requiring adjustments to FW level controller.
- Critical Sequence Student Name:
Standard Observe feed flow/steam flow delta.
Checks XR-I 0602:
CH 5 Rx NR level on OR PICSY AND Determines the delta to be stable Eva1
(
Page 4 of 7 Comments STCP-QA-1258 Rev. 2. (9193)
Page 1 of 1 2004 NRC Exam Rev. 1
i, Appl. ToIJPM No.: S/RO 45.0P.013.151 Step 4
5
- 6 i
1, PERFORMAN& CHECKLIST Action
+Critical Step FAULT STATEMENT REACTOR WATER LEVEL INDICATION WILL DECREASE AT A RATE OF =3 to 5/MIN AFTER THE STUDENT SELECTS THE B FEEDWATER LEVEL.
Transfer feedwater level control from A to B level input as follows with the Averaged or Selected HS14268 in SEL Observe feed flow/steam flow delta EVALUATOR NOTE:
Candidate should recognize Reactor Water Level is decreasing at a fast rate.
Depress B push button for SELECT LVL A OR B HS-C32-1S01
- Critical Sequence Student Name:
Standard Check for deviation indication at FW LEVEL controller.
CTL/DEMAND SIGNAL LIC-C32-1 R600 Depress B pushbutton for SELECT LVL A OR B HS-C32-1 Sol.
Eva1
(
Page 5 of 7 Comments STCP-QA-1258 Rev. 2. (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
I Appl. To/JPM No.: S/RO 45.0P.013.151 Step 7
%8 9
10 11 PERFORMANCt CHECKLIST
('
Page 6 of 7 Action Null FW LEVEL CTL/DEMAND SIGNAL LIC-C32-1 R600 controller by adjusting tape setpoint.
IF deviation cannot be nulled, Transfer back to A level input as follows:
Depress A push button for SELECT LVL A OR B HS-C32-1 Sol.
Null FW LEVEL CTL/DEMAND SIGNAL LIC-C32-1 R600 controller by adjusting tape setpoint.
IF necessary, Slowly Return FW LEVEL tapeset to 34" CTLIDEMAND SIGNAL LIC-C32-1 R600 Informs supervisor of situation
+Critical Step
- Critical Sequence Student Name:
Standard Attempts to NULL the deviation by adjusting the tape setpoint on FW LEVEL CTL/DEMAND SIGNAL LIC-C32-1 R600 controller.
AND Determines FW LEVEL CTL/DEMAND SIGNAL LIC-C32-1 R600 controller cannot be NULLED.
Depress 'A pushbutton for SELECT LVL A OR B HS-C32-1 Sol.
Null the FW LEVEL CTL/DEMAND SIGNAL LIC-C32-1 R600 by adjusting the tape setpoint.
If necessary slowly return FW LEVEL tapeset to 34".
CTL/DEMAND SIGNAL LIC-C32-1 R600 Notifies supervisor that B channel was failing low.
Eva1 Comments STCP-QA-I 25B Rev. 2. (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
i i
Action f
Standard Eva1 Comments Page 7 of 7 i
PERFORMANCE CHECKLIST Student Name:
Appl. To/JPM No.: S/RO 45.0P.013.151 Step
- Critical Step EVALUATOR CUE:
Role play the Unit Supervisor and acknowledge the notification.
EVALUATOR CUE:
This completes the JPM.
I I
- Critical Sequence STCP-QA-1258 Rev. 2. (9193)
Page 1 01 1 2004 NRC Exam Rev. 1
TASK CONDITIONS A.
Unit 1 is in Mode 1 100% power.
- 6.
C.
Feedwater Level Control is in Automatic, Three-Element Control with the level input in SELECT on Narrow Range LEVEL A.
I&C has requested Operations select the LEVEL B input for Feedwater Control to perform testing.
INITIATING CUE Transfer Automatic Feedwater Level Control Input to Level 6.
