Job Performance Measure Page I of 15 NRC Simulator JPM S.1
Job Performance Measure Page 2 of 15 I. JPM
Title:
Respond to Dropped Control Rod JPM ID Number:
Simulator S.1 Revision:
0 II. Initiated:
Nuclear Regulatory Commission Developer I I I.
Reviewed:
Technical Reviewer IV. Approved:
Cognizant Plant Supervisor (optional)
Nuclear Training Supervisor 14 May 2004 Date Date Date Date
Job Performance Measure Change Description Page 3 of 15 Date
SUMMARY
OF CHANGES
Job Performance Measure Facility:
Millstone Unit 3 Page 4 of 15 Student:
JPM ID Number: Simulator S.l Revision:
0 Task
Title:
Respond to Dropped Control Rod System:
nla Time Critical Task:
( X
) YES
(
) NO Validated Time (minutes): 30 Task Number(s):
Applicable To:
SRO X
RO X
PEO WA Number:
003.AA.1.02 K/A Rating: 3.4 / 3.6 Ability to operate and/or monitor the following as they apply to the Dropped Control Rod: Controls and components necessary to recover rod.
Method of Testing:
Simulated Performance:
Actual Performance:
X Location:
Classroom:
Simulator:
X In-Plant::
Task Standards:
0 Applicant responds to the dropped rod and 0 Applicant recovers the dropped rod Required 0
SP 3602A.1, Rod Cluster Control Exercise Materials:
0 SP 3602A.l-001, Rod Cluster Control Exercise data sheet AOP 3553, Malfunction of the Rod Drive System General
References:
AOP 3553, Malfunction of the Rod Drive System Operator should perform steps ? through ? from memory
Job Performance Measure Page 5 of 15 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
You are to operate and respond to the simulator just as you would in the actual plant.
Initial Conditions:
Initiating Cue:
You are a Control Room Operator at Millstone Generating Station, Unit 3.
The plant is steady state at 100% power. No equipment is out of service.
Surveillance procedure SP 3602A.1 is in progress. Steps 1 through 4.2 are complete. You are to begin exercising control rods. Begin with Shutdown Bank A (SBA).
Do you have any questions?
Are you ready to begin?
You have the shift.
fx.** NOTES TO EVALUATOR ***
- 1.
Critical steps for this JPM are indicated by an asterisk and bolding. For the student to achieve a satisfactory grade, /4LJ critical steps must be completed correctly. The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.
- 2.
When the student states what hidher simulated action/observation would be, read the appropriate Cue.
- 3.
If necessary, question the student for details of simulated actions/observations (Le. What are you looking at? or What are you observing?).
~~
Job Performance Measure Page 6 of 15 Start Time:
I Y R C S Tave = 587°F 0
PZR Pressure = 2235 psig Reactor Power = 100%
Simulator Setup I Malfunction 02-61 occurs when Applicant begins withdrawing rods at SP I 3602A.1, Step 4.3.3.
I.
The withdrawal of rods to 231 steps is to allow the exercise of shutdown banks and control banks A, B and C, and to identify Rod Control System probtems while minimizing the impact of rod movement on core reactivity and AFD.
- 2. If a rod movement or indication problem is identified during the test, complete the test for the affected bank prior to transitioning to AOP 3552, Malfunction of the Rod Drive System.
(SP 3602A.l, NOTE preceding step 4.3.1)
Refer To SP 3602A.1-001 and RECORD all rod bank initial positions.
(SP 3602A.1. SteD 4.3.1)
ROTATE control rod bank SEL switch (MB4), to the desired bank.
(SP 3602A.1, Step 4.3.1)
WITHDRAW applicable rods from full out position to 231 steps.
(SP 3602A.1, Step 4.3.1 1 inction O Z ~ I occurs to determine best rod to drop (not P Here is the working copy of SP 3602A.14 You have the shift.
Applicant reads note.
Applicant records all rod bank initial positions on SP 3602A.l-001.
Applicant rotates control rod bank SEL switch (MB4) to SBA.
4pplicant begins to withdraw SBA rods from full out position to 231 steps.
- if possible)
- 6.
7.*
- 8.
- 9.
I O. -
- 11.
- 12.
- 13.
Stabilize Plant Conditions (AOP 3552, Step I )
Place control rod bank SEL switch in MAN (AOP 3552. Ster, 1.a.)
Verify rods - NOT MOVING (AOP 3552. Ster, 1.b.)
Stop any power increase or decrease evolution in progress (AOP 3552. SteD I
.c.)
Check plant can be - MAINTAINED AT CURRENT POWER LEVEL (AOP 3552, Step 1.d.)
Verify Tavg-Tref deviation - LESS THAN OR EQUAL TO 15°F.
(AOP 3552, Step 1.e.)
Perform the applicable action:
0 IF Tavg greater than Tref AND the steam dumps are open, THEN Increase turbine load to close the steam dumps.
0 IF Tavg greater than Tref AND the steam dumps are closed, THEN Borate to minimize Tavg-Tref deviation.
0 IF Tavg less than Tref, THEN Decrease turbine load to minimize Tavg-Tref deviation.
(AOP 3552, Step 1.e., RNO Column)
Verify TURB LOAD REJECTION ARM C-7 (MB4D 6-6) annuniciator
- NOT LIT.
(AOP 3552, Step 1.f.)
Page 7 of 15 Applicant enters AOP 3552 and performs the following:
Applicant rotates control rod bank SEL switch (MB4) to MAN.
Applicant observes DRPl for rod motion Applicant observes no power change in progress Applicant determines that plant can be maintained at current power level.
Applicant determines the Tavg-Tref deviation and takes appropriate action per the following RNO Applicant reduces turbine load to minimize the Tavg-Tref deviation.
Applicant may reduce load such that rod recovery will not require further adjustment (take Tave-Tref negative so that it is close to zero when rod recovered).
Applicant observes MB4D 6-6 not lit
- 14.
- 15. -
- 16. -
- 17.
- 18.
- 19. -
- 20.
- 21.
Maintain Tavg within 1.5"F of Tref using boration or dilution as necessary.
(AOP 3552, Step 1.g.)
Check No Rod Dropped (AOP 3552, Step 2.)
Verify RPI URGENT FAILURE (MB4C 4-1 0) annuciator - NOT LIT (AOP 3552, Step 2.a.)
Check rod bottom lights - NONE LIT (AOP 3552, Step 2.b.)
Perform the applicable action:
IF only one rod bottom light is lit, THEN using Attachment B, Perform dropped rod recovery.
IF two or more rod bottom lights are lit, THEN Trip the reactor and Go to E-0, Reactor Trip or Safety Injection.
(AOP 3553, Step 2.b., RNO)
Check Plant Conditions (AOP 3552, Att B, Step 1)
Verify operational mode - MODE I (AOP 3552. Att B. Ster, I
.a.)
Identify dropped rod Lit rod bottom (RB) light on DRPl Zero indication on plant process display Computer, Rod Supervision (AOP 3552, Att B, Step I
.b.)
Page 8 of 15 Applicant observes MB4C 4-1 0 not lit.
Applicant recognizes that one rod bottom light is LIT and performs RNO actions:
Applicant goes to Attachment B to perform dropped rod recovery.
Applicant recognizes plant is in Mode I Applicant determines identity of the dropped rod.
- 22.
- 23.
- 24.
- 25.
26 -
- 27.
- 28.
- 30.
- 31.
Using OP 3209B, Shutdown Margin, Determine Shutdown Margin in Modes 1 and 2 with an inoperable rod.
(AOP 3552, Att B, Step 1.c.)
Check ROD CONTROL URGENT FAILURE (MB4C 4-8) annunciator
- LIT (AOP 3552, Att B, Step I
.d.)
Proceed to Step I.m.
(AOP 3552. Att B. SteD I.d.. RNO)
Request I&C correct cause of dropped rod malfunction (AOP 3552, Att B, Step I.m., RNO)
Verify Power Distribution Limits (AOP 3552, Att B, Step 2.)
Check reactor power - GREATER THAN 50%
(AOP 3552, Att B, Step 2.a)
Proceed to Step 3.
(AOP 3552, Att B, Step 2.a, RNO)
Check if Power Should be Reduced.
(AOP 3552, Att B, Step 3)
Check dropped rod in a -
CONTROL BANK (AOP 3552. Att B. SteD 3.a.)
Page 9 of 15 OP 3209B, Step 4.1.4.a IF only one control rod is inoperable, PERFORM the following:
- a. Refer To OP 3209B-001 and RECORD on the bottom of the cover sheet core design analysis shows that shutdown margin is acceptable with any single inoperable control rod and anaassurned most reactive stuck rod.
Annunciator is NOT lit - goes to RNO Simulator Instructor:
Remove malfunction RD0304 rod dropped because of a blown gripper 1
- he fuse.
lPTR is 1.01. Please continue Using TRM, check AFD...
FD is within limits. Please continue Applicant recognizes that the dropped rod is NOT in a CONTROL BANK.
- 32.
- 33.
- 34.
- 35.
- 36.
Refer to Technical Specification 3.1.3.5, and Determine ACTION req u ire men t.
(AOP 3553, Att B, Step 3.a, RNO, niner Cue for 4pplicants only:
Tech Spec 3.1.3 Check time since rod dropped -
GREATERTHAN 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
(AOP 3552, Att B, Step 3.b.)
Perform the applicable action:
0 IF performing rod recovery within I
hour is desired (T/S 3.1.3.1 ACTION b.1. or T/S 3.1.3.5 ACTION a.), THEN Proceed to NOTE prior to step 4. and, IF the rod is NOT recovered within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, THEN Perform steps 3.c. through 3.g.
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> can NOT be accomplished OR is NOT desired, THEN Proceed to step 3.c.
0 IF performing rod recovery within (AOP 3552. Att B. Ster, 3.b.. RNO)
Placing the rod control selector switch to a bank position will freeze the bank overlap unit at its present count.
(NOTE Preceding AOP 3552, Att B, Step 4)
Establish Conditions for Dropped Rod Recovery (AOP 3552, Att B., Step 4)
Page 10 of 15 NOTE:
0 For RO Applicants - provide the following cue.
0 SRO Applicants will be required to refer to Tech Specs and conclude that recovery can continue.
SRO Applicant References TS 3.1.3.5. &
COLR (TRM § 8) and determines that rod recoverv is Dermissible.
I 1 allows us to recover the dropped rod.
Time is less than one hour or Applicant fails this JPM.
Applicant proceeds to Note preceding step 4.
4pplicant reads the NOTE.
- 37.
- 38.
- 39.
- 40.
- 41.
- 42.
- 43.
- 44.
Verify cause of dropped rod -
CORRECTED (AOP 3552, Att B., Step 4.a)
Record affected group step counter position (AOP 3552, Att B., Step 4.b)
Reset affected group step counter to zero (AOP 3552, Att B., Step 4.c)
Align control rod disconnect switches:
- 1. Unlock and Open control rod disconnect switch box (Box 3RDS-HDSBOXI, CAT 60, Key
- I8 in CO key locker)
- 2. Place each rod disconnect switch for the affected bank, except the dropped rod, to the ROD DISCONNECTED position (AOP 3552, Att B., Step 4.d)
Place control rod bank SEL switch to affected bank position (AOP 3552, Att B., Step 4.e)
Recover Dropped Rod as follows:
(AOP 3552, Att B, Step 5)
Check time since rod dropped -
LESSTHAN 1 HOUR (AOP 3552, Att B, Step 5.a.)
Check power - LESS THAN OR EQUAL TO 50%.
(AOP 3552, Att B, Step 5.b.)
Page 11 of 15 Applicant may ask for confirmation. If so, cue Applicant,that l&C has determined and corrected the cause as reported earlier.
Applicant records step counter in AOP 3552 Applicant resets step counters by pressing reset button.
Applicant performs these actions in the simulator. A key is not actually required in the Simulator.
Applicant rotates the Control Rod Bank selector switch to SBA.
Applicant verifies that time since drop is less than one hour Applicant recognizes that power is above 50% and proceeds to the RNO column
Job Performance Measure Page 12 of 15
- 49.
- 50.
I ) IF QPTR is less than or equal to 1.02, THEN Proceed to step 5.c.
- 2) Proceed to step 5.e.
(AOP 3552, Att B, Step 5.b, RNO)
Restores rod to original group position.
Restore Rod Control System (AOP 3552, Att B, Step 6)
Place all lift coil disconnect switches for affected bank to ROD CONNECTED position (AOP 3552, Att B, Step 6)
I I
Examiner Cue:
I The STA reports that QPTR is 1.01 I
I
- 51.
52' Adjust turbine load as necessary while withdrawing the dropped rod (AOP 3552, Att B, Step 5.c)
- 46. to minimize Tavg-Tref deviation Applicant reads step Check ROD CONTROL URGENT FAILURE (MB4C 4-8) annunciator -
LIT (AOP 3552, Att B, Step 6)
Press ROD DRIVE RESET (AOP 3552, Att B, Step 6)
Proceed to step 5.f.
(AOP 3552, Att B, Step 5.d)
- 47.
Applicant proceeds to step 5.f.
Withdraw dropped rod until affected
- 48. group step counter indicates value recorded in step 4.b.
(AOP 3552, Att B, Step 5.9 Applicant withdraws rod until Tavg-Tref deviation approaches 1.5. Then raises turbine load to reduce turbine load (may raise load to achieve Tavg-Tref of -1 5).
Then continues iterative process of withdrawing rod and adjusting turbine load.
Place control rod bank SEL switch in MAN I
- 53.
I 1 (AOP 3552, Att B, Step 6)
Job Performance Measure Page 13 of 15
- 54.
- 55.
- 56.
Exa
~
~~~~
Check affected rod in a -
CONTROL BANK (AOP 3552, Att B, Step 6)
IF affected rod is in Shutdown Bank A OR B, THEN Proceed to step 6.h.
(AOP 3552, Att B, Step 6)
Request I&C position Logic Cabinet master cycler count for proper group stepping.
(AOP 3552, Att B, Step 6)
I niner Cue: I This task is complete.
Stop Time:
- denotes critical step
~-
Job Performance Measure Page 14 of 15 Appendix C3 Form ES-C-1 Job Performance Measure Examinee's Name:
Examiner's Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
VERIFICATION OF COMPLETION No.
Response
Result: SAT or UNSAT Examiner's signature and date:
Job Performance Measure Student Handout Page 15 of 15 JOB PERFORMANCE MEASURE INSTRUCTION SHEET DIRECTIONS TO STUDENT YOU ARE TO OPERATE AND RESPOND TO THE SIMULATOR JUST AS YOU WOULD IN THE ACTUAL PLANT.
Initial Conditions You are a Control Room Operator at Millstone Generating Station, Unit 3. The plant is steady state at 100% power. No equipment is out of service. Surveillance procedure SP 3602A.1 is in progress. Steps 1 through 4.2 are complete. You are to begin exercising control banks. Begin with Shutdown Bank A (SBA).
JOB PERFORMANCE MEASURE APPROVAL SHEET NRC Simulator JPM S.2 Page 1 of 14
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM
Title:
VENT UNISOLATED SI ACCUMULATORS JPM ID Number:
NRC Simulator JPM S.2 Rev:
Ochg 1 Modified from Bank JPM 027 11/08/02 It. Initiated:
Dave Minnich Developer Ill. Reviewed:
Bob Rovce Technical Reviewer IV. Approved:
NA Cognizant Plant Supervisor (optional)
Trad Horner Nuclear Training Supervisor 1 0/17/02 Date 10/17/02 Date Date 1 0/17/02 Date Page 2 of 14
JOB PERFORMANCE MEASURE APPROVAL SHEET
SUMMARY
OF CHANGES I Chanae DescriDtion Non-Intent change - Modified setup to more accurately indicate ES-1.2 plant conditions.
Changed Alternate Path to vent Accumulator B to Accumulators IIN and <CCV.
Date I I
/08/02 4 June 2004 Page 3 of 14
JOB PERFORMANCE MEASURE GUIDE Facility:
Millstone Unit 3 Student:
I
- READ TO THE STUDENT**
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective(s) for this JPM will be satisfied. You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution were actually being performed.
JPM ID Number: NRC Simulator JPM S.2 Rev:
Ochg I Modified from Bank JPM 027 Task
Title:
VENT UNISOLATED SI ACCUMULATORS System:
ECC Alternate Path?
Yes Time Critical Task:
(
) YES
( X ) NO Validated Time (minutes):
20 Alternate Path:
YES Task Number(s):
006*01*57 Applicable To:
SRO X
RO X
PEO WA Number:
006-AI -1 3 WA Rating:
3.5 / 3.7 Method of Testing:
Simulated Performance:
Actual Performance:
X Location:
Classroom:
Simulator:
X In-Plant::
Task Standards:
Vent Any Unisolated SI Accumulators IAW ES-I.2, Post LOCA Cooldown and Depressurization, Step 22 Required Materials:
ES-I.2, Post LOCA Cooldown and Depressurization, Step 22, Rev.013 GA-7, Isolating Accumulators, Rev 000 G en era1 References :
None.
Page 4 of 14
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:
027 Rev Ochg I Simulator Requirements:
- 2. Reset to IC 18 100% power, MOL. Insert MALF RC03A, Severity 0.08 and go to run.
- 4. Insert I/O (SI) 3SIL*MV8808B, CLOSE - FALSE to prevent the B Accumulator outlet isolation valve from closing.
- 5. If necessary, remove the malfunction (RC03A), to fill the PZR to greater than 16%. Acknowledge the annunciators and place the simulator in FREEZE.
- 6. After the examinee has received the initial conditions and initiating cues, place the simulator in RUN.
Approximate simulator setup time is 25 minutes.
Initial Conditions:
The plant has experienced a Loss of Coolant Accident. The control room crew has responded by using the Emergency Operating Procedures and has just completed step 21 of ES-I.2, Post LOCA Cooldown and Depressurization. Shutdown Margin has been verified adequate and ECCS has been verified NOT required.
Initiating Cues:
The US has directed you to complete step 22 of ES-1.2, Post LOCA Cooldown and Depressurization.
- 1. Critical steps for this JPM are indicated by an X after the step number. For the student to achieve a satisfactory grade, students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.
- 2. When the student states what hidher simulated action/observation would be, read the appropriate Cue.
- 3. If necessary, question the student for details of simulated actions/observations (i.e. What are you looking at? or What are you observing?).
critical steps must be completed correctly. The Page 5 of 14
PERFORMANCE INFORMATION JPM Number: NRC Simulator JPM S.2 Rev: Ochg 1 Task
Title:
VENT UNISOLATED SI ACCUMULATORS Start Time:
STEP 1
GRADE STEP 2
Performance Step: CHECK RCS subcooling based on CETCs greater than 32" F.
Standards:
Candidate checks that RCS subcooling based on CETCs greater than 32" F using PPC, Real -Time MMI, or MB indications.
Grade:
SAT UNSAT Performance Step: VERIFY PZR level Greater than - 16%
Standards:
Candidate verifies PZR level - Greater than - 16% at MB4 or with PPC.
GRADE Grade:
SAT UNSAT STEP 3
GRADE STEP 4
Performance Step: Using GA-7, Isolate SI Accumulators Standards:
Grade:
SAT UNSAT Candidate obtains a copy of GA-7, Isolate SI Accumulators.
Performance Step: Locally Unlock and Place the SI (GA-7 step 1) accumulator isolation valve breakers to ON.
32-2R-F4M 32-2R-R5F 32-2W-F4M 32-2W-R3J Comment:
Use the following REMOTEs:
SIR 15, SIR 16, SIR 17, SIR 18 GRADE X
Standards:
Candidate simulates contacting PEO to Locally Unlock and Place the SI Page 6of14
PERFORMANCE INFORMATION JPM Number: NRC Simulator JPM S.2 Rev: Ochg 1 Task
Title:
VENT UNISOLATED SI ACCUMULATORS.
accumulator isolation valve breakers to ON Grade:
SAT UNSAT STEP 5
Performance Step: CONFIRM power supplied to SI accumulator isolation valves.
GRADE Standards:
OBSERVE power on white lights for SI Accumulator Isolation valves illuminate at MB2 RECEIVE report: PEO has Locally Unlocked and Placed the SI accumulator isolation valve breakers to ON Grade:
SAT UNSAT STEP 6
Performance Step: RESET SI, If Necessary (GA-7 step 2)
Comment:
SI will already have been reset in a previous EOP step. However, if the examinee resets SI, this is considered satisfactory. If the examinee asks whether SI has been reset, provide the following cue:
Page 7of14
PERFORMANCE INFORMATION JPM Number: NRC Simulator JPM S.2 Rev: Ochg 1 Task
Title:
VENT UNISOLATED SI ACCUMULATORS STEP
?
X Performance Step:
(GA-7, step 3)
GRADE X
Standards:
ALTERNATE PATH GRADE X
Standards:
ALTERNATE PATH GRADE X
Standards:
GRADE X
Standards:
Grade:
CLOSE all SI accumulator isolation valves Candidate turns the control switch for 3SIH*MV8808A to the close position and observes that the indicating lights for 3SIH*MV8808A are green OFF, red ON. The valve position does not chanae. The valve is still OPEN Candidate turns the control switch for 3SIH*MV8808C to the close position and observes that the indicating lights for 3SIH*MV8808C are green OFF, red ON. The valve position does not change. The valve is still OPEN Candidate turns the control switch for 3SIH*MV8808B to the close position and observes that the indicating lights for 3SIH*MV8808B are green ON, red OFF. The valve is CLOSED Candidate turns the control switch for 3SIH*MV8808D to the close position and observes that the indicating lights for 3SIH*MV8808D are green ON, red OFF. The valve is CLOSED SAT UNSAT STEP 8
GRADE Performance Step:
I Alternate Path Standards:
Candidate observes SI accumulator nitrogen supply valves (3SIL*CV8880 and 3SIL*CV8968) closed on MB2.
Page 8ofl4
PERFORMANCE INFORMATION JPM Number: NRC Simulator JPM S.2 Rev: Ochg I Task
Title:
VENT UNISOLATED SI ACCUMULATORS Grade:
STEP 9
X Performance Step:
GRADE X
Standards:
Grade:
STEP 10 X
Performance Step:
GRADE X
Standards:
GRADE X
Standards:
Page 9ofl4 Green CLOSED indicating lights are ON and red OPEN indicating lights are OFF.
SAT UNSAT For each accumulator requiring venting, OPEN one from each pair of the following isolation valves:
For tank A (3SIL*SV8875A or E)
For tank C (3SIL*SV8875C or G)
Candidate pushes the controller for EITHER 3SIL*SV8875A or E to the open position and observes that the indicating lights are green OFF, red ON. The valve is OPEN.
Candidate pushes the controller for EITHER 3SIL*SV8875C or G to the open position and observes that the indicating lights are green OFF, red ON. The valve is OPEN.
SAT UNSAT OPEN one SI accumulator vent control valve (3SIL*HC943A OR 3s I L*HC943B).
Candidate operates EITHER 3SIL*HC943A OR 3SIL*HC943B to the open position and observes that the up arrow light is on. The valve position is >O%.
Candidate observes pressure in accumulator decreasing on SIL-PI962 or 963.
Candidate observes pressure in
PERFORMANCE INFORMATION JPM Number: NRC Simulator JPM S.2 Rev: Ochg 1 Task
Title:
VENT UNISOLATED SI ACCUMULATORS GRADE Standards:
Grade:
STEP I 1 Performance Step:
(GA-7, step 4)
Com men t:
GRADE Standards:
Grade:
STEP 12 Performance Step:
GRADE Standards:
Page 1 Oof14 accumulators decreasing on:
Tank A: SIL-PI960 or 961, Tank C: SIL-PI964 or 965.
Candidate observes ANN MB2A, 4-7A
& 4-7C, SI ACC A or C PRESSURE LO SAT UNSAT Locally Place the SI accumulator isolation valve breakers to OFF and Lock.
32-2R-F4M 32-2R-R5F 32-2W-F4M 32-2W-R3J Use the following REMOTEs:
SIR 15 SIR 16 SIR 17 SIR 18 Candidate simulates contacting PEO to Locally Unlock and Place the SI accumulator isolation valve breakers to OFF and Lock SAT UNSAT CONFIRM power removed from SI accumulator isolation valves.
OBSERVE power on white lights for SI Accumulator kola tion valves extinguished at MB2 RECEIVE report from PEO that they have Placed the SI accumulator isolation valve breakers to OFF and have Locally Locked the breakers.
PERFORMANCE INFORMATION JPM Number:
NRC Simulator JPM S.2 Rev: Ochg 1 Task
Title:
VENT UNISOLATED SI ACCUMULATORS Grade:
SAT UNSAT Terminating Cue: The evaluation for this JPM is concluded.
Stop Time:
Page 11of14
JPM Number:
VERIFICATION OF JPM COMPLETION NRC Simulator JPM S.2 Modified from Bank JPM 027 Date Performed:
Student:
Evaluator:
Rev:
Ochg 1 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?
Validated Time (minutes):
YES NO X
20 Actual Time to Complete (minutes):
Result of JPM:
Result of oral questions (if applicable):
Number of Questions:
(S for satisfactory, U for unsatisfactory)
Number of Correct Responses:
Score:
Areas for Improvement:
Page 12ofl4
Job VERIFICATION OF JPM COMPLETION Appendix C3 Form ES-C-1 Performance Measure VERIFICATION OF COMPLETION No.
Examinee's Name:
Examiner's Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiner's signature and date:
Page 13of14
STUDENT HANDOUT JPM Number:
NRC Simulator JPM S.2 Initial Conditions:
The plant has experienced a Loss of Coolant Accident.
The control room crew has responded by using the Emergency Operating Procedures and has just completed step 21 of ES-1.2, Post LOCA Cooldown and Depressurization. Shutdown Margin has been verified adequate and ECCS has been verified NOT required.
Initiating Cues:
The US has directed you to complete step 22 of ES-1.2, Post LOCA Cooldown and Depressurization.
Page 14of14
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET NRC Simulator JPM S.3 1 of 11
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM
Title:
Take the Plant Solid JPM ID Number:
NRC Simulator S.3. Revision:
0 21June2004 II. Initiated:
Nuclear Reaulatorv Commission 21June2004 Developer I I I. Reviewed :
Technical Reviewer IV. Approved:
Cognizant Plant Supervisor (optional)
Nuclear Training Supervisor Date Date Date Date 20f I 1
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET Change
SUMMARY
OF CHANGES Description Date t
I I
I 3of I 1
JOB PERFORMANCE MEASURE GUIDE Facility :
Millstone Unit 3 Student:
JPM ID Number:
NRC Simulator S.3.
Revision:
0 21June2004 Task
Title:
Take the Plant Solid System:
Alternate Path Yes.
Time Critical Task:
(
) YES
( X ) NO Validated Time (minutes):
Task Number(s):
Applicable To:
SRO X
RO X
PEO WA Number:
OlO-A4.01 WA Rating:
3.5 13.7 01 0-A4.02 3.4 13.6 Ability to manually operate andlor monitor in the control room:
PZR spray valve PZR heaters.
Method of Testing:
Simulated Performance:
Actual Performance:
X Location:
Classroom:
Simulator:
X In-Plant::
Task Stds: Take the plant solid per OP3208, Section 4.4 or demonstrate ability to begin the process.
Required Materials:
None General
References:
OP 3208
- +*READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
4of 11
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM ID Number:
NRC Simulator S.3.
Revision:
0 Simulator Requirements:
1 2
Reset to IC-28, EOL, OP3208 Step 4.3..39, Preps for Solid Roll the following recorders forward:
e Pressurizer level.
0 RCS wide range pressure.
Hang DANGER tags on: 3SIH*MV8801A & B Place the simulator in RUN and perform the following manual actions:
OPS 3
4 Approximate simulator setup time is 5 minutes.
Initial Conditions:
Following a successful breaker-to-breaker run, Millstone 3 is entering a refueling outage. The plant has been shutdown and a cooldown in progress per OP 3208. Step 4.3.39 is complete.
Initiating Cues:
The Unit Supervisor has directed the Reactor Operator at the controls to establish a solid pressurizer per OP 3208, section 4.4.
- NOTES TO EVALUATOR ***
I. Critical steps for this JPM are indicated by an
- after the step number. For the student to achieve a satisfactory grade, The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.
When the student states what hidher simulated action/observation would be, read the appropriate Cue.
If necessary, question the student for details of simulated actions/observations (Le.
What are you looking at? or What are you observing?).
critical steps must be completed correctly.
- 2.
- 3.
5of 11
VERIFICATION OF JPM COMPLETION Start Time:
No -
1 2
3 4
5 6
This section provides direction to place the RCS in a solid condition, to oxygenate the RCS prior to opening for maintenance or refueling, and to cooldown the pressurizer and RCS while minimizing surge line temperature variations.
(OP 3208, NOTE preceding Step 4.4.1)
MAINTAIN all RCS WR hot leg temperatures between 170°F and I
80°F, while performing steps 4.4.2 through 4.4.8.
To provide Pzr insurge warning, PERFORM the following:
(OP 3208, Step 4.4.1)
(OP 3208, Step 4.4.2)
VERIFY a low limit alarm for the Pzr surge line temperature computer point (RCS-T450*) is set at 10°F less than the current Pzr liquid space temperature computer point (RCS-T453*).
(OP 3208, Step 4.4.2.a)
IF a pressurizer insurge occurs, Refer To step 4.3.29 and PERFORM applicable actions.
(OP 3208. Stet, 4.4.2.b)
Differential temperature between pressurizer liquid and surge line should not exceed 100°F.
(CAUTION ureceding OP 3208. Steu 4.4.3)
Applicant reads note.
Applicant reads step and should check current RCS Temperature and Cooldown Rate Alarm not set. Applicant sets low limit alarm 10°F below PZR liquid temperature Applicant reads step and reviews step 4.3.29.
Applicant reads CAUTION.
6 of 11
No -
7 8 -
9 -
I O I 1 12 13 VERIFICATION OF JPM COMPLETION 1 The pressurizer is filled while maintaining a continuous oufflow.
This avoids thermal shock of the surge line nozzle due to insurge.
A sudden drop in surge line temperature indicates surge line flow reversal.
2 3
Spray flow required to maintain RCS pressure constant with all Pzr heaters energized is approximately 30 to 35 gpm. A net charging rate greater than this value may cause a pressurizer insu rge.
(NOTE preceding OP 3208, Step 4.4.3)
PLACE the RCS in a solid condition as follows:
[OP 3208. SteD 4.4.3)
VERIFY step 4.3.39 is complete.
(OP 3208, Step 4.4.3.a)
VERIFY the following letdown paths:
Three letdown orifices in service open 3CHS-128, "L/D FLOW," fully (OP 3208, Step 4.4.3.b)
VERIFY 3CHS-PKl31 "UD PRES C N TL )I' in "AUTO )" ma in ta i n i n g maximum letdown (not to exceed 120 gpm) consistent with plant capabilities.
VERIFY all pressurizer heaters sne rg ized.
- OP 3208, Step 4.4.3.c)
'OP 3208, Step 4.4.3.d)
VERIFY pressurizer level stable.
'OP 3208. Stm 4.4.3.e) nd Applicant reads NOTE
~~
Applicant initially told that 4.3.39 is complete. Examiner may remind Applicant of this by prompt "Step 4.3.39 is complete" Applicant verifies all three letdown orifice block valves OPEN and 3CHS-I 28 full open.
Applicant verifies 3CHS-PK131 is in AUTO Applicant verifies all PZR Heaters are ON Applicant observes stable PZR level 7of 11
14 15 16 17 18 VERIFICATION OF JPM COMPLETION VERIFY surge line temperature approximately equal to pressurizer liquid space temperature.
(OP 3208, Step 4.4.34 MAINTAIN RCS pressure in the recommended operating region as specified in Attachment I using spray adjustment.
(OP 3208, Step 4.4.3.g)
Slowly RAISE output on 3RCS-LK459, PZR LVL; or 3CHS-FK121, CHG LINE FLOW, to fill pressurizer until surge line temperature just indicates a decrease.
(OP 3208, Step 4.4.3.h)
WHEN Pzr surge line temperature indicates a decrease, slightly BACK OFF output on 3RCS-LK459, PZR LVL or 3CHS-FK121, CHG LINE FLOW, to reestablish pressurizer surge line outflow.
(OP 3208, Step 4.4.34 WHEN the RCS is solid, as indicated by actual Pzr level greater than 100% (cold cal. -87%) and by increasing pressure and letdown flow rate, LOWER output on 3RCS-LK459, PZR LVL or 3CHS-LK121, CHG LINE FLOW, to maintain maximum letdown flow rate (not to exceed 120 gpm)
IOP 3208, Step 4.4.3.i)
Applicant verifies Surge Line temperature and PZR liquid temperature about equal.
Applicant determines pressure band of 300 to 375 psig by Attachment I.
If necessary, ask the Applicant for this band.
Applicant rotates 3RCS-LK459 or 3CHS-FK121 to RAISE output.
Applicant observes decrease in surge line temperature and rotates controller to lower output (reduce flow).
and Applicant has demonstrated control I d the JPM or proceed to solid plant.
solid plant.
Applicant lowers controller to maintain steady pressure and match letdown with makeup.
8of11
VERIFICATION OF JPM COMPLETION Procedure Step Performance Standard s/u ADJUST 3CHS-PK131, "UD PRES CNTL," setpoint to maintain RCS Applicant adjusts 3CHS-PK131 to maintain steady pressure.
pressure in the recommended operating region as specified in.
in automatic, changes in charging flow will result in changes in letdown flow.
Stop Time:
9of 11
VERIFICATION OF JPM COMPLETION Appendix C3 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiner's signature and date:
I O of 11
STUDENT HANDOUT JPM ID Number:
NRC Simulator S.3.
Initial Conditions:
Following a successful "breaker-to-breaker" run, Millstone 3 is entering a refueling outage. The plant has been shutdown and a cooldown in progress per OP 3208. Step 4.3.39 is complete.
Initiating Cues:
The Unit Supervisor has directed the Reactor Operator at the controls to establish a solid pressurizer per OP 3208, section 4.4.
11 of 11
JOB PERFORMANCE MEASURE APPROVAL SHEET NRC Simulator JPM S.4 I
of I 1
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM
Title:
Steam Generator Level Control with Feedwater Level Control Bypass Valve in AUTO and Feedwater Level Control Valve in HAND.
JPM ID Number:
NRC Simulator S.4 Revision:
0 It. Initiated:
Nuclear Regulatory Commission Developer I I I. Reviewed:
Technical Reviewer IV. Approved:
Cognizant Plant Supervisor (optional)
Nuclear Training Supervisor 25 May 2004 Date Date Date Date 2of 11
-~
JOB PERFORMANCE MEASURE APPROVAL SHEET
SUMMARY
OF CHANGES 3of11
JOB PERFORMANCE MEASURE GUIDE Facility:
Millstone Unit 3 Student:
JPM ID Number:
NRC Simulator S.4 Revision:
0 Task
Title:
Steam Generator Level Control with Feedwater Level Control Bypass Valve in AUTO an Feedwater Level Control Valve in HAND.
System:
059 Time Critical Task:
(
) YES
( X ) NO Validated Time (minutes):
20 Task Number(s):
Applicable To:
SRO X
RO X
PEO WA Number:
059 A2.12 WA Rating:
3.4 / 3.1 Ability to (a) predict the impacts of the following malfunctions or operations on the MFW; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Failure of feedwater regulating valves.
Method of Testing:
Simulated Performance:
Actual Performance:
X Location:
Classroom:
Simulator:
X In-Plant::
Task Standards:
Satisfactorily restore automatic SG water level control using the Feedwater Flow Control Bypass Valve.
Required Materials:
Operating Procedure OP 3321, Main Feedwater, Section 4.1 7.
General
References:
Operating Procedure OP 3321, Main Feedwater, Section 4.1 7.
- READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective(s) for this JPM will be satisfied. You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution were actually being performed.
4of 11
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:
NRC Simulator S.4 Revision:
0 Simulator Requirements:
- 1. Reset to IC 18.
- 2. Insert Malfunctions:
None
- 3. I/O override:
None
- 4. Place simulator in RUN.
- 6. Place simulator in FREEZE.
- 7. Place simulator in RUN after operator receives instruction.
Approximate simulator set up time is Initial Conditions:
Plant is operating at power. Steam Generator A level control has been erratic due to a malfunction affecting the associated Feedwater Control Valve. The Feedwater Control Valve is in HAND.
Initiating Cues:
Place S/G A Water Level Control in Automatic using OP 3321, Section 4.17, to place the Feedwater Bypass Control Valve in AUTOMATIC with the Feedwater Control Valve in MANUAL.