STCP-QA-1255 Rev. 2, (9193)
Page 1 of 1 2004 NRC Exam Rev. 1 Page 1 of 2
TASK CONDITIONS A.
B.
C.
~.
L-Unit 1 is in Mode 1 100% power.
Feedwater Level Control is in Automatic, Three-Element Control with the level input in SELECT on Narrow Range LEVEL A.
1&C has requested Operations select the LEVEL B input for Feedwater Control to perform testing.
INITIATING CUE Transfer Automatic Feedwater Level Control Input to Level B Page 2 of 2 STCP-QA-1256 Rev. 2, (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
PENNSYLVANhPOWER & LIGHT COMPANY JOB PERFORMANCE MEASURE L
APPROVAL AND ADMINISTRATIVE DATA SHEET S/RO 14.ON.003.151 0
0 I
/20/04 29501 8 AA1.03 3.3/3.4 Appl. To JPM Number Rev. No.
Date NUREG 1123 Sys. No.
WA Task
Title:
Completed By:
Reviews :
Respond to RBCCW system leak IAW ON-I 14-001 Russ Halm Writer Date InstructorNVriter Date Approval:
Requesting Supv./C.A.
Date Nuclear Trng. Supv.
Date Head Date of Performance:
JPM Performed By:
15 Allowed Time (Min.)
Time Taken (Min.)
Student Name:
Last First M.I.
Employee #/S.S. #
Performance Evaluation:
)
Satisfactory
(
)
Unsatisfactory Evaluator Name:
Signature Typed or Printed Comments:
STCP-QA-125A Rev. 2, (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1 File No. A14-58
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 14.0N.003.151
- 1.
SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
- 1. Whenever any electrical panel is opened for inspection during JPM performance.
- 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
II. REFERENCES ON-I 14-001 Loss of RBCCW (Revision 16)
OP-I 14-001 Reactor Building Closed Cooling Water System (RBCCW) (Revision 16)
AR-106-001 (E15) Reactor Bldg. Sample Station 1 C210 System Trouble (Revision 28)
AR-123-001 (E06) RBCCW Head Tank HI-LO Level (Revision 16)
LA-1294-001 Reactor Building Sampling Alarm Reflash Panel 1 C294 (Revision 3) 111. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):
45 Loss of RBCCW IV. TASK CONDITIONS A.
Both Units are in Mode 1 @ 100% power.
V. INITIATING CUE Your are the PCOM, Respond to any alarms that are received and take the appropriate procedural actions.
VI. TASK STANDARD RBCCW head tank level is stable the leak has been identified and isolated.
VII. TASK SAFETY SIGNIFICANCE Failure to complete the task may result in serious permanent damage to components served by the RBCCW system.
2004 NRC Exam Rev. l
Appl. To/JPM No.: 14.0N.003.151 Step 1
PERFORMANC t CHECKLIST Page 3 of 11 Action EVALUATOR NOTE:
0 0
0 0
Freeze simulator 0
This JPM must be performed in the simulator.
Select any Mode 1 IC Insert IMF RW11401 1.0 to reduce RBCCW head tank level to 18.5 inches. Monitor on RWI screen.
Reduce size of the leak by inserting MMF RW11401 to 0.005 Assign pfs I DMF RW11401 0
Assign pfs 2 IOR AN:AR106E15 CRYWOLF The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS.
When student is ready to begin JPM, place the simulator in RUN.
0 EVALUATOR NOTE:
The RBCCW leak should cause the following alarm to be received in the control room:
AR-123 -E06 RBCCW Head Tank HI-LO Level Acknowledge the alarm and refer to appropriate AR procedure
%Critical Step
- Critical Sequence Student Name:
Standard Refers to AR-123-EO6 RBCCW HEAD TANK HI-LO LEVEL Eva1 Comments STCP-QA-1258 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. TolJPM No.: 14.0N.003.151 Step 2
3 4
5
- 6 PERFORMANCE CHECKLIST Page 4 of 11 Action
~
~
~~
~~~
DISPATCH Operator to RBCCW head tank to determine if level high or low.