NOTES TO EVALUATOR c*c*
- 1.
Critical steps for this JPM are indicated by an X after the step number. For the student to achieve a satisfactory grade, The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.
critical steps must be completed correctly.
- 2.
When the student states what his/her simulated action/observation would be, read the appropriate Cue.
- 3.
If necessary, question the student for details of simulated actions/observations (Le. What are you looking at? or What are you observing?).
5of 11
VERIFICATION OF JPM COMPLETION Start Time:
NOTE:
- 1. If a problem with a feedwater control valve affects its ability to automatically close on a loss of power (air) or receipt of a FWI signal, the ACTION statement for T/S LCO 3.3.2 may apply.
- 2. When a feedwater regulating valve in automatic control is not operating properly, this section modifies the Feedwater Control System to operate with the feedwater regulating valve open and in "manual" control and its associated feedwater regulating bypass valve in automatic.
(NOTE preceding 3321, Step 4.17.1)
STEP I
Performance Step: REQUEST authorization from the Duty Officer, Operations Manager, or Unit Director prior to performing this Section.
(3321, Step 4.17.1)
GRADE Standards:
Cue:
The Duty Officer authorized this action STEP 2
Performance Step: Refer To T/S LCO 3.3.2 and determine required ACT1 ON s.
(3321, Step 4.1 7.2)
GRADE Standards:
Cue:
The Unit Supervisor determined and initiated all T/S required ACTIONS.
6of 11
VERIFICATION OF JPM COMPLETION STEP 3
Performance Step: ENSURE a Trouble Report has been generated for the affected FW flow control valve.
(3321, Step 4.1 7.3)
GRADE Standards:
Cue:
A Trouble Report has been generated.
STEP 4
X Performance Step: PLACE 3FWS-SK509A, PP A & B MSTR SPEED CNTL, in MAN (MB5).
(3321, Step 4.17.4)
GRADE Standards:
Candidate places 3FWS-SK509A in Manual.
Grade:
Sat Unsat STEP 5
Performance Step: IF 3FWS-FK510, steam generator I feed regulating valve, is the affected valve, PERFORM the following:
(3321, Step 4.1 7.5.)
Standards:
None STEP 6
Performance Step: VERIFY 3FWS-LK550, SGI CONTROL BYP in MAN (MB5).
(3321, Step 4.1 7.5.a)
GRADE Standards:
Applicant observes that 3FWS-LK550 is in Manual.
Grade:
Sat Unsat 7of 11
VERIFICATION OF JPM COMPLETION STEP 7
X Performance Step: PLACE 3FWS-FK510, SGI CONTROL FLOW in MAN (MB5).
(3321, Step 4.17.5. b)
GRADE Standards:
Applicant selects manual on 3FWS-FK510.
Grade:
Sat Unsat STEP 8
X Performance Step: PERFORM the following steps GRADE simultaneously until 3FWS-LK550 is 60 to 70% open while maintaining SG NR levels between 45% and 55%
(MB5):
0 Slowly THROTTLE open 3FWS-LK550, SGI CONTROL BYP 0
Slowly THROTTLE close 3FWS-FK510, SGI CONTROL FLOW (3321, Step 4.1 7.5.c)
Standards:
Applicant throttles the FCV closed while opening the FCV Bypass.
Grade:
Sat Unsat NOTE:
To prevent erratic valve operation, the NIS feed forward signal gain for a FW bypass level control valve should be set to zero prior to placing valve controller in AUTO.
NOTE preceding (3321, Step 4.17.5.d)
STEP 9
Performance Step: REQUEST I&C Department remove circuit card 3FWS-LY-550, to defeat NIS feed forward signal gain for channels 550 and 560 (C7-421).
(3321, Step 4.1 7.5.d) 8of I 1
VERIFICATION OF JPM COMPLETION GRADE Standards:
Applicant requests removal of circuit card from Simulator Booth or Examiner.
Cue:
Simulator Booth Operator or Examiner reports to Applicant that the NIS feed forward signal gain for channels 550 and 560 are defeated.
STEP 10 X
Performance Step: PLACE 3FWS-LK550, "SG 1 'I "CONTROL" "BYP," in "AUTO" (MB5).
(3321, Step 4.1 7.5.e)
GRADE Standards:
Applicant selects automatic on 3FWS-FK550.
Grade:
Sat Unsat STEP 11 Performance Step: MONITOR 3FWS-LK550, SG 1 feed regulating valve bypass valve, for unstable operation.
(3321, Step 4.17.5.f)
GRADE Standards:
Applicant monitors 3FWS-LK550 and S/G water level for unstable operation.
Grade:
Sat Unsat Terminating Cue: The evaluation for this JPM is concluded.
Stop Time:
9of11
VERIFICATION OF JPM COMPLETION Appendix C3 Form ES-C-I VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiner's signature and date:
10 of 11
STUDENT HANDOUT JPM Number:
NRC Simulator S.4 Initial Conditions:
Plant is operating at power. Steam Generator A level control has been erratic due to h malfunction affecting the associated Feedwater Control Valve. The Feedwater Control Valve is in HAND.
In i tiatinq Cues:
Place S/G A Water Level Control in Automatic using OP 3321, Section 4.1 7, to place the Feedwater Bypass Control Valve in AUTOMATIC with the Feedwater Control Valve in MANUAL.
11 of 11
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET NRC Simulator JPM S.5 I
of 12
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM
Title:
RESPOND TO CONTAINMENT SUMP BLOCKAGE JPM ID Number:
NRC Simulator JPM S.5 Revision:
0 I I.
Initiated:
Nuclear Regulatory Commission Developer 21June2004 Date I I I. Reviewed:
Technical Reviewer IV. Approved:
Cognizant Plant Supervisor (optional)
Nuclear Training Supervisor Date Date Date 2 of 12
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET
SUMMARY
OF CHANGES 3of12
JOB PERFORMANCE MEASURE GUIDE Facility:
Millstone Unit 3 Student:
JPM ID Number: NRC Simulator JPM S.5
. Revision:
0 Task
Title:
System:
FZI Atlernate Path?
Yes Time Critical Task:
(
) YES
( X ) NO Validated Time (minutes): N/A Alternate Path:
YES RESPOND TO CONTAINMENT SUMP BLOCKAGE Task Number(s):
Applicable To:
SRO X
RO X
PEO WA Number:
026-A2.07 WA Rating:
3.9 J 3.6 Ability to (a) predict the impacts of the following malfunctions or operations on the CSS: and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of containment spray pump suction when in recirculation mode, possibly caused by clogged sump screen,...
Method of Testing:
Simulated Performance:
Actual Performance:
X Location:
Classroom:
Simulator:
X I n-Plant: :
Task Standards:
RESPOND TO CONTAINMENT SUMP BLOCKAGE Required Materials:
None General
References:
ES-1.3, Transfer to Cold Leg Recirculation ECA-1.I, Loss of Emergency Coolant Recirculation GA-10, Filling RWST
- READ TO THE STUDENT"*
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
4 of 12
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number: NRC Simulator JPM S.5 Revision: 0 Simulator Requirements:
Establish Cold Leg Recirculation up to ES-I.3, Step 5.
RWST Level = 90,000 gallons ??
Malfunction Insert malfunction CH08 at Severity Level 100% and ramp in over 4 minutes.
5 of 12
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number: NRC Simulator JPM S.5 Revision :
0 Initial Conditions:
Following a large break loss of coolant accident (LBLOCA), the plant has established cold leg recirculation per ES-1.3, up to and including Step 5. You are to complete the remaining steps of ES-1.3 and respond to the plant as appropriate.
Initiating Cues:
You have the shift.
- clr* NOTES TO EVALUATOR ****
- 1.
Critical steps for this JPM are indicated by an
- after the step number. For the student to achieve a satisfactory grade, &
critical steps must be completed correctly.
The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.
When the student states what hidher simulated action/observation would be, read the appropriate Cue.
If necessary, question the student for details of simulated actions/observations (i.e.
What are you looking at? or What are you observing?).
- 2.
- 3.
6 of 12
PERFORMANCE IN FORMATION JPM Number: NRC Simulator JPM S.5 Revision:
0 Task
Title:
RESPOND TO CONTAINMENT SUMP BLOCKAGE Start Time:
No -
I 2
~~
~~
Restore One Train Of Service Water And RPCCW ES-1.3, Step 6.
CONTAINMENT SUMP SCREEN BLOCKAGE DETERMINATION CRITERIA If ANY of the conditions listed below exists, Reset SI and CDA, then STOP the affected pump(s) and, Go to ECA-I.I
, Loss of Emergency Coolant Recirculation:
- a. Containment sump level indications are NOT consistent with plant conditions 0 no indication of level increase narrow range level, 3RSS-L149, decreasing (MB2)
- b. ANY running RSS, Charging or Safety Injection pump or combination of pumps, taking suction from the Containment sump, indicating the following:
0 Amps oscillating 0 Flow oscillating 0 Discharge pressure oscillating ES-I.3, Foldout Page A
Performance Standard Applicant will continue ES-I.3 until containment sump blockage is recognized.
From Millstone 3 Simulator Book 50% Severity -
0 Sump level decreases to -1/2 feet 0
Cavitation and flow oscillations evident 80% Severity -
0 Sump will empty 0
Severe cavitation and major flow oscillations 100% Severity -
0 Sump will empty 0
Cavitation and flow oscillations will eventually go to zero as sump level is expended.
Failure Criteria - Applicant does not recognize and respond to containment sump blockage 4 minutes after reaching 100% severity (8 minutes after malfunction inserted).
Applicant stops all ECCS Pumps:
0 Both Charging Pumps 0
Both SI Pumps 0
All four RSS PumDs I
.EAVES ES-1.3 AND ENTERS ECA-I. I.
7 of 12
PERFORMANCE INFORMATION JPM Number: NRC Simulator JPM S.5 Revision:
0 Task
Title:
RESPOND TO CONTAINMENT SUMP BLOCKAGE No -
3 4
5 6
7 If the suction source is lost to any ECCS or containment spray pump, the pump must be stopped.
CAUTION preceding ECA-1.1, § I If emergency coolant recirculation capability is restored during this procedure, further recovery actions should continue by going to the procedure and step in effect.
NOTE preceding ECA-1.1, § I Continue Attempts To Restore Emergency Coolant Recirculation Equipment ECA-1.1. 6 1
~~
Try to restore at least one Train.
- a. IF aligned for cold leg recirculation, CLOSE recirculation spray header isolation valve for selected train-0 3RSS*MOV20A 0 3RSS*MOV20B START selected recirculation spray pump A OR B START selected train Charging and Safety Injection pumps ECA-1.I,
§ I, RNO Column If offsite power is lost after SI reset, manual actions to restart safeguards equipment may be required.
CAUTION Drecedina ECA-1.1.6 2 Applicant enters ECA-1.1 and reads CAUTION. Required actions should be completed already.
Applicant reads NOTE.
Applicant closes 3RSS*MOV20A or B Applicant starts the associated RSS pump Applicant may start the associated Charging and Safety Injection pumps Sump is still clogged. Applicant will have to secure the pumps just started per the CAUTION preceding ECA-1.I, Step 1 above.
Failure to recognize continuing sump blockage and secure the pumps is a failure criteria.
Applicant reads the CAUTION 8 of 12
PERFORMANCE INFORMATION JPM Number:
NRC Simulator JPM S.5 Revision:
0 Task
Title:
RESPOND TO CONTAINMENT SUMP BLOCKAGE RESET ESF Actuation Signals If Required SI CDA LOP SIR ECA-I.I,
§ 2 Add Makeup To RWST
- a. Using GA-10, Fill the RWST as required while continuing with this procedure WHEN RWST level has increased to greater than 100,000 gal THEN Consult ADTS to determine what flow path should be established for injection ECA-1.I,
§ 3 ALTERNA IS c Applicant resets those signals requiring reset. May reset all signals regardless of status -this is not an error. Failure to reset a locked-in signal is an error.
CUE: Fill the RWST per GA-10. Another Operator will complete ECA-I.I.
Applicant should enter GA-10 and proceed with filling the RWST.
4PPLlCANT ENTERS GA-IO THANK You.
Stop Time:
9 of 12
VERIFICATION OF JPM COMPLETION JPM Number:
NRC Simulator JPM S.5 Revision:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
critical steps must be completed Time Critical Task?
Validated Time (minutes):
YES NO X
N/A Actual Time to Complete (minutes):
Result of JPM:
(3 for satisfactory, U for unsatisfactory)
Result of oral questions (if applicable):
Number of Questions:
Number of Correct Responses:
Score:
Areas for Improvement:
10 of 12
Job Performance VERIFICATION OF JPM COMPLETION Appendix C3 Form ES-C-1 Measure VERIFICATION OF COMPLETION No.
Examinee's Name:
Examiner's Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiner's signature and date:
11 of 12
STUDENT HANDOUT JPM Number:
Initial Conditions:
Initiating Cues:
NRC Simulator JPM S.5 A large break loss of coolant accident (LBLOCA) has occurred. The plant has just established cold leg recirculation per ES-1.3, Step 5. You are to complete the remaining steps of ES-I.3 and respond to the plant as appropriate.
You have the shift.
12 of 12
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET NRC Simulator JPM S.6 Page 1 of 22
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM
Title:
START, PARALLEL & LOAD THE B EDG FROM MB8 JPM ID Number:
NRC Simulator JPM S.6 Revision:
4, Chg. 3 Modified from Millstone 3 JPM Exam Bank (JPM Number 026) 1 0/2 I
/02 I I.
Initiated:
Nuclear Regulatory Commission Developer I I I. Reviewed:
Technical Reviewer IV. Approved:
Cognizant Plant Supervisor (optional)
Nuclear Training Supervisor 21June2004 Date Date Date Date Page 2 of 22
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET Change
SUMMARY
OF CHANGES Description Date Page 3 of 22
JOB PERFORMANCE MEASURE GUIDE Facility:
Millstone Unit 3 Student:
Title:
START, PARALLEL AND LOAD THE B EDG FROM MB8 JPM ID Number:
NRC Simulator JPM S.6 Revision:
4, Chg. 3 Modified from Millstone 3 JPM Exam Bank (JPM Number 026)
System:
EDG Alternate Path? YES Time Critical Task:
(
) YES
( X ) NO Validated Time (minutes): 18 Task Number(s):
064-01 -01 6 Applicable To:
SRO X
RO X
PEO WA Number:
064-000-A4.0 1 WA Rating:
4.0 / 4.3 Ability to manually operate and/or monitor in the control room: Local and remote operation of the ED/G Method of Testing:
Simulated Performance:
Actual Performance:
X Location:
Classroom:
Simulator:
X In-Plant::
Task Standards:
Satisfactorily start the B Emergency Diesel Generator from MB8 using OP 3346A.
Required Materials:
None. Stop watch General
References:
OP 3346A, Rev. 021-01
- READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
Page 4 of 22
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM ID Number:
NRC Simulator JPM S.6 Revision:
4, Chg. 3 Drawn from Millstone 3 JPM Exam Bank (JPM Number 026)
Requirements:
- 1. Reset to IC-I 8 or equivalent 100% power IC.
- 2. Insert malfunction EG08B, Severity = 100% (6,000 kW).
- 3. Place the simulator in Run and check that the IC is stable.
It is not necessary to place the simulator in freeze.
- 4. Commence the JPM evaluation after the examinee has received the initial conditions and initiating cues.
Approximate simulator setup time is 3-5 minutes.
Initial Conditions:
The plant is in a normal electric plant lineup with both EDGs ready for automatic loading. The Outside Rounds PEO has been sent to the B EDG enclosure and completed the preliminary checks for starting the B EDG. The prestart portions of the EDG Data Sheet (OP 3346A-013) and Diesel B Operating Log (OP 3346A-015) have been completed. The SBO diesel is not running. The other RO is filling out the Ops Forms.
Initiating Cues:
The US has directed you to conduct a start of the B EDG from MB8 using OP 3346A, Section 4.4 starting with step 4.4.4. The EDG is to be paralleled to the bus and loaded to 4500KW.
- NOTES TO EVALUATOR *-
I. Critical steps for this JPM are indicated by an X after the step number. For the student to achieve a satisfactory grade, The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.
critical steps must be completed correctly.
- 2.
When the student states what hidher simulated action/observation would be, read the appropriate Cue.
- 3.
If necessary, question the student for details of simulated actions/observations (Le. What are you looking at? or What are you observing?).
Page 5 of 22
Start Time:
STEP 1
GRADE STEP 2
GRADE STEP 3
GRADE VERIFICATION OF JPM COMPLETION X
Performance Step: OPEN 3SWP*AOV39B, DG B OUT (MBI). (Step 4.4.4)
X Standards:
Depresses the open pushbutton for 3SWP*AOV39B on MBI and observes that the indicating lights shift to green OFF, red ON.
Grade:
SAT UNSAT Performance Step: VERIFY EDG B VOLT REG SEL (MB8), in AUTO (preferred) or MANUAL. (Step 4.4.5)
Standards:
Observes the control switch for the By diesel generator voltage regulator is aligned to the AUTO position.
Grade:
SAT UNSAT Performance Step: REQUEST Operator press EXCITER RESET button (3EGS*PNLB), and CHECK white READY FOR AUTO START (3EGS*PNLB) light lit. (Step 4.4.6)
Standards:
Contacts the Outside Rounds PEO and directs the exciter reset button pressed and checks the ready for auto start I light lit.
Grade:
SAT UNSAT Page 6 of 22
STEP 4
GRADE STEP 5
GRADE VERIFICATION OF JPM COMPLETION Performance Step: START EGO*P1 B, PRELUBE pump (MB8). [SER 102-811. (Step 4.4.7)
Standards:
Rotates the control switch for the B diesel generator rocker arm prelube pump to the start position and observes that the indicating lights shift to green OFF, red ON. Also notes the time that the prelube pump was started.
Grade:
NOTE SAT UNSAT The prelube pump need not be run for 2 minutes to satifactorily complete the step Performance Step: WHEN two minutes have elapsed, STOP EGO*PI B, PRELUBE pump (MB8). (Step 4.4.8)
Standards:
After the prelube pump has run for 2 minutes, rotates the control switch for the B diesel generator rocker arm prelube pump to the stop position and observes the indicating lights shift to green ON, red OFF.
Grade:
SAT UNSAT Page 7 of 22
VERIFICATION OF JPM COMPLETION STEP 6
Performance Step: VERIFY SBO diesel is paralleled to bus 34D. (Step 4.4.9)
GRADE Standards:
As part of the initial conditions, the examinee was told that the SBO diesel was not running. May check the SBO diesel breaker (3BGS-ACB-BG-A is OPEN) on MB8 as a second check.
Grade:
SAT UNSAT Page 8 of 22
VERIFICATION OF JPM COMPLETION STEP 7
Performance Step: CHECK that the following conditions do mexist:
Emergency diesel generator A is inoperable If Emergency diesel generator A is operating in parallel.
If Severe weather If Other possible loss of offsite power (LOP) condition.
I Cross tie breaker 34D*l T-2 closed while 34B is paralleled to Unit 2 bus 24E (Step 4.4.1 0)
GRADE Standards:
Checks MB8 indications for the status of the other diesel generator and offsite power. Asks the US for the status of the other parameters.
Grade:
SAT UNSAT STEP 8
X Performance Step: PLACE diesel generator B MODE SEL switch (MB8) in PARALLEL.
(Step 4.4.1 I)
GRADE X
Standards:
Rotates the B diesel generator mode selector switch to the parallel position.
Grade:
SAT UNSAT Comment:
The RO may request the stopwatch to time the EDG start or they may use the computer.
Page 9 of 22
VERIFICATION OF JPM COMPLETION STEP 9
X Performance Step: PLACE diesel generator B START switch (MB8) in START. (Step 4.4.1 2)
GRADE X
Standards:
Rotates the start switch for the B diesel generator to the %tart position and observes that exciter volts, generator volts and generator frequency meters will move off their bottom pegs as EDG comes up to speed.
Grade:
SAT UNSAT Comments:
The examinee should note the length of time for the diesel to start. This will be used to complete form 3346A-013.
It is not necessary to complete the form to satisfy the critical nature of this step.
STEP I O Performance Step: CHECK diesel generator B LOAD light (MB8) lit.-(Step 4.4.13)
GRADE Standards:
When the By diesel generator frequency meter indicates 60 Hz, observes that the white LOAD light is on.
Grade:
SAT UNSAT Page 10 of 22
VERIFICATION OF JPM COMPLETION STEP 11 Performance Step: Refer to OP 3346A-013, Start section and DOCUMENT the following: (Step 4.4.14)
Time diesel started Diesel start time GRADE Standards:
Completes the section for time diesel started and the diesel starting time.
Grade:
SAT UNSAT Page 11 of 22
VERIFICATION OF JPM COMPLETION STEP 12 Performance Step: COMPLETE Immediately after diesel started section of OP 3346A-015.
(Step 4.4.15)
GRADE Standards:
Completes that section of OP 3346A-01 5.
Grade:
SAT UNSAT STEP 13 Performance Step:
diesel generator B is to be paralleled to bus 34D, Go To Section 4.12. (Step 4.4.16)
GRADE Standards:
Proceeds to section 4.12.
Grade:
SAT UNSAT STEP 14 Performance Step:
paralleling diesel from Control Room, PERFORM the following (MB8):
IF CONTROL MODE switch is selected to LOCAL, using key #
ILCO 999NY1 E, PLACE CONTROL MODE switch in REMOTE (3EGS*PNLB). (Step 4.12.1.a)
GRADE Standards :
Contacts Outside Rounds PEO to check the position of the Control Mode switch.
Grade:
SAT UNSAT Page 12 of 22
STEP 15 GRADE STEP 16 GRADE STEP 17 GRADE VERIFICATION OF JPM COMPLETION X
Performance Step: PLACE diesel generator B to bus 34D SYNC SEL switch in ON. (Step 4.12.1.b)
X Standards:
Places the B train handle into the B diesel generator to bus 34D synchronizing selector switch and rotates the handle to the onJ position.
Will also observe rotation of the synchroscope.
Grade:
SAT UNSAT Performance Step: E34C-1 T-2, 34D-34B TIE is closed, CHECK SBO D/G not paralleled to bus 348. (Step 4.12.1.c)
Standards:
Observes that 34D-IT-2 tie breaker is closed. Checks that the SBO D/G is not in parallel with bus 348.
Grade:
SAT UNSAT Performance Step:
34D *IT-2 34D-34B tie Breaker is closed, check bus 348 is not paralleled to Unit 2 24E (step 4.12.d)
Standards:
Observes that 34D-IT-2 tie breaker is closed. Check 24E not paralleled to 34B.
Grade:
SAT UNSAT Page 13 of 22
VERIFICATION OF JPM COMPLETION STEP 18 X
Performance Step: SYNCHRONIZE diesel to bus 34D as follows:
- a.
ADJUST diesel generator B S P E E D/LOAD switch to obtain slow rotation of synchroscope in fast direction.
- b.
Using the selected regulator, ADJUST EDG B voltage regulator to obtain INCOMING voltage slightly greater than RUNNING voltage:
AUTO VOLT REGULATOR MAN VOLT REGULATOR (Step 4.12.1.e)
GRADE X
Standards:
Rotates the B diesel generator Speed/Load switch to the raise/lower positions as necessary so the synchroscope is rotating slowly in the fast direction.
GRADE X
Standards:
Rotates the B diesel generator voltage regulator adjust switch to the raise/lower positions as necessary until the INCOMING voltage is slightly higher than the RUNNING voltage.
Grade:
SAT UNSAT Page 14 of 22
VERIFICATION OF JPM COMPLETION STEP 19 X
Performance Step: WHEN the synchroscope is rotating slowly in fast direction AND is at five minutes before twelve oclock position, (Step 4.12.1.9 CLOSE DGB*34D-2, EDG B SPLY.
GRADE X
Standards :
When the synchroscope is at the five minutes to twelve oclock position, rotates the control switch for diesel generator By supply breaker to the close position and observes the indicating lights shift to green OFF, red ON.
Grade:
SAT UNSAT STEP 20 X
GRADE X
STEP 21 GRADE Performance Step: Using the diesel generator B SPEED/LOAD switch, LOAD diesel to a minimum of 200kW as read on KW. (Step 4.12.1.g)
Standards:
Observes the load on the diesel.
Rotates the speed/load switch to the raise/lower positions as necessary to load the diesel to at least 200kW.
Grade:
SAT UNSAT Performance Step: PLACE diesel generator B to bus 34D SYNC SEL switch in OFF. (Step 4.1 2.1.h)
Standards:
Rotates the diesel generator B to bus 34D synchronizing selector switch to the off position.
Grade:
SAT UNSAT Page 15 of 22
VERIFICATION OF JPM COMPLETION STEP 22 Performance Step: COMPLETE After EDG output breaker is closed section of OP 3346A-014. (Step 4.12.3)
GRADE Standards:
Completes that section of OP 3346A-014.
Grade:
SAT UNSAT STEP 23 Performance Step: OBSERVE the following loadlduration limits:
Load Maximum Duration
~ 5 0 0 0 kW 8,760 Hrs.
5000-5335 kW 2000 Hrs.
5335-5500 kW 160 Hrs.
5500-6000 kW 30 min
> 6000 kW Prohibited (Step 4.1 2.4)
GRADE Standards:
The initial conditions stated that the diesel was to be loaded to 4500kW.
Consequently, it may run at this load for a prolonged period of time.
Grade:
SAT UNSAT STEP 24 Performance Step: NOTIFY Engineering Department of any operation with load greater than 5000kW, including load and duration of operation above 5000kW. (Step 4.12.5)
GRADE Standards:
Since the diesel is only to be loaded to 4500kW, no action is required.
Page 16 of 22
VERIFICATION OF JPM COMPLETION Grade:
SAT UNSAT Page 17 of 22
VERIFICATION OF JPM COMPLETION STEP 25 X
Performance Step: Using ADJUST load as required using one of the following:
SPEED/LOAD (MB8)
. GOVERNOR CONTROL (Step 4.12.6)
(3EGS*PNLB)
GRADE X
Stand a rds :
Rotates the SPEED/LOAD switch in the raise/lower directions as necessary to increase load. Observes a loading limit to fully load the EDG over -20 minutes Consequently, picks up approximately 200-25OW per minute.
Total time to reach 4500KW should be approximately 20 minutes based in initial KW load.
Grade:
SAT UNSAT STEP 26 Performance Step:
None GRADE Standards:
Applicant should observe real load (kW) increasing uncontrollably.
Grade:
SAT UNSAT Page 18 of 22
STEP 27 GRADE STEP 28 GRADE STEP 29 VERIFICATION OF JPM COMPLETION Performance Step: IF emergency diesel generator B is paralled to grid, PLACE SPEED/LOAD switch in I LOWER and REDUCE emergency diesel generator B load to less than 5,335 KW.
(OP 3353.MB8B 3-13, Step I)
Standards:
Applicant takes the SPEED/LOAD switch to LOWER. Observes that this has no effect.
Grade:
SAT UNSAT X
Performance Step: IF emergency diesel generator B is single power source to emergency bus, REQUEST Control Room Operator STOP unnecessary loads to REDUCE emergency diesel generator B load to less than 5,335 KW.
(OP 3353.MB8B 3-13, Step 2)
Standards:
Applicant recognizes that this step is not applicable.
Grade:
SAT UNSAT Performance Step: ACKNOWLEDGE local alarm to enable Control Room reflash ca pa bi I ity.
GRADE Grade:
(OP 3353.MB8B 3-13, Step 3)
Standards:
Applicant acknowledges alarms if necessary.
SAT UNSAT Page I 9 of 22
STEP 30 VERIFICATION OF JPM COMPLETION Performance Step: DETERMINE cause of emergency generator B overload by checking alarms at MB8 and 3EGS*PNLB.
GRADE Grade:
STEP 31 GRADE X
(OP 3353.MB8B 3-1 3, Step 4)
Standards:
Applicant reviews MB8 and calls PEO to report conditions at 3EGSPNLB.
SAT UNSAT Performance Step:
Trip the Emergency Diesel Generator Standards:
Applicant determines that a trip is necessary to protect the EDG from unnecessary overload and presses the EMERGENCY STOP PUSHBUTTON.
Failure criteria: 2 minutes after reaching 6,000 kW and the Applicant has not tripped the EDG.
Grade:
SAT UNSAT Terminating Cue: When the Applicant has tripped the EDG, tell the Applicant The evaluation for this JPM is complete. Thank you.
Stop Time:
Page 20 of 22
VERIFICATION OF JPM COMPLETION Appendix C3 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiner's signature and date:
Page21 of22
STUDENT HANDOUT JPM Number:
NRC Simulator JPM S.6 Initial Conditions:
The plant is in a normal electric plant lineup with both EDGs ready for automatic loading. The Outside Rounds PEO has been sent to the B EDG enclosure and completed the preliminary checks for starting the B EDG. The prestart portions of the EDG Data Sheet (OP 3346A-013) and EDG B Operating Log (OP 3346A-015) have been completed. The SBO diesel is not running.
The other RO will be filling out the Ops forms.
Initiating Cues:
The US has directed you to conduct a start of the B EDG from MB8 using OP 3346A, Section 4.4 starting with step 4.4.4. The EDG is to be paralleled to the bus and loaded to 4500KW.
Page 22 of 22
Job Performance Measure NRC Simulator JPM S.7 Page 1 of 9
- 1.
Title:
Respond to Main Steam Pressure Transmitter MSS-PT20D Failure to loo%,
Causing SG Atmospheric Relief Valve MSS-PV20 to. Open (OP3353.MB5C 5-7).
JPM ID Number:
NRC Simulator S.7 Revision:
0 II. Initiated:
Nuclear Reaulatorv Commission Developer I I I. Reviewed:
Technical Reviewer IV. Approved:
Cognizant Plant Supervisor (optional)
Nuclear Training Supervisor 25 May 2004 Date Date Date Date Page 2 of 9
SUMMARY
OF CHANGES I Change I Description I Date I
Page 3 of 9
Job Performance Measure Facility:
Millstone Unit 3 Student:
JPM ID Number: NRC Simulator S.7 Revision:
0 Task
Title:
Respond to Main Steam Pressure Transmitter. MSS-PT20D Failure to 1 OO%,
Causing SG Atmospheric Relief Valve MSS-PV20 to Open (OP3353.MB5C 5-7).
System:
041, Main Steam Time Critical Task:
(
) YES
( X ) NO Validated Time (minutes): 15 Task Number(s):
Applicable To:
SRO X
RO X
PEO WA Number:
041 A4.06 K/A Rating: 3.1 / 2.9 Ability to manually operate and/or monitor in the control room: Atmospheric relief valve controllers Method of Testing:
Simulated Performance:
Act u a I Performance:
X Location:
Classroom:
Simulator:
X In-Plant::
Task Standards:
0 Applicant closes isolation valve 3MSS*MOV18D 0
Applicant recognizes both instrument failure and component failure.
Required Materials:
None General
References:
OP 3353.MB5C 5-7, MAIN STEAM RELIEF W NOT CLOSED AOP 3571, Instrument Failure Response.
Page 4 of 9
Job Performance Measure Initial Conditions:
Initiating Cue:
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
The plant is steady state at 100% power with no equipment out of service.
You are to respond to the simulator just as you would respond to the actual plant.
Do you have any questions?
Are you ready to begin?
You have the shift.
- NOTES TO EVALUATOR ****
- 1.
Critical steps for this JPM are indicated by an unshaded box after the step. For the student to achieve a satisfactory grade, &LJ critical steps must be completed correctly.
The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.
- 2.
When the student states what hidher simulated action/observation would be, read the appropriate Cue.
- 3.
If necessary, question the student for details of simulated actions/observations (Le. What are you looking at? or What are you observing?).
Page 5 of 9
Simulator Setup IC-I 8 0
RCS Tave = 587°F 0
PZR Pressure = 2235 psig 0
Reactor Power = 100%
I Examiner Cue:
Simulator Instruction:
Page 6 of 9 You have the Shift At t z 45 seconds, insert malfunction MSI 1 D, Severity = 100%.
At t z 50 seconds, insert malfunction MSOSD, Severity = 100%
OP 3353.MB5C 5-7 Response Applicant checks S/G pressures for proper operation of Main Steam Pressure Relief Valve. Observes that 3MSS-PIC20D is pegged high.
- 1.
AOP 3571 Response
- 2.
pressure controller has failed, Determine the Initiating Parameter and Place the Affected Controller in MANUAL.
PLACE controller in MAN and CLOSE the Valve (Step 1)
- 3.
relief valve does nof close, CLOSE the following isolation valves (MB5):
Stabilize the Plant Parameters (Step 2) 3MSS*MOVl8D
- 5.
- 6.
- 7.
SRO Applicant refers to Technical Specifications and enters LCO Action 3.7.1.6.a.
problem, Go To AOP 3571.
NOTE TO.EXAMINER:
Applicant should state or otherwise indicate recognition of LCO requirement.
Defeat the failed instrument input by placing the affected SG atmospheric relief valve controller in MANUAL and Close the valve. (Step 1.1)
When conditions have stabilized, Observe MB annunciators and parameters and immediately report any unexpected or unexplained conditions to the Shift failure is due to an instrument
- 8.
Manager. (Step 1.2)
NOTE Stop Time:
- denotes critical step.
- 9.
Page 7 of 9 There are no Technical Specifications or bistables associated with this instrument.
(precedes Step 1.3)
Request I&C Department perform Applicant should state or corrective maintenance on failed otherwise demonstrate request for instrument. (Step 1.3)
I&C action..
NOTE TO EXAMINER:
Job Performance Measure Appendix C3 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Result: SAT or UNSAT Examiner's signature and date:
Page 8 of 9
Job Performance Measure Student Handout JOB PERFORMANCE MEASURE INSTRUCTION SHEET DIRECTIONS TO STUDENT YOU ARE TO OPERATE AND RESPOND TO THE SIMULATOR JUST AS YOU WOULD IN THE ACTUAL PLANT.
Initial Conditions THE PLANT IS STEADY STATE AT 100% POWER WITH NO EQUIPMENT OUT OF SERVICE. YOU ARE TO MAINTAIN 100% POWER.
Page 9 of 9
Job Performance Measure Page 1 of 23 NRC Simulator JPM S.8
Job Performance Measure Page 2 of 23 I. JPM
Title:
Swap RPCCW Train B to Train C JPM ID Number:
Simulator S.8
- 11.
Initiated:
Nuclear Regulatory Commission Developer I I I. Reviewed:
Technical Reviewer IV. Approved:
Cognizant Plant Supervisor (optional)
Nuclear Training Supervisor Revision :
0 23June2004 Date Date Date Date
-~
Job Performance Measure Page 3 of 23 Change
SUMMARY
OF CHANGES Description Date
~~
I I
I I
I I
I
Job Performance Measure Page 4 of 23 Facility:
Millstone Unit 3 Student:
JPM ID Number: Simulator S.8 Revision:
0 Task
Title:
Swap RPCCW Train B to Train C System:
n/a Alternate Path?
Yes Time Critical Task:
( X
) YES
(
) NO Validated Time (minutes):
Task Number(s):
Applicable To:
SRO X
RO X
PEO WA Number:
008.A4. I O WA Rating: 3.1 / 3.1 Ability to operate and/or monitor in the control room: Conditions that require the operation of two CCW coolers.
Method of Testinn:
Simulated Performance:
Actual Performance:
X Location:
Classroom:
Si mu lator:
X I n-Plant: :
Task Standards:
0 Applicant swaps from RPCCW Train B to Train C 0 Applicant recognizes need to swap back to Train B Applicant successfully swaps back to Train B Required OP 3330A, Reactor Plant Component Cooling Water Materials:
OP 3353.MBlC 4-6, RPCCW HX OUT TEMP HVLO General OP 3330A, Reactor Plant Component Cooling Water
References:
OP 3353.MBl C 4-6, RPCCW HX OUT TEMP HVLO
Job Performance Measure Page 5 of 23 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating-cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
Initial Conditions:
You are to oDerate and respond to the simulator just as you would in the actual plant.
You are a Control Room Operator at Millstone Generating Station, Unit 3.
The plant is steady state at 100% power. No equipment is out of service.
The Unit Supervisor has directed you to swap from RPCCW Train B to RPCCW Train C. Train B is to be taken out of service for planned maintenance.
Do you have any questions?
Are you ready to begin?
Initiating Cue:
Here are copies of OP 3330A and OP 3326. You have the shift.
- NOTES TO EVALUATOR****
- 1.