EVALUATOR CUE:
Role-play the NPO and acknowledge the request.
Report back to control room that RBCCW head tank level is low at - I 8 inches.
If low level:
MAKEUP to head tank in accordance with OP-I 14-001.
Obtain a controlled copy of OP-I 14-001 Reactor Building Closed Cooling Water System.
Selects the correct section to perform.
To add makeup water, THROTTLE OPEN RBCCW Demin M/U Supply Is0 113024.
- Critical Step
- Critical Sequence Student Name:
Standard Dispatches an Operator to RBCCW head tank to determine if level high or low.
Determines makeup to the head tank is warranted.
Controlled copy obtained.
Selects section 3.6 Directs Field Operator to THROTTLE OPEN RBCCW Demin M/U Supply Is0 1 13024.
When RBCCW Head Tank IT201 level
- 314 FULL, CLOSE RBCCW Demin M/U Supply Is0 11 3024.
Eva1 Comments STCP-QA-1256 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
Page 5 of I 1
(
\\
PERFORMANCt CHECKLIST Appl. To/JPM No.: 14.0N.003.151 7
8 Action EVALUATOR CUE:
Role-play NPO and acknowledge the request.
BOOTH CUE:
Depress pfs I DMF RW11401 to remove the leak Depress pfs 2 IOR AN:ARI 06E15 CRYWOLF to cause AR-106-El5 REACTOR BLDG. SAMPLE STATION I C210 SYSTEM TROUBLE to alarm NOTIFY Chemistry when water added to the system.
EVALUATOR CUE:
Role-play NPO and report back to control room that RBCCW Demin M/U Supply Is0 I13024 is full OPEN and RBCCW head tank level is stable, NOT rising or dropping.
If level continues to decrease, INSPECT system for leaks.
%Critical Step
- Critical Sequence Student Name:
Standard Contacts chemistry and NOTIFY Chemistry that water added to the system.
Direct NPO to inspect RBCCW system for leaks.
Eva1 Comments STCP-PA-125B Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.: 14.0N.003.151 Step 9
10 11 12 13 PERFORMANCt CHECKLIST i
Page 6 of 11 Action EVALUATOR CUE:
Role-play NPO and acknowledge the request.
Acknowledge the alarm and refer to appropriate AR procedure PERFORM LA-I 294-001, Reactor Building Sampling Panel Alarm Response EVALUATOR CUE:
Role-play NPO and acknowledge the request.
If unable to maintain level with makeup, PERFORM ON-I 14-001 Loss of Reactor Building Closed Cooling Water System.
Obtain a controlled copy of ON-I 14-001 Loss of Reactor Building Closed Cooling Water System.
Selects the correct section to perform.
- Critical Step
- Critical Sequence Student Name:
Standard Refers to AR-106-001 -El 5 REACTOR BLDG. SAMPLE STATION 1 C210 SYSTEM TROUBLE Contact NPO and instructs PERFORM LA-1294-001, Reactor Building Sampling Panel Alarm Response.
Determines ON-I 14-001 Loss of Reactor Building Closed Cooling Water System entry is required.
Controlled copy obtained.
Selects section 3.1 Eva1 Comments STCP-PA-1258 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
PERFORMANCt CHECKLIST Page 7 of 11 Appl. To/JPM No.: 14.0N.003.151 Step 14 15 16 17 18 Action Record date and time of event.
Obtains Shift supervision approval to proceed EVALUATOR CUE:
Shift supervision has signed and dated the procedure.
Determine cause of loss. IF leakage out of system suspected, Perform section 3.6 of this procedure.
IF leakage out of system suspected:
Check RBCCW Head Tank IT201 level.
IF RBCCW Head Tank IT201 level decreasing Fill in accordance with OP-I 14-001 Reactor Building Closed Cooling Water System.
%Critical Step
- C ri t ica I Seq uence Student Name:
Standard Records date and time of event in the space provided in the procedure Has Shift supervision sign and date the procedure in the space provided in the procedure Determines there is leakage out of the system and section 3.6 is applicable.
Previously performed Previously performed Eva1 Comments STCP-QA-1258 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.: 14.0N.003.151 Step 19 20 PERFORMANCt CHECKLIST r'
Page8of 11 Action Monitor drywell floor drain sump pumping times for any indication of leak inside drywell.
EVALUATOR CUE:
Once the candidate begins the search for the leak:
Report back to control room that WATER CHILLER lK207 TROUBLE (LIGHT I ) is the reason for the LA-1294-001, Reactor Building Sampling Panel Alarm AND there is a sizeable through -wall pipe leak at the RB Sample Station Chillers just downstream of valve 1 131 13, right before drain valve 1 131 19.
Ask the control room operator what 2 valves need to be closed to isolate the leak?
IF Unit Two RBCCW System Shutdown, Ensure Unit Crosstie valves, Low Press Air Cmp RBCCW Return
& Supply Is0 Vlvs 21 3089 and 21 3090, not leaking through at Low Pressure Air Compressor.
- Critical Step
- Critical Sequence Student Name:
Standard Checks:
16103 Determines:
That there is no leakage into the drywell and Step 3.6.7 is applicable next.
DW SUMPS & EQUIP DRN LWFR-Determines Unit 2 RBCCW is in service.
(Based on initial conditions of Unit 2 is operating in Mode 1 @ 100% power)
Eva1 Comments STCP-QA-125B Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. I
Appl. To/JPM No.: 14.0N.003.151 Step 21
(
PERFORMANCt CHECKLIST Page 9 of 11 Action Check following for indication of leak:
RWCU Non regenerative heat exchangers.
RWCU recirc pump coolers.
Off gas refrigeration condensers.
Off gas precoolers.
RB Sample Station Chiller 1 K207 Local Grab Sample cooler 1 E235 PASS Sample cooler (1 C250 rack).
Containment instrument gas compressor coolers.
Low pressure air compressor and aftercooler Unit Two RBCCW Head Tank Level for indication of cross unit leakage.
EVALUATOR NOTE:
Candidate may choose to refer to the RBCCW drawing before isolating the leak.
%Critical Step
- Critical Sequence Student Name:
Standard Determines leakage exists at the RB Sample Station Chiller 1 K207 Eva1 Comments STCP-QA-1250 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
PERFORMANCt CHECKLIST Page 10 of I 1 i
Appl. To/JPM No.: 14.0N.003.151 Step
%22 23 Action IF leak suspected in preceding:
Stop any affected load.
Isolate any affected heat exchanger EVALUATOR CUE:
Role-play the NPO and acknowledge the report.
Notify RW control room RBCCW is entering sumps.
EVALUATOR CUE:
Role-play the NPO report to the control room that valves 1131 13 AND 1131 14 are CLOSED. Also report the leak has stopped.
%Critical Step
- Critical Sequence Student Name:
Standard Contact NPO and direct CLOSING the following valve to isolate the leak:
1131 13 AND 1131 14 Notifies RW control room RBCCW is entering sumps Eva1 Comments STCP-QA-1258 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.: 14.0N.003.151 Eva1 r
PERFORMANCt CHECKLIST Comments (1
Page 11 of 11 Step Action Student Name:
Standard EVALUATOR CUE:
Role-play the NPO and report to the control room that RBCCW head tank level is now rising.
EVALUATOR CUE:
That completes this JPM I
4Critical Step STCP-QA-1258 Rev. 2 (9193)
Page 1 of 1 2004 NRC Exam Rev. 1
- Critical Sequence
TASK CONDITIONS A.
Both Units are in Mode 1 @ 100% power.
INITIATING CUE Your are the PCOM, Respond to any alarms that are received and take the appropriate procedural actions.
2004 NRC Exam Rev. 1 1 of2
L-TASK CONDITIONS A.
Both Units are in Mode 1 @ 100% power.