Critical steps for this JPM are indicated by an asterisk and bolding. For the student to achieve a satisfactory grade, students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.
critical steps must be completed correctly. The
- 2.
When the student states what his/her simulated action/observation would be, read the appropriate Cue.
- 3.
If necessary, question the student for details of simulated actions/observations (i.e. What are you looking at? or What are you observing?).
Job Performance Measure Page 6 of 23 Start Time:
IC-I 8 0
RCS Tave = 587°F Simulator 0
PZR Pressure = 2235 psig Setup 0
Reactor Power = 100%
Insert Malfunction SWO7C. Severitv = 100%.
Exa Exa -
- 1.
- 2.
- 4.
- 1. Train A and Train B RPCCW containment supply and return headers should be cross-connected during all RPCCW shifting evolutions to ensure adequate cooling water supply to reactor coolant pump lube coolers.
- 2. To prevent siphoning, hose directed to collection barrel should not be submerged.
(CAUTION preceding 3330A Step 4.6.1)
Refer To OP 3326, "Service Water System," and REVIEW precaution regarding train and heat exchanger alignment to avoid violating Service Water System and pump minimum Dr maximum flow conditions.
(3330A Step 4.6.1 )
IF in MODE 1, 2, or 3, Refer To TRM-7.4.1, "Fire Related Safe Shutdown Components," and REVIEW the required ACTION statement.
13330A SteD 4.6.21 Here are copies of OP 3330A and OP 332 You have the shift.
Applicant reads the CAUTION Applicant refers to OP 3326, Precaution 3.8, and determines that the swap can be accomplished without violating SW flow requirements.
- 5.
- 6.
- 7.
- 8.
ATTACH hose to 3SWP*V213, RPCCW heat exchanger B service water outlet vent, and DIRECT to a collection barrel in preparation for venting reactor plant component cooling water heat exchanger B.
(3330A Step 4.6.3)
Refer To Section 4.1 0 and VERIFY RPCCW pump C and heat exchanger are aligned to Train B RPCCW System.
(3330A Step 4.6.4)
To prepare RPCCW heat exchanger C for service, CLOSE the following valves:
0 3SWP*V211, RPCCW heat exchanger C inlet service water vent exchanger C outlet service water vent 3SWP*V214, RPCCW heat (3330A SteD 4.6.5)
- 1. A total RPCCW train flow of greater than 5,100 gpm is desirable to prevent a pressure transient due to pump shifting, thus reducing the chance of lifting a pressure relief.
- 2. The following step initiates flow through the idle Train B Spent Fuel Pool Cooling System heat exchanger.
(NOTE preceding 3330A Step 4.6.6)
Page 7 of 23 Applicant calls PEO and directs closing of 3SWP*V211 and V214.
Booth Operator: Close and Report that 3s WP*V21 I and 3SWP*VZ14 are closed.
Applicant reads the NOTE.
- 9.
I O.
- 11.
IF total train B RPCCW flow is less than 5,100 gpm as indicated by computer point CVCCPTRB, PERFORM the following, as necessary:
0 ADJUST 3CCP*V1 14, fuel pool cooler B RPCCW outlet, to obtain 1,700 to 1,900 gpm as indicated on 3CCP-FlS255B 0 ADJUST 3CCP*FCV66B, RHR heat exchanger B cooling outlet isolation, to obtain greater than 5,100 gpm configuration and ESTABLISH greater than 5,100 gpm 0 EVALUATE RPCCW System (3330A Step 4.6.6)
To cross-connect the RPCCW System containment headers, PERFORM the following:
- a. OPEN the following valves (MBI):
0 3CCP*AOVl79A, HDR DIV 0
3CCP*AOV180A, HDR DIV 0 3CCP*A0V179By HDR DIV 0 3CCP*AOV180B, HDR DIV TR A TR A TR B TR B
- b. CLOSE the following valves (MBI):
- 1) 3CCP*MOV45B, CTMT ISOL
- 2) 3CCP*MOV48B, CTMT ISOL
OPEN 3SWP*V38, RPCCW heat exchanger C service water inlet.
13330A Step 4.6.8)
Page 8 of 23 Total flow is expected to be greater than 5,100 gpm.
Applicant OPENS 3CCP*AOVI 79A, 180A, 179B and 180B in any order.
Applicant closes 3CCP*MOV45B, 486 and 49B in the specified order.
Applicant directs PEO to OPEN 3SWP*V38 Booth Operator: Open and Report that 3SWP*V38 is OPEN m
0 0
I I
Job Performance Measure Page 9 of 23
- 12.
- 13.
- 14.
- 15.
When the heat exchanger shift has been completed, 3SWP*V39, RPCCW heat exchanger C service water outlet valve, should be fully open.
(NOTE preceding 3330A Step 4.6.9)
WHEN shifting heat exchanger, HX" (MBI), and ENSURE service water flow does not drop below 6,000 gpm or rise above 10,000 MONITOR 3SWP-FI 43B, "RPCCW (3330A Step 4.6.9)
To shift RPCCW heat exchangers, simultaneously PERFORM the following:
Slowly OPEN 3SWP*V39, RPCCW heat exchanger C service water outlet Slowly CLOSE 3SWP*V67, RPCCW heat exchanger B service water outlet (3330A Step 4.6.1 0)
Pressure transient from the pump shift may cause relief valves to lift and then the reliefs may fail to reseat. This could overfill radwaste tanks.
(CAUTION preceding 3330A Step 4.6.1 1)
Applicant reads NOTE Applicant reads step and identifies 3SWP-FI 43B.
Applicant directs PEO to slowly OPEN 3SWP*V39 while simultaneously and slowly CLOSING 3SWP*V67.
Booth Operator: Reposition Valves and Report that 3SWP*V39 is OPEN and 3SWP*V67 is CLOSED Need simulator codes for this Applicant reads CAUTION.
Job Performance Measure Page 10 of 23
- 16.
- 17.
- 18.
- 19. -
- 20.
PERFORM the followhg (MBI ):
- a. PLACE and HOLD 3CCP*P1 Cy "PP C" (Train B) control sitch in "START," then STOP 3CCP*P1 B, "PP B."
- b. WHEN 3CCP*PIC, "PP C,"
indicates started, RELEASE CCP*Pl C, "PP C" control switch.
(3330A Step 4.6.1 1)
VERIFY pump discharge pressure on 3CCP-PI 29C, "PP DIS PRES" (MBI).
(3330A Step 4.6.1 2)
WHEN 15 seconds have elapsed, if pump discharge pressure is not indicated on 3CCP-PI 29C, "PP DIS PRES" (MBI), PERFORM the following:
- a. STOP CCP*PlC, "PP C" (Train B) (MBI).
- b. Refer To step 4.4.7 and VENT the RPCCW System.
(3330A Ster, 4.6.1 3)
PLACE 3CCP*P1 B, "PP B" in PTL.
(3330A Step 4.6.14)
- 1. Do not perform operations which results in a change in CCP System temperature when monitoring RPCCW for indications of leakage.
- 2. When CCP leak trending is in progress, RPCCW surge tank level and 3CCP-LV20, CCP makeup valve, position (MBI) should be monitored for immediate indication of increased leakage.
'NOTE i
preceding 3330A Step 4.6.1 5)
Applicants starts 3CCP*P1 C and stops 3CCP*PI B.
Applicant verifies that pump discharge pressure is approximately at its pre-swap value and steady.
Applicant waits 15 seconds and observes that 3CCP*P1 C discharge pressure is indicated on 3CCP-PI 29C.
Applicant places 3CCP*P1 B in pull-to-lock Applicant reads NOTE.
Job Performance Measure Page I I of 23
- 21.
- 22.
- 23.
INITIATE a trend of CCP leakage for the next two hours by MONITORING CCP-L2OA and CCP-L20B on the plant computer as follows:
0 PRESS, PLANT SENSORS 0
PRESS,F5 PRESS, F6 (CCP LEVEL) 0 PRESS, F3 (I min. trend)
(3330A Step 4.6.15)
Due to heat up or tube leakage, heat exchanger may rapidly pressurize. The heat exchanger should be vented after isolation.
(CAUTION preceding 3330A Step 4.6.16)
To isolate and depressurize RPCCW B heat exchanger service water side, PERFORM the following:
CLOSE 3SWP*V66, RPCCW heat exchanger B service water inlet.
OPEN 3SWP*V213, RPCCW heat exchanger B service water outlet vent.
(3330A Ster, 4.6.1 6)
Applicant initiates trending on PPC Applicant reads CAI TlON Applicant directs PEO to CLOSE 3SWP*V66 and OPEN 3SWP*V213 Booth Operator: Reposition Valves and Report that 3s WP*V66 is CLOSED and 3SWP*V273 is OPEN (XJ 0
0
-I I
Job Performance Measure Page 12 of 23
- 24.
- 25.
26
- 27.
containment headers, PERFORM the following:
- a. OPEN the following valves (MBI):
I) 3CCP*MOV49B, CTMT
- 2) 3CCP*MOV48B, CTMT
- 3) 3CCP*MOV45B, CTMT
- 1) 3CCP*AOV179A, HDR DIV
- 2) 3CCP*AOV180A, HDR DIV
- 3) 3CCP*AOV179B, HDR DIV
IF CCP leakage trend increases, DISPATCH Operators to the CCP relief valves listed in the following to check for lifting:, RPCCW Relief Valve List - Train A, RPCCW Relief Valve List - Train B (3330A Step 4.6.1 8)
IF 3SFC*E1 B is not aligned to cool Lhe spent fuel pool, CLOSE 3CCP*V114, fuel pool cooler B 2PCCW outlet.
- 3330A Step 4.6.1 9)
F 3CCP*FCV66B7 RHR heat 3xchanger B cooling outlet solation, was throttled, RESTORE
- o initial position.
3330A Step 4.6.20)
Applicant OPENS 3CCP*MOV49B, 48B and 458 in the specified order.
Applicant closes 3CCP*AOV179A7 180A, 179B and 180B in any order.
There will be no leakage trend. Applicant may be responding to high temperatures by now. If so, GO TO step 29 below.
???
Job Performance Measure Refer To OP 3326, "Service Water System," and PLACE RPCCW heat exchanger B service water side into fresh water layup.
(3330A Step 4.6.21)
CHECK the following "RPCCW "HX OUT TEMP" to confirm alarm, (MBI):
3CCP-TI 34A 3CCP-TI 34B 3CCP-TI34C (3353.MBl C. Step 11 IF alarm is due to loss of service-water, Go To AOP 3560, "Loss of Service Water."
(3353.MBIC. SteD 2)
IF RPCCW temperature has been purposely lowered to maintain VCT outlet temperature less than 11 5"F, Go To procedure in effect.
(3353.MBl C, Step 3)
For a Safety Grade Shutdown, RPCCW heat exchanger outlet temperature may increase to 113" F (NOTE preceding 3353.MB1 C, Step 4)
IF RHR cooldown is in progress, REMOVE RPCCW loads or REDUCE RCS cooldown rate as necessary to reduce RHR heat exchanger RPCC W outlet temperature to less than or equal to the following:
m For a normal cooldown - 130°F.
m For a Safety Grade Cold Shutdown - 140°F.
- 3353.MB1 C, Step 4)
Page 13 of 23 When the high temperature alarm energizes, the Applicant will refer to 3353.MBl C 4-6 for direction.
Applicant should read 3CCP-TI 34C Alarm is NOT due to loss of Service Water.
A Safety Grade Shutdown is NOT in progress.
RHR cooldown is NOT in progress.
Job Performance Measure Page 14 of 23 (3353.MB1CY Step 6)
IF RPCCW outlet temperature continues to increase, Refer To OP 3330A, Reactor Plant Component Cooling Water, and SHIFT RPCCW pumps and heat exc h a ngers.
- 34.
skip this step.
Applicant goes to OP 3330A, Section 4.8.
- 35.
- 36.
- 37.
- 38.
outlet TCV controller setpoint between 82°F and 88°F on the affected controllers:
3CCP-TIC32A 3CCP-TIC32B 3CCP-TIC32C (3353.MBl C. SteD 5)
IF temperature controller will not maintain RPCCW temperature in automatic, PLACE the affected controller in manual and adjust to maintain RPCCW outlet temperature.
Applicant verifies that 3CCP-T132C controller is between 82°F and 88°F.
NOTE: Applicant may recognize that the output signal is at its maximum value without affecting HX outlet temperature and skip the next step.
1 Applicant takes temperature controller to HAND and attempts to lower RPCCW Hx Cy outlet temperature.
Train A and Train B RPCCW containment supply and return headers should be cross-connected during all RPCCW shifting evolutions to ensure adequate cooling water supply to reactor coolant pump lube oil coolers.
Applicant reads the CAUTION (CAUTION preceding 3330A, Step 4.8.1)
This section assumes the RPCCW System and Service Water System are operating in a normal mode with all design features operational.
(NOTE preceding 3330A, Step 4.8.1)
Applicant reads the NOTE
Job Performance Measure Page I 5 of 23
- 39.
- 40.
- 41.
- 42.
Refer To OP 3326, Service Water System, and REVIEW precaution regarding train and heat exchanger alignment to avoid violating Service Water System and pump minimum or maximum flow conditions.
(3330A, Step 4.8.1 )
ATTACH hose to 3SWP*V214, RPCCW heat exchanger C service water outlet vent, and DIRECT to a collection barrel in preparation for venting reactor plant component cooling water heat exchanger C.
(3330A. Ster, 4.8.2)
CHECK the following valves open:
3CCP*V6, RPCCW pump B 0
3CCP*V91, RPCCW pump B discharge valve suction valve (3330A. Ster, 4.8.31 To prepare RPCCW heat exchanger B for service, CLOSE the following valves:
3SWP*V210, RPCCW heat exchanger B inlet service water vent exchanger B outlet service water vent 3SWP*V213, RPCCW heat (3330A, Step 4.8.4)
Applicant may or may re-verify this.
Applicant directs PEO to attach hose to 3SWP*V214 (may direct him to move the hose from HX B to Cy)
Applicant directs PEO to check 3CCP*V6 andV91 OPEN.
Booth Operator. Open and Report that 3CCP*V6 and V91 are OPEN Applicant calls PEO and directs closing of 3SWP*V211 and V214.
Booth Operator: Close and Report that 3SWP*V210 and 3SWP*V273 are closed.
m 0
0
-I I
m 0
0
-I I
Job Performance Measure Page 16 of 23
- 43.
- 44.
greater than 5,100 gpm is desirable to prevent a pressure transient due to pump shifting, thus reducing the chance of lifting a pressure relief.
- 2. The following step initiates flow through the idle Train B Spent Fuel Pool Cooling System heat exchanger.
(NOTE preceding 3330A, Step 4.8.5)
IF total train B RPCCW flow is less than 5,100 gpm as indicated by computer point CVCCPTRB, PERFORM the following:
ADJUST 3CCP*Vll4, fuel pool cooler B RPCCW outlet, to obtain 1,700 to 1,900 gpm as indicated on 3CCP-FIS255B EVALUATE RPCCW System configuration and establish greater than 5,100 gpm (3330A. Step 4.8.5)
Applicant reads NOTE
???
Job Performance Measure Page I 7 of 23
- 15.
- 16.
- 17.
- 18.
To cross-connect the RPCCW System containment headers, PERFORM the following:
- a. OPEN the following containment cross connect valves:
0 3CCP*AOV179A, HDR DIV 0
3CCP*AOV180A, HDR DIV 0
3CCP*AOV179B, HDR DIV 0
3CCP*AOV180B, HDR DIV TR A TR A TR B TR B
- b. CLOSE the following Train B containment isolation valves:
I) 3CCP*MOV45Bl CTMT
- 2) 3CCP*MOV48Bl CTMT
OPEN 3SWP*V66, RPCCW heat exchanger B service water inlet.
(3330A, Step 4.8.7)
When the heat exchanger shift has been completed 3SWP*V67, RPCCW heat exchanger B service water outlet valve, should be fully open.
(NOTE preceding 3330A, Step 4.8.8)
WHEN shifting heat exchangers, HX (MBI), and ENSURE service water flow does not drop below 6,000 gpm or rise above 10,000 gpm.
MONITOR 3SWP-FI 43B, RPCCW (3330A, Step 4.8.8)
Applicant OPENS 3CCP*AOVl79A, 180A, 179Bl and 180B in any order.
Applicant closes 3CCP*MOV45B, 48B, 498 in the specified order.
Applicant directs PEO to OPEN 3SWP*V66 Booth Operator: Open and Report that 3s WP*V66 is OPEN Applicant reads NOTE Applicant reads STEP m
0 0
4 I
- 49.
- 50.
- 51.
- 52.
- 53.
To shift RPCCW heat exchangers, simultaneously PERFORM the following:
0 Slowly OPEN 3SWP*V67, RPCCW heat exchanger B service water outlet valve 0 Slowly CLOSE 3SWP*V39, RPCCW heat exchanger C service water outlet valve f3330A. SteD 4.8.9)
Pressure transient from the pump shift may cause relief valves to lift and then the reliefs may fail to reseat. This could overfill radwaste tanks.
(CAUTION preceding 3330A, Step 4.8.1 0)
To shift RPCCW pumps, PERFORM the following (MBI):
- a. PLACE and HOLD 3CCP*PlB, "PP B" control switch in
'START," then STOP 3CCP*P1 C, "PP C" (Train B).
- b. WHEN 3CCP*P1 B, "PP B" indicates started, RELEASE 3CCP*P1 B, "PP B," control switch.
f3330A. SteD 4.8.1 0)
VERIFY pump discharge pressure on 3CCP-PI 29B, "PP DIS PRES" (MBI).
(3330A. SteD 4.8.1 1)
WHEN 15 seconds have elapsed, if pump discharge pressure is not indicated on 3CCP-PI 29B, "PP DIS PRES" (MBI), PERFORM the following:
- a. STOP CCP*PIB, "PP B" (MBI).
- b. Refer To step 4.2.7 and VENT the RPCCW System.
Page 18 of 23 Applicant directs PEO to slowly OPEN 3SWP*V69 while simultaneously and slowly CLOSING 3SWP*V39.
Booth Operator: Reposition Valves and Reporf that 3s WP*V39 is OPEN and 3SWP*V67 is CLOSED Need simulator codes for this Applicant reads CAUTION Applicant starts 3CCP*P1 B and stops 3CCP*Pl c.
Applicant verifies that pump discharge pressure is approximately at its pre-swap value and steady.