INITIATING CUE Your are the PCOM, Respond to any alarms that are received and take the appropriate procedural actions.
2004 NRC Exam Rev. 1 2 o f 2
SIR0 Appl. To PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET 52.0P.005.151 1
0 1 /I 6/04 206000 A4.13 4.114.0 JPM Number Rev. No.
Date NUREG 1123 Sys. No.
WA Task
Title:
Recovery from a Manual Closure of HPCl Isolation Valves With an Initiation Signal Present With a Steam Leak Developing. (OP-152-001)
Completed By:
Reviews:
Russ Halm Writer Date InstructorNVriter Approval:
Requesting Supv./C.A.
Date Nuclear Trng. Supv.
Head Date Date Date of Performance:
JPM Performed By:
20 Allowed Time (Min.)
Time Taken (Min.)
Student Name:
Last First M.I.
Employee #/S.S. #
Performance
(
)
Satisfactory
(
)
Unsatisfactory Evaluation:
Evaluator Name:
Signature Typed or Printed Comments:
STCP-QA-125A Rev. 2, (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1 File No. A14-56
L-REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SlRO 52.0P.005.151
- 1.
SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
- 1. Whenever any electrical panel is opened for inspection during JPM performance.
- 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
II. REFERENCES OP-152-001, HPCl System (Revision 30)
AR-114-F04 HPCl LEAK DETECT LOGIC A HI TEMP (Revision 23)
AR-114-F05 HPCl LEAK DETECT LOGIC B HI TEMP (Revision 23)
II I. REACTIVITY MAN I PULATIONS This JPM satisfies the requirements of Operational Activity(s):
44 HPCl Recovery from Isolation IV. TASK CONDITIONS A.
Due to an inadvertent initiation, HPCl isolation valves were manually isolated.
B.
After HPCl was isolated, a reactor scram occurred from an MSlV isolation. HPCl is now required to maintain vessel inventory.
V. INITIATING CUE Recover from the HPCl System isolation, and establish injection to the vessel at approximately 5,000 gallons per minute VI. TASK STANDARD HPCl is started and begins injecting into the vessel. The steam leak is isolated.
VII. TASK SAFETY SIGNIFICANCE Secondary containment steam leak is isolated.
2004 NRC Exam Rev. 1
PERFORMANCt CHECKLIST Appl. TolJPM No.: 52.0P.005.151 Step Critica Action EVALUATOR NOTE:
This JPM must be performed in the simulator.
The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS.
Setup the simulator IAW the attached setup instructions.
Place the Simulator in FREEZE.
When the student is ready to begin, place the Simulator in RUN.
Obtain a controlled copy of OP-I 52-001 HPCl System Selects the correct section to perform.
Review the prerequisites.
EVALUATOR CUE:
If necessary, inform the student that the prerequisites have been meet.
Review the precautions.
step
- Critical Sequence Student Name:
Page 3 of 13 Standard Controlled copy obtained.
Selects section 2.1 1 Ensures that the prerequisites have been met.
Follows applicable precautions.
Comments STCP-QA-1256 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. I
Appl. To/JPM No.: 52.0P.005.151 Step
\\
PERFORMANCt CHECKLIST Page 4 of 13 Action Select appropriate step to begin.
EVALUATOR NOTE:
Preferable to prevent auxiliary oil pump from running while re-pressurizing steam supply line. Opening auxiliary oil pump breaker will shutdown auxiliary oil pump which will result in stop and control valve closure. Desirable to re-pressurize as soon as possible to avoid large condensation of steam with inability to drain due to HPCl TURBINE STEAM SUPPLY HV-155-F001 open.
Observe following status:
HPCl INJECTION HV-155-FO06 CLOSED.
HPCl MIN FLOW TO SUPP POOL HV-155-FO12 CLOSED.
HPCl L-0 CLG WTR HV-156-FO59 CLOSED.
HPCl STM SUPPLY IB IS0 HV-155-FO02 CLOSED.
HPCl STM SUPPLY OB IS0 HV-155-FO03 CLOSED.
- Critical Step
- Critical Sequence Student Name:
Standard Selects Step 2.1 1.7 Verifies RED light NOT LIT and AMBER light LIT for the following valves:
HPCl INJECTION HV-155-FO06 HPCl MIN FLOW TO SUPP POOL HV-155-FOI 2 HPCl L-0 CLG WTR HV-156-FO59 HPCl STM SUPPLY IB IS0 HPCl STM SUPPLY OB IS0 HV-I 55-FO02 HV-155-FO03 Eva1 Comments STCP-QA-12%
Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.: 52.0P.005.151 Step 7
- 8 r" ',
PERFORMANCt CHECKLIST Page 5 of 13 Action HPCl AUXILIARY OIL PUMP 1 P213 IN OPERATION.
OPEN.
HPCl TURBINE STEAM SUPPLY HV-155-FO01 Open HPCl TURBINE AUXILIARY OIL PUMP BREAKER 10274031.
P213 EVALUATOR CUE:
Role-play NPO and acknowledge the request.
BOOTH OPERATOR CUE:
Insert pfs 3 MRF DC188128 OPEN to open the Aux Oil Pump breaker.
EVALUATOR CUE:
Role-play NPO and report back to candidate that HPCl TURBINE AUXILIARY OIL PUMP 1 P213 BREAKER 1 D274031 is OPEN.
- Critical Step
- Critical Sequence Student Name:
Standard Verifies RED light LIT and AMBER light NOT LIT for the following:
HPCl AUXILIARY OIL PUMP 1 P213 HPCl TURBINE STEAM SUPPLY HV-155-FOOI Directs NPO to open Breaker 1 D274031.
Eva1 Comments STCP-QA-1258 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.: 52.0P.005.151 Step 9
a10
- I I 12 PERFORMANCt CHECKLIST Page 6 of 13 Action Ensure following indicate CLOSED:
Reset HPCl system isolation as follows:
Place control switch for HPCl STM SUPPLY IB IS0 HV-155-FOO2 in CLOSE position.
Place control switch for HPCl STM SUPPLY OB IS0 HV-155-FO03 in CLOSE position.
Ensure control switch for HPCl WARM-UP LINE IS0 HV-155-FIOO in CLOSE position.
- Critical Step
- Critical Sequence Student Name:
Standard Verifies RED light NOT LIT and AMBER light LIT for the following valves:
Obtains key and inserts into keyswitch then Places control switch for HPCl STM SUPPLY IB IS0 HV-155-FO02 in CLOSE position.
Verifies RED light NOT LIT and AMBER light LIT Obtains key and inserts into then Places control switch for HPCl STM SUPPLY OB IS0 HV-155-FO03 in CLOSE position.
Verifies RED light NOT LIT and AMBER light LIT Verifies control switch HPCl WARM-UP LINE IS0 HV-155-Fl00 in CLOSE position.
Eva1 Comments STCP-QA-125B Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
PERFORMANCL CHECKLIST Page 7 of 13 i
Appl. To/JPM No.: 52.0P.005.151 Student Name:
Step 13 14 15
- I6 17
+I8 Action Place HPCl AUTO IS0 SIG A RESET HS-E41-1S30 keyswitch to RESET.
Ensure HPCl IS0 DIV 1 IS0 status light EXTl N G U ISH ES.
Return HPCl AUTO IS0 SIG A RESET HS-E41-1S30 keyswitch to NORM.
Place HPCl AUTO IS0 SIG B RESET HS-E41-1S18 keyswitch to RESET.
Ensure HPCl IS0 DIV 2 IS0 status light EXTINGUISHES.
Return HPCl AUTO IS0 SIG B RESET HS-E41-1 SI 8 keyswitch to NORM.