Applicant waits 15 seconds and observes that 3CCP*Pl B discharge pressure is indicated on 3CCP-PI 29B.
- 54.
- 55.
- 56.
- 57.
- 1. Do not perform operations which results in a change in CCP System temperature when monitoring RPCCW for indications of leakage.
- 2. When CCP leak trending is in progress, RPCCW surge tank level and 3CCP-LV20, CCP makeup valve, position (MBI) should be monitored for immediate indication of increased leakage.
(NOTE preceding 3330A, Step 4.8.1 3)
INITIATE a trend of CCP leakage over the next two hours by MONITORING CCP-L20A and CCP-L20B on the plant computer as follows:
0 PRESS, PLANT SENSORS PRESS,F5 0
PRESS, F6 (CCP LEVEL) 0 PRESS, F3 (1 min. trend)
(3330A, Step 4.8.13)
Due to heat up or tube leakage, heat exchanger may rapidly pressurize. The heat exchanger should be vented after isolation.
(CAUTION preceding 3330A, Step 4.8.14)
To isolate and depressurize RPCCW C heat exchanger service water side, PERFORM the following:
CLOSE 3SWP*V38, RPCCW heat exchanger C service water inlet.
OPEN 3SWP*V214, RPCCW heat exchanger C service water outlet vent.
(3330A, Step 4.8.14)
Page 19 of 23 Applicant places 3CCP*P1 C in pull-to-lock Applicant initiates trend on PPC Applicant reads CAUTION Applicant directs PEO to CLOSE 3SWP*V38 and OPEN 3SWP*V214 Booth Operator: Reposition Valves and Report that 3s WP*V38 is CLOSED and 3SWP*V244 is OPEN a
0 0
I I
- 58.
- 59.
- 60.
- 31.
To split RPCCW A and B System containment headers, PERFORM the following (MBI):
- a. OPEN the following containment
- 1) 3CCP*MOV49B, "CTMT
- 2) 3CCP*MOV48B, "CTMT
- 3) 3CCP*MOV45B, "CTMT isolation valves:
ISOL TR B" ISOL TR B" ISOL TR B"
- b. CLOSE the following containment cross connect valves:
3CCP*AOV179A, "HDR DIV 3CCP*AOV180A, "HDR DIV 3CCP*AOVl79B, "HDR DIV 3CCP*AOVI80B, "HDR DIV TR A" TR A" TR B" TR B" (3330A, SteD 4.8.1 5)
IF CCP leakage trend increases, DISPATCH Operators to the CCP relief valves listed in the following to check for lifting:, "RPCCW Relief Valve List - Train A", "RPCCW Relief Valve List - Train B" (3330A, Step 4.8.1 6)
IF 3SFC*E1 B is not aligned to cool ihe spent fuel pool, CLOSE 3CCP*V114, fuel pool cooler B 3PCCW outlet.
13330A. SteD 4.8.17) 3efer To OP 3326, "Service Water System," and PLACE RPCCW heat 2xchanger C service water side into
'resh water layup.
'3330A, Step 4.8.1 8)
Page 20 of 23 Applicant OPENS 3CCP*MOV49B, 48B and 458 in the specified order.
Applicant closes 3CCP*AOV179A, 180A, 179B and 180B in any order.
There will be no leakage trend. Applicant may be responding to high temperatures by now. If so, GO TO step 29 below.
???
Job Performance Measure Page 21 of 23 Stop Time:
- denotes critical step
Job Performance Measure Appendix C3 Page 22 of 23 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Response
Result: SAT or UNSAT Examiner's signature and date:
Job Performance Measure Student Handout Page 23 of 23 JOB PERFORMANCE MEASURE INSTRUCTION SHEET DIRECTIONS TO STUDENT YOU ARE TO OPERATE AND RESPOND TO THE SIMULATOR JUST AS YOU WOULD IN THE ACTUAL PLANT.
Initial Conditions You are a Control Room Operator at Millstone Generating Station, Unit 3. The plant is steady state at 100% power. No equipment is out of service. The Unit Supervisor has directed you to swap from RPCCW Train B to RPCCW Train C. Train B is to be taken out of service for planned maintenance.
JOB PERFORMANCE MEASURE APPROVAL SHEET NRC Simulator JPM S.9 Page I of 18
JOB PERFORMANCE MEASURE APPROVAL SHEET I.
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-REl3) ALARM NRC Simulator JPM S. 9 (Spare)
JPM ID Number:
03 1 Revision:
6 chg 1 II. Initiated:
G. A. Tait Developer 111.
Reviewed:
J. Deveau Technical Reviewer IV. Approved:
NA Cognizant Plant Supervisor (optional)
R. Lueneburg Nuclear Training Supervisor 6/8/99 Date 6/30/99 Date Date 6/30/99 Date Page 2 of 18
JOB PERFORMANCE MEASURE APPROVAL SHEET Rev 6, Change 1 Added information to support OP 3314A Rev 22 Change 1 Non-Intent Change
SUMMARY
OF CHANGES 57, 11 RevisiodChange Change Information Affected Pages Page 3 of 18
JOB PERFORMANCE MEASURE GUIDE Facility:
Millstone Unit 3 Student:
NRC Simulator JPM S.9 (Spare)
JPM ID Number:
031 Revision:
6 chg I Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-RE13) ALARM System:
HVR Time Critical Task:
(
) YES
( X ) NO Validated Time (minutes):
20 Task Number(s):
088-01-220 Applicable To:
SRO X
RO X
PEO WA Number:
060AA1.02 WA Rating:
2.9 / 3.1 Ability to operate and / or monitor the following as they apply to the Accidental Gaseous Radwaste: Ventilation system.
Method of TestinQ:
Simulated Performance:
Act u a I Performance:
X Location:
Classroom:
Simulator:
X In-Plant::
Task Standards:
Satisfactorily complete placing the upper levels of the Auxiliary Building on filtered exhaust in accordance with OP 3314A, Auxiliary Building Heating, Ventilation and Air Conditioning Required Materials:
None.
General
References:
OP 3314A, Auxiliary Building Heating, Ventilation and Air Conditioning, Revision 022-01
- READ TO THE STUDENT*
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective(s) for this JPM will be satisfied. You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution were actually being performed.
Page 4 of 18
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:
031 Revision:
6 chg I Simulator Requirements:
Approximate setup time is 5 minutes.
- 1.
- 2.
- 3.
- 4.
Reset to IC-20, 100% steady state, EOL.
Place the simulator in RUN.
Insert malfunction CVO9 at 50% severity, I00 gpm leak in VCT.
Insert malfunction CVI OB at 0% severity, LT185 fails to 0%
(indicates a VCT level transmitter line leak). This will cause annunciator MB3A 4-1 0, VCT level Hi/Lo, to come in.
After approximately 2 minutes, 3HVR-RE13 will reach the alarm setpoint and annunciators MB2B 2-8 and MB2B 3-9 will come in. Place the simulator in Freeze.
After the examinee has received the intial conditions and initiating cues, place the simulator in RUN.
- 5.
- 6.
Initial Conditions:
A leak on CHS*LTI 85 level transmitter line for the VCT has resulted in radiation monitor HVR-RE13 going into an alarm status. The control room team is carrying out the actions of AOP 3573, Radiation Monitor Alarm Response. One train of charging and RPCCW pump area ventilation is in service. The Waste Disposal Building ventilation and CTMT purge are not aligned to the AUX. Bldg. filters. General area ventilation is in service.
Initiating Cues:
In carrying out the responses of AOP 3573, Radiation Monitor Alarm Response, the US has directed you to place the upper levels of the Aux. Bldg. on Train A filtered exhaust per OP 3314A, Section 4.2.
- NOTES TO EVALUATOR****
I. Critical steps for this JPM are indicated by an X after the step number. For the student to achieve a satisfactory grade, The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.
critical steps must be completed correctly.
- 2.
When the student states what hidher simulated action/observation would be, read the appropriate Cue.
- 3.
If necessary, question the student for details of simulated actions/observations (Le. What are you looking at? or What are you observing?).
Page 5 of 18
PERFORMANCE INFORMATION JPM Number:
031 Revision:
6 chg I Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-REI 3) ALARM Start Time:
STEP 1
Performance Step:
CAUTIO N This section supports response to high radiation in the upper levels of the Auxiliary Building (AOP 3573). This section establishes and maintains Auxiliary Building ventilation in the following alignment:
One train of charging and CCP fans in operation 0
3HVR-FN7 discharging to normal exhaust path through 3HVR*AOD4OA and 3HVR*AOD40B Waste Disposal Building ventilation and containment purge are not aligned to the Auxiliary Building filters If it becomes necessary to deviate from this alignment, Auxiliary Building upper level ventilation must be stopped as specified in Section 4.3 (Step 4.2.1 Caution)
GRADE Standards:
- Reviews precaution.
Grade:
SAT UNSAT Page 6 of 18
PERFORMANCE INFORMATION JPM Number:
031 Revision:
6 chg 1 Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG:RAD.
MON. (3HVR-RE13) ALARM STEP 2
Performance Step: CHECK 3HVR*AOD44A and 3HVR*AOD44B, charging and RPCCW pump normal exhaust dampers, open (VPI). (step 4.2.1)
GRADE Standards:
Observes that the indicating lights for 3HVR*AOD44A and 3HVR*AOD44B are green OFF, red ON.
Grade:
SAT UNSAT STEP 3
Performance Step: CHECK 3HVR*FN14A and 3HVR*FN13A 3HVR*FN14B and 3HVR*FN13B, charging and RPCCW pump supply and exhaust fans, one train running (VPI). (step 4.2.2)
GRADE Standards:
Grade:
Observes that the indicating lights are green OFF red ON for 3HVR*FN14A and 3HVR*FNl3A and green ON red OFF for 3HVR*FNl4B and 3HVR*FN13B, the A train fans are running.
SAT UNSAT STEP 4
Performance Step: CHECK 3HVR*FN14A and 3HVR*FNl4B, charging and RPCCW pump supply fans, in AUTO(VP1).
(step 4.2.3)
GRADE Standards :
Grade:
Observes that the SPLY FAN?VEN DMPRS control switches for 3HVR*FN14A and 3HVR*FN14Bare aligned to the AUTO position.
SAT UNSAT Page 7 of 18
PERFORMANCE INFORMATION JPM Number:
031 Revision:
6 chg 1 Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-RE13) ALARM STEP 5
Performance Step:
GRADE Standards:
Grade:
STEP 6
Performance Step:
GRADE Standards :
Grade:
STEP 7
Performance Step:
GRADE Standards:
IF above lineup not established, Refer Section 4.1 3 and PLACE one train of charging and RPCCW pump area ventilation in service. (step 4.2.4)
Proceeds to step 4.2.5 based upon lineup being verified established by previous procedure steps performed above.
SAT UNSAT VERIFY, Waste Disposal Building ventilation and containment purge, not aligned to Auxiliary Building filters.
0 3HVR*AOD65A, filter sply, closed 0
3HVR*AOD65B, filter sply, closed 0
3HVR*AOD29A, filter sply, closed 0
3HVR*AOD29BY filter sply, closed (step 4.2.5)
This information given as part of the turnover under initial conditions.
SAT UNSAT NOTE This section supports response to high radiation in the upper levels of the Auxiliary Building (AOP 3573).
Therefore, all general area ventilation is left on during the shift in alignment, 3HVR-HVU2B would supply more air than 3HVR-FN7 could exhaust and an unfiltered discharge could occur.
(Step 4.2.6 Note)
Reviews Note.
Page 8 of 18
JPM Number:
031 PERFORMANCE INFORMATION Revision:
6 chg 1 Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-RE13) ALARM Grade:
SAT UNSAT STEP 8
X Performance Step:
general area ventilation is in service, PERFORM the following (VPI ):
- a.
STOP the following AUX BLD G HVU s:
3HVR-HVU2A 3HVR-HVU2B
- b.
STOP the following AUX BLDB EXH FANS]:
3HVR-FNS 3HVR-FN7 (step 4.2.6)
GRADE X
Standards:
GRADE X
Standards:
GRADE X
Standards:
GRADE X
Standards:
Grade:
Com ments:
Page 9 of 18 Rotates control switch for 3HVR-HVU2A to STOP position and observes the indicating lights shift to green ON, red OFF.
Rotates control switch for 3HVR-HVU2B to STOP position and observes the indicating lights shift to green ON, red OFF.
Rotates control switch for 3HVR-FNS to STOP position and observes the indicating lights shift to green ON, red OFF.
Rotates control switch for 3HVR-FN7 to STOP position and observes the indicating lights shift to green ON, red OFF.
SAT UNSAT Operation of 3HVR-HVUZA and
PERFORMANCE IN FORMATION JPM Number:
031 Revision:
6 chg 1 Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-REl3) ALARM 3HVR-HVU2B may be performed in any sequence HOWEVER, BOTH 3HVR-HVU2A and 3HVR-HVU2B must be stopped prior to operation of 3HVR-FN5 or 3HVR-FN7. Operation of 3HVR-FNS, and 3HVR-FN7 may be performed in any sequence.
STEP 9
X Performance Step: To shift Auxiliary Building filters to filtered alignment, PERFORM the following (VPI ):
- a.
PRESS and HOLD FILTER pushbutton for the following dampers :
0 3HVR*AOD39A, normal 0
3HVR*AOD43A,filter supply exhaust damper
- b.
WHEN the following dampers reposition, RELEASE FILTER pushbuttons:
0 3HVR*AOD39A, normal 0
3HVR*AOD43A, filter supply exhaust, closes damper, opens Page 10 of 18
PERFORMANCE INFORMATION JPM Number:
031 Revision:
6 chg I Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-RE13) ALARM C.
PRESS and HOLD FILTER pushbutton for the following dampers:
3HVR*AOD39B, normal 3HVR*AOD43B, filter supply exhaust damper
- d.
WHEN the following dampers reposition, RELEASE FILTER push button 0
3HVR*AOD39B, normal 3HVR*AOD43B, filter supply exhaust, closes damper, opens (step 4.2.7)
GRADE X
Standards:
GRADE X
Standards:
Grade:
Depresses the FILTER pushbutton for filterhormal exhaust dampers 3HVR*AOD39A/43A and holds the button until the indicating lights shift to 3HVR*AOD39A, green ON, red OFF and 3HVR*AOD43A indicating lights shift to green OFF, red ON, THEN releases the pushbutton.
Depresses the FILTER pushbutton for filterhormal exhaust dampers 3HVR*AOD39B/43B and holds the button until the indicating lights shift to 3HVR*AOD39B, green ON, red OFF and 3HVR*AOD43B indicating lights shift to green OFF, red ON, THEN releases the pushbutton.
SAT UNSAT Page 11 of 18
PERFORMANCE INFORMATION JPM Number:
031 Revision:
6 cha 1 Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-REl3) ALARM STEP I O Performance Step: VERIFY the following Auxiliary Building exhaust fan variable inlet vane controllers, in AUTO (VPI) 0 3HVR*PIC194A, AUX BLDG EXH FAN 3HVR*PIC104B, AUX BLDG EXH FAN (step 4.2.8)
GRADE Standards:
GRADE Standards:
Grade:
Verifies indications for 3HVR*PIC104A indicate:.
0 AUTO light ON 0
MANUAL light OFF Verifies indications for 3HVR*PICI 048 indicate:
AUTO light ON MANUAL light OFF SAT UNSAT STEP I 1 Performance Step:
NOTE This section supports response to high radiation in the upper levels of the Auxiliary Building (AOP 3573).
Therefore, all general area ventilation is left on during the shift in alignment, 3HVR-HVU2B would supply more air than 3HVR-FN7 could exhaust and an unfiltered discharge could occur.
(Step 4.2.6 Note)
GRADE Standards:
Grade:
I Reviews Note SAT UNSAT I
Page 12 of 18
PERFORMANCE INFORMATION JPM Number:
031 Revision:
6 chg 1 Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE,TO AUX. BLDG. RAD.
MON. (3HVR-RE13) ALARM STEP 12 X
Performance Step: To start Train A Auxiliary Building filter, PERFORM the following (VPI):
- a.
PLACE 3HVR*FNGA, filter exhaust fan, in START and HOLD.
- b.
WHEN the following occurs, RELEASE 3HVR*FNGA control switch:
0 3HVR*AOD20A, filter 0
3HVR*MOD28A, filter 0
3HVR*FNGA, exhaust fan, 0
Filter bank heater, energizes supply, opens exhaust, opens starts (step 4.2.9)
GRADE X
Standards:
Grade:
Comments:
Rotates and maintains control switch for 3HVR*FN6A to START position until the following indications are observed:
0 3HVR*AOD20A, green light OFF, red light ON 3HVR*MOD28A, green light OFF, red light ON 0
3HVR*FNGA, green I light OFF, red light ON 0
FLTIA HTR green light OFF, red light ON 0
FLT2A HTR green light OFF, red light ON SAT UNSAT The switch must be held for a minimum of five seconds to avoid an AUTO trip of the fan. If the fan trips and the examinee restarts it, the Page 13 of 18
JPM Number:
03 1 PERFORMANCE INFORMATION Revision:
6 chg 1 Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-REI 3) ALARM critical portion of this step is satisfied.
PERFORM the following (VPI):
STEP 13 Performance Step: To start Train B Auxiliary Building filter,
- a.
PLACE 3HVR*FN6BY filter exhaust fan, in START and HOLD.
- b.
WHEN the following occurs, RELEASE 3HVR*FNGB control switch:
0 3HVR*AOD20BY filter 0
3HVR*MOD28B, filter 0
3HVR*FNGB, exhaust fan, 0
Filter bank heater, energizes supply, opens exhaust, opens starts (step 4.2.1 0)
GRADE Standards:
Examinee transitions to step 4.2.1 1 based upon Initiating Cue.
Grade:
SAT UNSAT Com ments:
It may be necessary to remind the examinee that he was directed to start Train A only and therefore step 4.2.1 0 should not be performed.
STEP 14 X
Performance Step: START the following AUX BLDG EHX FANS (VPI) 3HVR-FN5 3HVR-FN7 (step 4.2.1 1)
GRADE X
Standards:
Rotates the control switch for 3HVR-FN5 to START and observes the indicating lights shift to green OFF, red ON.
Page 14 of 18
PERFORMANCE INFORMATION JPM Number:
031 Revision:
6 chg I Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-RE13) ALARM GRADE X
Standards:
STEP 15 X
Grade:
Com men ts :
Performance Step:
GRADE X
Standards:
GRADE X
Standards:
Grade:
Com ments:
Rotates the control switch for 3HVR-FN7 to START and observes the indicating lights shift to green OFF, red ON.