- Critical Step
- Critical Sequence Standard Obtains key and inserts into HPCl AUTO IS0 SIG A RESET HS-E41-1 S30 keyswitch Places keyswitch to RESET Verifies:
HPCl IS0 DIV 1 IS0 status light NOT LIT Places HPCI AUTO IS0 SIG A RESET HS-E41-1 S30 keyswitch to NORM Obtains key and inserts into HPCl AUTO IS0 SIG B RESET HS-E41-1 S I 8 keyswitch Places keyswitch to RESET Verifies:
HPCl IS0 DIV 2 IS0 status light NOT LIT Places HPCl AUTO IS0 SIG B RESET HS-E41-1 S I 8 keyswitch to NORM Eva1 Comments STCP-QA-1258 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.: 52.0P.005.151 Step I 9
- 20 2
PERFORMANCt CHECKLIST i
Page 8 of 13 Action Pressurize steam supply line as follows:
Open HPCl STM SUPPLY OB IS0 HV-155-FO03.
Open HPCl WARM-UP LINE IS0 HV-155-Fl00.
WHEN:
Steam line pressurized to - reactor pressure, Open HPCl STM SUPPLY IB IS0 HV-155-FO02.
Close HPCl RI\\
JP INE IS0 HV-155-FI00.
- Critical Step
- Critical Sequence Student Name:
Standard Places control switch to OPEN for the following valves:
HPCl STM SUPPLY OB IS0 HV-155-FOO3.
HPCl WARM-UP LINE IS0 HV-I 55-FI 00.
Verifies:
Verifies RED light LIT and AMBER light NOT LIT Checks steamline pressure is rising on (PI-E41 -1 R602) and compares this to any Reactor pressure indicator.
WHEN steamline pressure is - reactor pressure:
Places control switch to OPEN for HPCl Verifies RED light LIT and AMBER light NOT LIT STM SUPPLY IB IS0 HV-155-F002.
Places control switch to CLOSE for HPCl WARM-UP LINE IS0 HV-155-FI 00 Verifies AMBER light LIT and RED light NOT LIT Eva1 Comments STCP-QA-1256 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Appl. To/JPM No.: 52.0P.005.151 Step 22 23 24 Action EVALUATOR NOTE:
High drywell pressure coincident with low reactor pressure initiates closure of valves in following step.
When high drywell pressure condition OR low reactor pressure condition clears, valves can be opened.
Ensure following valves OPEN:
HPCl TURB EXH OB VAC BKR HV-155-FO75.
HPCl TURB EXH IB VAC BKR HV-155-F079.
Ensure following alarms CLEAR:
AR-I 14-CO1 HPCl TURB EXH VAC BKR HV-155-FO75 NOT FULLY OPEN.
AR-114-DO1 HPCl TURB EXH VAC BKR HV-155-F079 NOT FULLY OPEN.
Place HPCl System in service feeding reactor vessel as follows:
Place HPCl TURBINE FLOW CONTROL FC-E41-1 R600 in MANUAL set for minimum.
- Critical Step
- Critical Sequence Student Name:
Page 9 of 13 Standard Verifies RED light LIT and AMBER light NOT LIT for the following valves:
HPCl TURB EXH OB VAC BKR HPCl TURB EXH IB VAC BKR HV-155-FO75.
HV-155-FO79.
Verify the following alarms CLEAR:
AR-114-CO1 HPCl TURB EXH VAC BKR HV-155-FO75 NOT FULLY OPEN.
AR-114-DO1 HPCl TURB EXH VAC BKR HV-155-FO79 NOT FULLY OPEN.
Places HPCl TURBINE FLOW CONTROL FC-E41-1 R600 in MANUAL set for minimum.
Eva1 Comments STCP-QA-1258 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 10 of 13 t '
Appl. To/JPM No.: 52.0P.005.151 Step
- 25 Action
~
~
~
~
FAULT STATEMENT WHEN THE STOP VLV FV-15612 AUTOMATICALLY OPENS IN THE NEXT STEP, A STEAM LEAK DEVELOPS IN HPCl EQUIPMENT ROOM.