SAT UNSAT 3HVR-FN5 and 3HVR-FN7 may be operated in any desired sequence.
Performance Steps: START the following AUX BLDG HVUs (VPI) 3HVR-HVU2A 3HVR-HVU2B (step 4.2.12)
Rotates the control switch for 3HVR-HVUZA to START and observes the indicating lights shift to green OFF, red ON.
Rotates the control switch for 3HVR-HVU2B to START and observes the indicating lights shift to green OFF, red ON.
SAT UNSAT 3HVR-HVU2A and 3HVR-HVU2B may be operated in any desired sequence.
Page 15 of 18
PERFORMANCE IN FORMATION JPM Number:
031 Revision:
6 chg I Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-REl3) ALARM STEP 16 Performance Step: VERIFY the following annunciators, not lit:
VPIA 1-6, SLCRS/FUEL/AUX BLDG FLTR HTR TROUBLE LOCAL CNTL TR I P/OVE RCU RRE NT TROUBLE BLDG FLTR HTR TROUBLE B LOCAL CNTL AUTO TRIP. OVERCURRENT VPIA 3-6, AUX BLDG VENT FN A VPIA 4-6, AUX BLDG FNA AUTO VP1 B 1-3, RX PLANT VENT PNL VP1 C 1-6, SLCRS/FUEUAUX VP1 C 3-6, AUX BLDG VENT FN VPIC 4-6, AUX BLDG FN B (step 4.2.1 3)
GRADE Standards:
Verifies each of the above listed annunciator windows not lit.
Grade:
SAT UNSAT STEP 17 Performance Step: Notify US that the upper levels of the Auxiliary Building have been placed on filtered exhaust using Train A in accordance with OP 3314A Section 4.2.
GRADE Standards:
Grade:
Informs the US that the upper levels of the Auxiliary Building have been placed on filtered exhaust using Train A in accordance with OP 3314A Section 4.2.
SAT UNSAT Terminating Cue: The evaluation for this JPM is concluded.
Stop Time:
Page 16 of 18
PERFORMANCE INFORMATION JPM Number:
031 Revision:
6 chg I Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-REl3) ALARM Appendix C3 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Response
Result: SAT or UNSAT Examiner's signature and date:
Page 17 of 18
STUDENT HANDOUT JPM Number:
031 Initial Conditions:
A leak on CHS*LT185 level transmitter line for the VCT has resulted in radiation monitor HVR-REI3 going into an alarm status. The control room team is carrying out the actions of AOP 3573, Radiation Monitor Alarm Response. One train of charging and RPCCW pump area ventilation is in service. The Waste Disposal Building ventilation and CTMT purge are not aligned to the AUX. Bldg. filters. General area ventilation is in service.
Initiating Cues:
In carrying out the responses of AOP 3573, Radiation Monitor Alarm Response, the US has directed you to place the upper levels of the Aux. Bldg. on Train A filtered exhaust per OP 3314A, Section 4.2.
Page 18 of 18
Job Performance Measure Guide Page I of IO NRC In-plant JPM L I
Job Performance Measure Guide Page 2 of IO I. JPM
Title:
ResDond to Process Radiation Monitor Alarm DAS50-1 JPM ID Number:
In-dant 1.1 Revision:
0 II. Initiated:
Nuclear Reaulatorv Commission
~~
D eve1 o p e r I I I. Reviewed:
Technical Reviewer IV. Approved:
Cognizant Plant Supervisor (optional)
Nuclear Training Supervisor 13 May 2004 Date Date Date Date
Job Performance Measure Guide Page 3 of IO
SUMMARY
OF CHANGES I Chanae I Description I Date
Job Performance Measure Guide Facility:
Millstone Unit 3 JPM ID Number:
In-plant 1.1 Page 4 of IO Student:
Revision:
0 Task
Title:
Respond to Process Radiation Monitor Alarm DAS50-I System:
nla Time Critical Task:
(
) YES
( X ) NO Validated Time (minutes): 15 Task Number(s):
Applicable To:
SRO X
RO X
PEO WA Number:
061.AK3.02 WA Rating:
3.6 13.4 Knowledge of the operational implications of the following concepts as they apply to Area Radiation Monitoring (ARM) System Alarms: Guidance contained in alarm response for ARM system.
Method of Testina:
Location:
Task Standards:
0 Required Materials:
Simulated Performance:
X Actual Performance:
Classroom:
Si m u I ator:
In-Plant::
X Applicant successfully locates the following components in-plant:
3DAS-AOV51 Control Air to 3DAS-AOV51 or Control Power fuses 3DFT-P2A or B 3DFT-P2A/B Auto Start Timer Applicant successfully simulates performance of steps 1 through 5 of AOP 3573, Attachment A for DAS50-I (Page 4 of 12).
Abnormal Operating Procedure AOP 3573, Radiation Alarm Response General
References:
Abnormal Operating Procedure AOP 3573, Radiation Alarm
Response
Job Performance Measure Guide Page 5 of IO I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
YOU ARE NOT TO ACTUALLY OPERATE ANY PLANT EQUIPMENT. SIMULATE AND DESCRIBE THE ACTIONS YOU WOULD TAKE.
Initial Conditions:
Initiating Cue:
You are a Plant Equipment Operator at Millstone Generating Station, Unit 3.
The Control Room has received a RAD HI annunciator alarm on MB2B 2-8.
The Control Room is responding per AOP 3573, Radiation Monitor Alarm Response. Process monitor DASSO-1, Turbine Building floor drain sump pump discharge, causes the alarm. The Control Room has directed you to perform Subsequent Action Steps 1 through 5 of AOP 3573, Attachment A.
YOU ARE TO PERFORM SUBSEQUENT ACTION STEPS 1 THROUGH 5 OF AOP 3573, ATTACHMENT A.
YOU ARE NOT TO ACTUALLY OPERATE ANY PLANT EQUIPMENT.
SIMULATE AND DESCRIBE THE ACTIONS YOU WOULD TAKE.
ARE THERE ANY QUESTIONS?
YOU MAY BEGIN.
- NOTES TO EVALUATOR****
- 1.
Critical steps for this JPM are indicated by an asterisk after the step. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.
- 2.
When the student states what hidher simulated action/observation would be, read the appropriate Cue.
- 3.
If necessary, question the student for details of simulated actions/observations (Le. What are you looking at? or What are you observing?).
Job Performance Measure Guide Page 6 of IO
- 1. -
- 2.
- 3.
- 4.
a.1 k
Applicant obtains/requests copy of AOP 3573.
Automatically diverts floor drains to TPCCW drain sump I 1A (Repositions 3DAS-AOV51, Turb Bldg 14-6-)
Automatically turns off and resets the auto start timer if both pumps in auto.
Automatically stops turb. Bldg sump pumps (3DFT-P2A and P2B) if the turbine bldg. Floor drains were initially aligned to the yard drains.
(AOP 3573, Att A, DASSO-I Automatic Actions)
IF 3DAS-AOV51 is aligned to yard drains, THEN, Fail 3DAS-AOV51 to radwaste (isolate air or pull control power fuses at 3BYS-PNL34FY Ckt 3).
(AOP3573, Att A, DAS50-I, Step 1)
The valve is still failed to Y(
liner 3EGIN, YOU ARE TO PERFORM STEPS 1 THROUGH 5 OF AOP 3573, ERATE ANY PLANT EQUIPMENT. SlMUL ZTIONS YOU WOULD TAKE..
~
Give copy of AOP 3573 to the Applicant Applicant goes to 3LWS-PNLOI. Less familiar applicant may go directly to turbine building.
Remote indication available at Radioactive Liquid Waste Panel (3LWS-PNLOI) in the Waste Bldg, 24 level.
3DAS-AOV51 indicator is easy to seehnterpret.
Examiner Notes Limit Switches Upper - RW (rad waste - BLUE light)
Lower - Drains (Yard Drains - YELLOW light)
Airline is easy to trace. Air to top only.
Applicant checks position of 3DAS-AOVSI Applicant recognizes need to fail 3DAS-AOV51 to radwaste by either of the Followina means:
Applicant locates and simulates isolating control air to 3DAS-AOV51 Close valve by turning in the clockwise direction
- d Drains (better applicant will not need CI
Job Performance Measure Guide a.2 b.*
6.*
- 7.
B.*
- 3.
Skill of the Craft niner Cue: I The valve has shifted Millstone's Site Safety Manual, MP-19-SH-REF01, Section 6, § 3.8.2 minimally requires low-voltage rubber gloves when working near equipment with voltages 6 0 to
~ 7 5 0.
If Applicant elects to pull fuses, use of proper PPE is important.
Examiner may waive actual donning of PPE once Applicant clearly indicates the requirement to use PPE.
niner Cue: I 3DAS-AOV51 is aligne Place one turbine building floor drain sump pump (3 DFT-P2A or 3 D FT-P2B) control switch in OFF.
(AOP3573, Att A. DAS50-1. Ster, 2)
I liner Cue: I The [selected] pump i!
Check the AUTO START TIMER ENABLED light lit.
(AOP3573, Att A, DASSO-I, Step 3) liner Cue: I The AUTO START TIM Manually Start one turbine building floor drain sump pump (3DFT-P2A or (AOP3573. Att A. DAS50 SteD 4) 3DFT-P2B).
1 - -,-,
The [selected] pump is can hear the pump run liner Cue:
Verify pump trips on sump low level.
(AOP3573, Att A, DAS50-1, Step 5)
Page 7 of IO necessity to vent the controller after isolating air to reposition the valve.
Applicant simulates venting the controller 1 Rad Waste I
I Applicant proceeds to 3BYS-PNL34F, Ckt 3, and simulates pulling control power fuses.
3BYS-PNL34F is Northeast of 3LWS-PNLOI. Applicant may recognize that valve failed to transfer to Radwaste from 3LWS-PNLOI remote indication and elect to pull fuses right there.
Good Practice - check circuit listing kept inside the panel.
P2NB in "OFF. This is done in the turbine Applicant checks that the AUTO START TIMER ENABLED light is lit White I light in center of panel R ENABLED light is lit.
I Applicant simulates manually starting the turbine building floor drain sump pump that is not in OFF I
'unning. The RED on light is energized. You ing normally behind you.
4pplicant simulates that the running pump trips on sump low level.
3ood Practice - look in sump by lifting
- over and shining light in to verify level is ow.
Job Performance Measure Guide Page 8 of IO I I O. I Applicant indicates that the task is comDlete.
-n Stop Time:
Denotes critical step-
Job Performance Measure Guide Appendix C3 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Page 9 of IO Examinee's Name :
Examiner's Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiner9 signature and date:
Job Performance Measure Guide Page IO of IO Student Handout JOB PERFORMANCE MEASURE INSTRUCTION SHEET DIRECTIONS TO STUDENT WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM SUBSEQUENT ACTION STEPS 1 THROUGH 5 OF AOP 3573, ATTACHMENT A.
DO NOT ACTUALLY OPERATE ANY PLANT EQUIPMENT. SIMULATE AND DESCRIBE THE ACTIONS YOU WOULD TAKE.
Initial Conditions You are a Plant Equipment Operator at Millstone Generating Station, Unit 3. The Control Room has received a "RAD HI" annunciator alarm on MB2B 2-8. The Control Room is responding per AOP 3573, Radiation Monitor Alarm Response. Process monitor DASSO-I, Turbine Building floor drain sump pump discharge, causes the alarm. The Control Room has directed you to perform Subsequent Action Steps 1 through 5 of AOP 3573, Attachment A.
Job Performance Measure Guide Page i o f i i NRC In-plant JPM 1.2
Job Performance Measure Guide Page20fii I. JPM JPM
Title:
Respond to potential steam binding of AFW pumps ID Number:
In-dant 1.2 Revision:
0 II. Initiated:
Nuclear Regulatory Commission Developer I I I. Reviewed:
Technical Reviewer IV. Approved:
Cognizant Plant Supervisor (optional)
Nuclear Training Supervisor 13 Mav 2004 Date Date Date Date
Job Performance Measure Guide Page30fii
SUMMARY
OF CHANGES I Chanae I Descrbtion I Date 1
Job performance Measure Guide Page40fii Facility:
Millstone Unit 3 Student:
JPM ID Number:
In-plant 1.2 Revision:
0 Task
Title:
Respond to potential steam binding of AFW pumps System:
n/a Time Critical Task:
(
) YES
( X ) NO Validated Time (minutes): 15 Task Number(s):
Applicable To:
SRO X
RO X
PEO X
WA Number:
061.K1.Ol WA Rating: 3.8 / 3.4 Knowledge of the physical connections and/or cause-effect relationships between the AFW and the following systems: S/G.
Method of Testing:
Simulated Performance:
X Actual Performance:
Location:
Classroom:
Simulator:
In-Plant::
X Task Standards:
0 Applicant successfully locates the following components in-plant:
3FWA*V967 3FWA*PlA 3FWA*V4 3 F WA*V963 3 F WA* P2 3F WA*V32 Applicant successfully simulates performance of steps 4.1 3.4 and 4.1 3.6. to drain demineralized water through the pump casing.
Required Materials:
0 Operating Procedure OP 3322, Auxiliary Feedwater System 0
Pipe Wrench (may be simulated) 0 Locked Valve Key 2022 (may be simulated) 0 Valve Assist Device (may be simulated) 0 Contact Pyrometer or Infrared Thermometer.
AFWRoomKey General
References:
0 Form OP 3322-009, Independent Verification after Restoration 0
Operating Procedure OP 3260B, Equipment Control 0 Work Control Procedure WC 6, Determination and Performance of Independent and Dual Verifications.
0 Surveillance Procedure SP 3670.3-01 3, Plant Equipment Rounds
- Radwaste
Job Performance Measure Guide Page50fii I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
YOU ARE NOT TO ACTUALLY OPERATE ANY PLANT EQUIPMENT. SIMULATE AND DESCRIBE THE ACTIONS YOU WOULD TAKE.
Initial Conditions:
Initiating Cue:
- 1.
Critical I You are a Plant Equipment Operator at Millstone Generating Station, Unit 3.
During rounds in the Auxiliary Building, you discover that temperature of the Piping to B SG at 3FWA*V878 is 197°F. Investigating, you find that the casings of motor driven auxiliary feedwater pump A, 3FWA*PIA, and turbine driven auxiliary feedwater pump, 3FWA*P2, are too hot to touch.
You report this information to the Control Room. The Shift Technical Advisor checks the Plant Computer and tells you and the Unit Supervisor that:
0 FWA-TSOA, 3FWA*PlA discharge piping temperature is 189F, 0
FWA-TSOC, 3FWA*P2 discharge piping temperature is 190°F.
The Unit Supervisor declares 3FWA*PlA and 3FWA*P2 inoperable and enters Tech Spec action statement 3.7.1.2.b. He then directs you to respond to potential steam binding of AFW Pumps per OP 3322. Specifically, you are to perform the steps necessary to cool the casings of 3FWA*PlA and 3FWA*P2. Then await further instruction.
YOU TO RESPOND TO POTENTIAL STEAM BINDING OF AFW PUMPS PER OP 3322. SPECIFICALLY, YOU ARE TO PERFORM THE STEPS NECESSARY TO COOL THE CASINGS OF 3FWA*PlA AND 3FWA*P2.
THEN AWAIT FURTHER INSTRUCTION.
YOU ARE NOT TO ACTUALLY OPERATE ANY PLANT EQUIPMENT.
SIMULATE AND DESCRIBE THE ACTIONS YOU WOULD TAKE.
ARE THERE ANY QUESTIONS?
YOU MAY BEGIN.
eps for this JPM are indicated by an asterisk and bolding. For the student to achieve a satisfactory grade, students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.
critical steps must be completed correctly. The
- 2.
When the student states what hidher simulated action/observation would be, read the appropriate Cue.
- 3.
If necessary, question the student for details of simulated actions/observations (i.e. What are you looking at? or What are you observing?).
Job Performance Measure Guide Start Time:
Page 6 of 11
- 1.
- 2.
- 3.
- 4.
niner Cue I Give Applicant a copy This section is normally entered from SP 3670.3-01 3, "Plant Equipment Rounds-Radwaste,"
when either the containment penetration is greater than 150-F or the pump casing is too hot to maintain hand contact.
(OP 3322, Note preceding step 4.13.1)
I niner Cue: I Give copy of OP 3322 IF discharge piping temperature is less than 150-F or hand contact can be maintained on the TDAFW pump casing, NOTIFY SM/US and IF directed, Go To Section 4.14.
(OP 3322, Step 4.13.1)
Refer To T/S 3.7.1.2, "Plant Systems, Auxiliary Feedwater System," and DETERMINE appropriate ACTION (OP 3322, Step 4.1 3.2) 3322.
I I
Bf OP 3322, Section 4.13.
Applicant reads note b the Applicant Initial conditions stated that the casing was too hot to touch. Therefore, no action required by Applicant.
May check end of casing by hand -
SAFETY ISSUE: use back of hand.
Initial conditions stated that the CRS has entered Technical Specification action statement 3.7.1.2.b. Therefore, no action required by Applicant.
Job Performance Measure Guide Paae 7 of I I CHECK AFW pump discharge pi pi n g tem pe ra tu re (com pu te r):
FWA-T50A, 3FWA*P1 A discharge piping temperature discharge piping temperature discharge piping temperature FWA-TSOB, 3FWA*PI B FWA-T50C, 3FWA*P2 (OP 3322, Step 4.1 3.3)
IF FWA-T50A, 3FWA*PIA discharge piping temperature, is greater than 185-F, PERFORM the following :
(OP 3322, Step 4.13.4)
UNLOCK and CLOSE 3FWA*V4, 3FWA*PlA discharge valve.
(OP 3322, Step 4.13.4.b)
Opening the AFW pump discharge vents may result in the release of steam or hot water.
(WARNING preceding OP 3322, Step 4.1 3.4. b) liner Cue: I 3FWA*V4 is closed OPEN 3FWA*V967,3FWA*PIA discharge vent.
(OP 3322, Step 4.13.4.b) liner Cue: I 3FWA*V967 is open / :
liner Cue: I The casing is cool to t~
Initial conditions stated the discharge temperatures for this JPM. Therefore, no action required by Applicant.