Close HPCl TURBINE AUXILIARY OIL PUMP I P213 BREAKER 1 D274031.
EVALUATOR CUE:
Role-play NPO and acknowledge the request.
BOOTH OPERATOR CUE:
Insert pfs 4 MRF DC188128 CLOSE to CLOSE the Aux Oil Pump breaker.
EVALUATOR CUE:
Role-play NPO and report back to candidate that HPCl TURBINE AUXILIARY OIL PUMP 1 P213 BREAKER I D274031 is CLOSED.
- Critical Step
- Critical Sequence Student Name:
Standard Directs NPO to CLOSE Breaker I
D274031.
Eva1 Comments STCP-QA-1256 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.: 52.0P.005.151 Step 26 27 PERFORMANCt CHECKLIST Action Observe:
HPCl AUXILIARY OIL PUMP 1P213 STAR HPCl INJECTION HV-155-F006 OPENS.
'S.
EVALUATOR NOTE:
The steam leak should cause the below annunciators to alarm, the candidate should respond to the alarms and isolate the leak by CLOSING HV-155-FO02 and F003 HPCl Steam Isolation valves.
Respond to annunciator on AR-114 AR-114-F04 HPCl LEAK DETECT LOGIC A HI TEMP AND AR-114-FO5 HPCl LEAK DETECT LOGIC B HI TEMP
- Critical Step
- Critical Sequence i
Page 11 of 13 Student Name:
Standard Verifies RED light LIT and AMBER light NOT LIT for the following:
HPCl AUXILIARY OIL PUMP I P213 HPCl INJECTION HV-155-FO06 Acknowledges:
LOGIC A HI TEMP AR-I 14-F04 HPCl LEAK DETECT AND AR-I 14-F05 HPCl LEAK DETECT LOGIC B HI TEMP Eva1 Comments STCP-QA-1258 Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
Appl. To/JPM No.: 52.0P.005.151 PERFORMANCt CHECKLIST Action Observe STM SUPPLY Isolation valves not closed Isolates HPCl steam supply valves.
EVALUATOR CUE:
Role-play the Unit Supervisor and acknowledge the report.
- Critical Step
- Critical Sequence i:
Page 12 of 13 Student Name:
Standard Checks:
STM SUPPLY IB IS0 HV-155-FO02 AND STM SUPPLY OB IS0 HV-155-FO03 Red lights LIT Amber lights NOT LIT Places control switches STM SUPPLY AND IB IS0 HV-155-FO02 STM SUPPLY OB IS0 HV-155-FO03 to CLOSE Verifies:
Red lights NOT LIT Amber lights LIT Inform the Unit Supervisor that HPCl is isolated due to a steam leak.
Eva1 Comments STCP-PA-I 25B Rev. 2 (9193)
Page 1 of 1 2004 NRC Exam Rev. 1
(
PERFORMAN& CHECKLIST Step r'
Action Standard Eva1 Comments EVALUATOR CUE:
That completes this JPM
~age13of-13 '
Appl. To/JPM No.: 52.0P.005.151 Student Name:
- Critical Step
- Critical Sequence STCP-QA-125B Rev. 2 (9/93)
Page 1 of 1 2004 NRC Exam Rev. 1
TASK CONDITIONS A.
Due to an inadvertent initiation, HPCl has been manually isolated.
B.
After HPCl was isolated, a reactor scram occurred from an MSlV isolation. HPCl is now required to maintain vessel inventory.
INITIATING CUE Recover from the HPCl System isolation, and establish injection to the vessel at approximately 5,000 gallons per minute 2004 NRC Exam Rev. I 1 of2
TASK CONDITIONS v
A.
Due to an inadvertent initiation, HPCl has been manually isolated.
B.
After HPCl was isolated, a reactor scram occurred from an MSlV isolation. HPCl is now required to maintain vessel inventory.
INITIATING CUE Recover from the HPCl System isolation, and establish injection to the vessel at approximately 5,000 gallons per minute 2004 NRC Exam Rev. 1 2 of 2