Applicant goes to 3FWA*PlA Color codina:
System is GREEN (band around Train "A" is ORANGE (all over the place)
Applicant simulates unlocking and closing (turning clockwise) 3FWA*V4,3FWA*PIA discharge valve. May use a cheater.
component label)
Not required to report Locked Valve manipulations to Control Room because operatincl per procedure.
Applicant reads WARNING and indicates understanding of the hazard. Prompt for vocalization if necessary.
Personal Safety ISSUE Applicant simulates uncapping and then careful opening of 3FWA*V967, 3FWA*PlA discharge vent. Applicant turns valve counter-clockwise.
Note: pipe caps at MS3 have vent holes drilled in them. Not failure criteria if Applicant fails to remove cap but poor practice.
in Applicant checks temperature of casing by hand or contact pyrometer.
SAFETY: Applicant should use back of hand to touch the casina.
? touch.
Job Performance Measure Guide (OP 3322, Step 4.13.4.d)
PERFORM Independent Verification for components listed for step 4.13.4.e.
(OP 3322. Step 4.1 3.4.e) 3' IF FWA-TSOC, 3FWA*P2 discharge piping temperature is greater than
- 15. 185"F, PERFORM the following:
(OP 3322. SteD 4.1 3.6)
UNLOCK and CLOSE 3FWA*V32, (OP 3322, Step 4.1 3.6.a)
OPEN 3FWA*V963,3FWA*P2 (OP 3322, Step 4.13.6.b)
I Examiner Cue: I 3FWA*V963 is open / I Paae 8 of I I Applicant simulates closing (clockwise turning) of 3FWA*V967,3FWA*PIA discharge vent. Then simulates replacing the pipe cap if necessary:
I water has stopped flowing from the vent I
Applicant simulates opening and locking of 3FWA*V4,3FWA*PIA discharge valve.
Applicant requests Independent Verification of 3FWA*V4 and 3FWA*V967.
- ations are complete.
I Applicant simulates unlocking and closing (clockwise turning ) 3 F WA*V32,3 F WA* P2 discharge valve. May use a cheater.
Not required to report Locked Valve manipulations to Control Room because operating per procedure.
discharge vent. Applicant turns valve counter-clockwise.
Note: pipe caps at MS3 have vent holes drilled in them. Not failure criteria if
Job Performance Measure Guide Page 9of 11
- 20.
Exa
- 21.
Exa
- 22.
P
- 23.
niner Cue: I The casing is cool to 1 WHEN the casing cools to touch, CLOSE 3FWA*V963, 3FWA*P2 discharge vent.
(OP 3322, Step 4.1 3.6.c)
OPEN and LOCK 3FWA*V32, 3FWA*P2 discharge valve.
(OP 3322, Step 4.13.6.d)
Refer To OP 3322-009 and PERFORM Independent Verification for components listed for step 4.1 3.6.e.
(OP 3322, Step 4.1 3.6.e)
Applicant checks temperature of casing by hand or contact pyrometer.
SAFETY: Applicant should use back of hand to touch the casina.
Y le touch.
Applicant simulates closing of 3FWA*V963, 3FWA*PIA discharge vent. Applicant turns valve clockwise. Then simulates replacing the pipe cap.
water has stopped flowing from the vent Applicant simulate opening and locking of 3FWA*V32,3FWA*PIA discharge valve.
Applicant requests Independent Verification of 3FWA*V32 and 3 F WA*V963.
vifications are complete.
teed to Step 4.13.7. If so, remind the Appli as to cool the pump casings and await further Stop Time:
Denotes critical task
Job Performance Measure Guide Page Appendix C3 Form ES-C-I 10 of 11 Job Performance Measure VERIFICATION OF COMPLETION No.
Examinee's Name:
Examiner's Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiner's signature and date:
Job Performance Measure Guide Student Handout Page I I of i 1
JOB PERFORMANCE MEASURE INSTRUCTION SHEET DIRECTIONS TO STUDENT YOU TO RESPOND TO POTENTIAL STEAM BINDING OF AFW PUMPS PER OP 3322. SPECIFICALLY, YOU ARE TO PERFORM THE STEPS NECESSARY TO COOL THE CASINGS OF 3FWA*PIA AND 3FWA*P2. THEN AWAIT FURTHER INSTRUCTION.
YOU ARE NOT TO ACTUALLY OPERATE ANY PLANT EQUIPMENT. SIMULATE AND DESCRIBE THE ACTIONS YOU WOULD TAKE.
Initial Conditions You are a Plant Equipment Operator at Millstone Generating Station, Unit 3.
During rounds in the Auxiliary Building, you discover that temperature of the Piping to "B" SG at 3FWA*V878 is 197°F. Investigating, you find that the casings of motor driven auxiliary feedwater pump "A, 3FWA*PlA, and turbine driven auxiliary feedwater pump, 3FWA*P2, are too hot to touch.
You report this information to the Control Room. The Shift Technical Advisor checks the Plant Computer and tells you and the Unit Supervisor that:
FWA-T50A, 3FWA"PlA discharge piping temperature is 189"F, 0
FWA-TSOC, 3FWA*P2 discharge piping temperature is 190°F.
The Unit Supervisor declares 3FWA*PlA and 3FWA*P2 inoperable and enters Tech Spec action statement 3.7.1.2.b. He then directs you to respond to potential steam binding of AFW Pumps. Specifically, you are to perform the steps necessary cool the casings of 3FWA"PlA and 3FWA*P2. Then await further instruction.
Job Performance Measure Guide Page I of 12 NRC In-plant JPM 1.3
~
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM
Title:
ESTABLISH ALTERNATE CHARGING PUMP COOLING (EOP 3501)
JPM ID Number:
137 NRC In-plant JPM 1.3
- 11.
Initiated:
Scott Shultz Developer I I I. Reviewed:
Dave Minnich Technical Reviewer IV. Approved:
NA Cognizant Plant Supervisor (optional)
Tim Kulterman Revision:
3 0 1 /02/03 Date 0 1 /06/03 Date Date 0 1 /06/03 Nuclear Training Supervisor 2 of 10 Date
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET
SUMMARY
OF CHANGES I
Chanae I Descrbtion L
Updated JPM to reflect EOP 3501 revision 013 which moved the performance steps to Attachment K of the procedure. Procedure now requires use of fire water and no longer allows domestic water use. Also changed Chicago fittings to cam-lock fittings in accordance with the hose control program. Modified to have B CHS pump the running pump to avoid duplicity with JPM-093.
Changed title from Establish Feed and Bleed on Charging Pump Cooling to Establish Alternate Charging Pump Cooling.: jss Date 12/30/02 3of 10
JOB PERFORMANCE MEASURE GUIDE (Continued)
I
- READ TO THE STUDENT"*
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
Facility:
Millstone Unit 3 Student:
JPM ID Number:
NRC In-plant JPM 1.3 Revision:
3 Task
Title:
ESTABLISH ALTERNATE CHARGING PUMP COOLING (EOP 3501)
System:
076 Time Critical Task:
(
) YES
( X ) NO Validated Time (minutes):
15 Task Number(s):
344-05-1 53 Applicable To:
SRO X
RO X
PEO X
WA Number:
076-A-2.0 1 WA Rating:
3.5 / 3.7 Ability to (a) predict the impacts of the following malfunctions or operations on the SWS; and )b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations.
Method of Testing:
Location:
Task Standards:
Required Materials:
General
References:
Simulated Performance:
X Actual Performance:
Classroom:
Si m u I ato r:
In-Plant:
X Satisfactorily establish alternate Charging Pump Cooling using EOP 3501, Loss of All AC (Modes 5 6, and Zero).
EOP 3501, Attachment K PEO Rounds key (Ops key)
EOP 3501, Attachment K, Rev. 01 3 4of 10
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:
137 Revision:
3 Initial Conditions:
The plant is in Mode 5. A loss of all AC power has occurred.
The control room team has progressed through EOP 3501.
Attempts are being made to establish injection flow using the charging pumps. Attempts to restore cooling to CCE have failed.
Initiating Cues:
The US has directed you to establish alternate charging pump cooling using EOP 3501 Attachment K. The B charging pump is running. Provide cooling to the B Charging Pump only.
- NOTES TO EVALUATOR ****
- 1.
Critical steps for this JPM are indicated by an X after the step number. For the student to achieve a satisfactory grade, The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.
critical steps must be completed correctly.
- 2.
When the student states what his/her simulated action/observation would be, read the appropriate Cue.
- 3.
If necessary, question the student for details of simulated actions/observations (Le. What are you looking at? or What are you observing?).
5of10
JPM Number:
137 PERFORMANCE INFORMATION Revision:
3 Task
Title:
ESTABLISH ALTERNATE CHARGING PUMP COOLING (EOP 3501)
Start Time:
Comments:
For the first step of this JPM, the required hoses and fittings are staged in the Operations Department EOP locker (AB 43 outside Boron Evaporator cubicle).
STEP 1
Performance Step: Determine Affected Charging Pump
[Step l.a]
Check a Train A charging pump -
RUNNING GRADE Standards:
Initial conditions stated that B charging pump is the running pump.
Proceeds to step 3. If candidate asks, provide the cue:
Grade:
SAT UNSAT STEP 2
X Pelformance Step: Locally Align Fire Water Supply to
[Step 3.a)
CCE Heat Exchanger B Connect a hose from fire header Hose Station 52 supply valve (3FPW-V812) to CCE HX B service water inlet drain valve (3SWP*Vl95)
GRADE X
Standards:
Locates Ops EOP locker AB 43 outside Boron Evap. Cubicle. Obtains hoses fittings and tools. Removes any pipe caps and connects hose from 3FPW-V812 (located outside C charging pump cubicle) to 3SWP*Vl95 (located in CCE cubicle).
Grade:
SAT UNSAT 6 of 10
JPM Number:
137 PERFORMANCE INFORMATION Revision:
3 Task
Title:
ESTABLISH ALTERNATE CHARGING PUMP COOLING (EOP 3501 1.
STEP 3
X Performance Step: Close CCE HX B service water supply
[Step 3.b]
valve (3SWP*V63)
GRADE X
Standards :
Locates 3SWP*V63, (AB 24' CCE cubicle) rotates operating handle clockwise until the valve is closed and the position indicator is perpendicular to the pipe.
Grade:
SAT UNSAT Comments:
Fire Water System pressure is higher than the CCE heat exchanger service water outlet relief valve setpoint pressure (3SWP*RV96B)
STEP 4
X Performance Step: Throttle Open fire Hose Station 52
[Step 3.~1 supply valve (3FPW-V812) one turn GRADE X
Standards:
Locates 3FPW-V812 (AB 24' outside "C" charging pump cubicle), rotates handwheel one (I) turn in the counterclockwise direction.
Grade:
SAT UNSAT 7 of 10
JPM Number:
137 PERFORMANCE INFORMATION Revision:
3 Task
Title:
ESTABLISH ALTERNATE CHARGING PUMP COOLING (EOP 3501 1 STEP 5
X Performance Step: Throttle Open CCE HX B service
[Step 3.d]
water inlet drain valve (3SWP*Vl95) to establish between 30 and 40 gpm flow (3SWP*FI 160B)
GRADE X
Standards:
Rotates 3SWP*V195 operating handle in the counterclockwise direction in small increments while observing flow indication on 3SWP*FI160B, until the indicated flow on 3SWP*FI160B is between 30 and 40 gpm.
STEP 6
GRADE STEP 7
GRADE Grade:
SAT UNSAT Performance Step: Check CCE HX SW outlet relief
[Step 3.e]
(3SWP*RV96B) - NOT LIFTING Standards:
Observes 3SWP*RV96B tailpiece for evidence of flow.
Grade:
SAT UNSAT Performance Step: Locally Monitor CCE System
[Step 4.a]
Check operating charging pump oil temperature - BETWEEN 55°F and 131 OF For pump B 3CHS-T11022B Standards:
Checks temperature indicated on 3CHS-TI 1022B (located in B charging pump cubicle)
Grade:
SAT UNSAT 8ofIO
PERFORMANCE INFORMATION JPM Number:
137 Revision:
3 Task
Title:
ESTABLISH ALTERNATE CHARGING PUMP COOLING (EOP 3501)
STEP 8
Performance Step: Notify Control Room that Alternate charging pump cooling has been established for B charging pump.
GRADE Standards:
Informs control room that alternate charging pump cooling for B charging pump has been established using EOP 3501, Attachment K.
Grade:
SAT UNSAT Terminating Cue: The evaluation for this JPM is concluded.
Stop Time:
9 of I O
PERFORMANCE INFORMATION JPM Number:
Task
Title:
137 Revision:
3 ESTABLISH ALTERNATE CHARGING PUMP COOLING (EOP 3501)
Appendix C3 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Response
Result: SAT or UNSAT Examiner's signature and date:
10 of 10
PERFORMANCE INFORMATION JPM Number:
137 Revision:
3 Task
Title:
ESTABLISH ALTERNATE CHARGING PUMP COOLING (EOP 3501 1 11 of 10
~
~
STUDENT HANDOUT JPM Number 137 Initial Conditions:
The plant is in Mode 5. A loss of all AC power has occurred. The control room team has progressed through EOP 3501. Attempts are being made to establish injection flow using the charging pumps. Attempts to restore cooling to CCE have failed.
Initiating Cues:
The US has directed you to establish alternate charging pump cooling using EOP 3501 Attachment K. The B charging pump is running. Provide cooling to the B Charging Pump only.
12 of 10
~
~-
Job Performance Measure Guide Page I of IO NRC In-plant JPM 1.4
STUDENT HANDOUT I. JPM
Title:
VERIFY ALL DILUTION PATHS ARE ISOLATED JPM ID Number:
001 NRC Implant JPM 1.4 II. Initiated:
J. S. Shultz Developer I I I. Reviewed:
John Deveau Technical Reviewer IV. Approved:
Cognizant Plant Supervisor (optional)
Raymond Lueneburg Nuclear Training Supervisor Revision:
5 Change 2 11/1/02 9/1/99 Date 9/3 019 9 Date Date I
0/5/99 Date
Change
~
Description Updated to reflect revision 16 of FR-S.1. Changed initiating cues to reflect performance of procedure step 11 and removed reference to BTRS which is no longer addressed in the Procedure. iss STUDENT HANDOUT
SUMMARY
OF CHANGES Date 11/1/02 I
STUDENT HANDOUT Facility:
Millstone Unit 3 Student:
JPM ID Number: NRC In-plant JPM 1.4 Revision:
5 Change 2 Task
Title:
VERIFY ALL DILUTION PATHS ARE ISOLATED System:
CHS Time Critical Task:
(
) YES
( X ) NO Validated Time (minutes):
I O Task Number(s):
000-05-01 9 and 000-05-044 Applicable To:
SRO X
RO X
PEO X
WA Number:
004-A2.06 WA Rating:
4.2 i 4.3 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, conto, or mitigate the consequences of those malfunctions or operations: Inadvertent borationidilution.
Method of Testing:
Simulated Performance:
X Act u a I Performance:
Location:
Classroom:
Simulator:
In-Plant::
X Task Standards:
Satisfactorily verify that the dilution valves in step 8 of FR-S.l are closed.
Required Materials:
Locked valve key, OP3260B-Attachment 3 General
References:
EOP 35 FR-S.l, Rev. 16
"*READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
STUDENT HANDOUT JPM Number: NRC In-plant JPM 1.4 Revision:
5 Change 2 I Simulator Requirements:
Initial Conditions:
Initiating Cues:
None: In-plant JPM An ATWS event is in progress and the Control Room Team is performing the actions required by EOP 35 FR-S.l, Response to Nuclear Power Generation/ATWS.
The US has directed you to verify 3CHS*V317 and 3CHS*V305 are closed IAW step 11 of EOP 35 FR-S.1. You have a locked valve (2022) key. The US has informed you that primary makeup water to the blender (3CHS*FCVI 1 IA) is closed. The Shift Manager has granted permission to reposition (SIMULATE) components as necessary to complete this task.
- 1.
Critical steps for this JPM are indicated by an X after the step number. For the student to achieve a satisfactory grade, The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.
critical steps must be completed correctly.
- 2.
When the student states what hidher simulated action/observation would be, read the appropriate Cue.
- 3.
If necessary, question the student for details of simulated actions/observations (Le.
What are you looking at? or What are you observing?).
STUDENT HANDOUT Start Time:
Comments:
Comments:
Steps I and 2 may be performed in any order.
Verification of locked components shall be in accordance with WC-6, Performance of Independent and Dual Verification. For this JPM, the examinee has been granted permission to unlock and manipulate components as necessary to determine valve position and establish the correct position.
STEP 1
X GRADE X
Performance Step:
Standards:
Locally check chemical mix tank outlet isolation valve (3CHS*V317) -
CLOSED. (Step 11; 2nd bullet)
Examinee unlocks the lock and removes the locking device (chain).
GRADE X
Standards:
Examinee checks valve closed by turning handwheel in the clockwise direction.
GRADE X
Standards:
Examinee reinstalls the locking device and locks the lock.
STUDENT HANDOUT Grade:
SAT UNSAT STEP 2
X Performance Step: Locally check manual dilution valve (3CHS*V305) - CLOSED. (Step 11; 3d bullet)
GRADE X
Standards:
Examinee unlocks the lock and removes the locking device (chain).
GRADE X
Standards:
Examinee checks valve closed by turning handwheel in the clockwise direction.
GRADE X
Standards:
Examinee reinstalls the locking device and locks the lock.
Grade:
SAT UNSAT
STUDENT HANDOUT STEP 3
Performance Step: Notify the US that valves 3CHS*V317 and *V305 have been verified closed.
GRADE Standards:
Reports to US that step 11 of EOP 35 FR-S.l is complete and valves 3CHS*V317 and *V305 are closed.
Grade:
SAT UNSAT Terminating Cue: The evaluation for this JPM is concluded.
Stop Time:
STUDENT HANDOUT Appendix C3 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Response
Result: SAT or UNSAT Examiner's signature and date:
STUDENT HANDOUT JPM Number In-plant JPM 1.4 Initial Conditions:
An ATWS event is in progress and the Control Room Team is performing the actions required by EOP 35 FR-SA, Response to Nuclear Power GenerationIATWS.
Initiating Cues:
The US has directed you to verify 3CHS*V317 and 3CHS*V305 are closed IAW step 1 I of EOP 35 FR-S.1.
You have a locked valve (2022) key. The US has informed you that primary makeup water to the blender (3CHS*FCVlIlA) is closed.