Job Performance Measure Worksheet Facility:
Pilgrim Task No:
201 01 -003 Task
Title:
CRD Weekly Exercises No:
1 WA
Reference:
201002 A3.03 3.Z3.2 Position:
RO/SRO Examinee:
NRC Examiner:
Date:
Method of testing:
Simulated Performance Actual Performance J
Classroom Simulator J
Plant Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Plant conditions are as follows:
The Reactor is at 100% power.
A Control Rod Exercise is to be performed IAW PNPS 8.3.2.
PNPS 8.3.2 is partially complete. Rod 14-31 was the last rod complete.
Reactor Engineering is present in the Control Room.
An operator has been assigned to verify control rod withdrawal.
0 A 3D Monicore control rod position log is available.
v Task Standard: Control rod exercise will be performed IAW all precautions and limitations described in PNPS 8.3.2. When an uncoupled rod is discovered, the rod will be recoupled IAW off-normal procedure 2.4.1 1. There shall be no failure of critical elements. Critical steps must be performed in order; other steps may be performed out of sequence.
Required Materials: Marked up copy of PNPS 8.3.2 PNPS 2.4.1 I.
General
References:
PNPS 2.4.1 1, Rev. 26 PNPS 8.3.2, Rev. 40 Initiating Cue: [Candidates name], commence the control rod exercise with rod 18-31.
Time Critical Task: NO Validation Time: 13 minutes L-1
PERFORMANCE INFORMATION (Critical steps denoted with a check mark) 1-Performance Step 1 :
Review the applicable section of the procedure.
Standard: Candidate reviews PNPS 8.3.2 and signs Step 7.0[4].
Comment:
0 All controls associated with this JPM are located on C905.
Role-play as necessary to answer any questions the candidate may have during the procedure review. Possible questions that might be asked are:
- 1.
Is the fuel within the preconditioned envelope? Yes. The subsequent recirc flow increase will require soft ramp rates.
- 2.
Are we within 2% of any limit? No. We will have >2% margin to all thermal limits throughout the rod withdrawal.
J Performance Step 2:
Insert control rod.
Standard: Candidate selects next rod (18-31 / 38-31) on the rod select matrix and inserts to notch position 46 by momentarily turning the ROD CONTROL switch to the IN position.
Comment: Rod 18-31 is selected the first time through this portion of the JPM. Steps 2-5 are also repeated with rod 38-31.
Performance Step 3:
Verify rod insertion and latching.
Standard: Candidate verifies that rod stops at notch position 46 Comment: Role-play as verifier, and verify the rod is at the proper position. (Note: Agree with whatever the candidate says.)
2
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
J Performance Step 4:
Withdraw rod to position 48.
Standard: Rod withdrawn to notch position 48 by momentarily turning the ROD CONTROL switch to the NOTCH OUTposition.
Comment:
J Performance Step 5:
position 48.
Candidate performs coupling check when each control rod reaches Standard: Candidate applies a notch override and rod out signal when each drive reaches 48 and confirms:
(1) alarm (C905L-B3), rod overtravel, does not annunciate (2) position indication on four rod display goes BLACWBLACK, then returns to (3) FULL OUT on full core display goes off, then back on 48 Comment: When fault occurs for rod 38-31, skip to step 7. Otherwise, continue to step 6.
~~~~
~
~
~~~~~
Performance Step 6:
Candidate initials completion of exercising rod 18-31 Standard: Candidate initials CRD matrices on Attachments 3 and 5.
Comment: After exercising rod 18-31, repeat steps 2-5 for rod 38-31, This step will not be performed for rod 38-31 because of the fault 3
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
J Performance Step 7:
Respond to rod 38-31 overtravel condition.
Standard: Candidate terminates withdrawal of additional control rods and investigates overtravel and rod drift alarms.
Comment: Candidate suspends additional rod withdrawal.
Performance Step 8:
Announces overtravel and rod drift alarms and refers to ARPs.
Standard: Candidate announces overtravel and rod drift alarms and refers to ARPs.
Comment:
c-Performance Step 9:
uncoupled.
Review rod overtravel ARP (C905L-B3) and determines rod is Standard: Candidate reviews rod overtravel ARP (C905L-B3) and determines rod is uncoupled.
Comment:
4
PERFORMANCE fNFORMATlON (Critical steps denoted with a check mark)
Performance Step I O :
Enter and execute off-normal procedure 2.4.1 1.
Standard: Candidate enters and executes off-normal procedure 2.4.1 1.
Comment:
Performance Step I 1 :
the rod.
Consult with Reactor Engineering prior to attempting to recouple Standard: Candidate consults with Reactor Engineering prior to attempting to recouple the rod.
Comment:
As Reactor Engineering, cue the candidate that, "I recommend continuing with off-normal procedure".
J Performance Step 12:
insert control rod two notches.
Standard: Candidate inserts control rod to notch position 44 by turning the ROD CONTROL switch to the IN position twice, pausing in between operations to verify rod movement.
Comment: Control Rod inserted to position 44.
5
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
J Performance Step 73: Withdraw rod to position 48 by notching the rod out.
Standard: Candidate notch withdraws rod to position 48 by notching the rod out by turning ROD CONTROL switch to the NOTCH OUTposition twice, pausing in between to verify rod motion.
Comment:
J Performance Step 14:
rod out signal and confirm that alarm (C905L-B3) rod overtravel, does not annunciate.
Perform another coupling check by applying a notch override and Standard:
Candidate performs another coupling check by applying a notch override and rod out signal and confirms:
(I) alarm (C905L-B3), rod overtravel, does not annunciate (2) position indication on four rod display goes BLACWBLACK, then returns to (3) FULL OUT on full core display goes off, then back on 48 Comment:
Performance Step 15:
Determine rod is re-coupled.
Standard: Candidate determines rod is re-coupled.
Comment:
6
Terminating Cue:
When rod 38-31 is recoupled, the examiner should inform the candidate that the JPM is complete.
7
VERIFICATION OF COMPLETION
\\.-*
JPM No.:
Examinee's Name:
Examiner's Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiner's signature and date:
8
~
Job Performance Measure Quality Checklist Every JPM should:
- 1.
J Be supported by facility licensees job task analysis.
- 2.
J Be operationally important (meets NRC WA Catalog threshold criterion of 2.5 (3 for requalification exams) or as determined by the facility and agreed to by the NRC).
- 3.
J Be designed as either SRO only, RO/SRO or AO/RO/SRO.
- 4.
Include the following, as applicable:
- a.
J Initial conditions
- b.
Initiating cues
- c.
J References and tools, including associated procedures
- d.
Validated time limits (average time allowed for completion) and specific designation of those JPMs that are deemed to be time-critical by the facility operations department
- e.
J Specific performance criteria that include:
(1)
Expected actions with exact control and indication nomenclature and criteria (switch position, meter reading), even if these criteria are not specified in the procedural step (2)
System response and other cues that are complete and correct so that the examiner can properly cue the examinee, if asked (3)
J Statements describing important observations that should be made by the examinee (4)
Criteria for successful completion of the task (5)
Identification of those steps that are considered critical (6)
J Restrictions on the sequence of steps 9
Information Provided to Candidate Initial Conditions:
Plant conditions are as follows:
0 0
0 0
0 0
The Reactor is at 100% power.
A Control Rod Exercise is to be performed IAW PNPS 8.3.2.
PNPS 8.3.2 is partially complete. Rod 14-31 was the last rod complete.
Reactor Engineering is present in the Control Room.
An operator has been assigned to verify control rod withdrawal.
A 3D Monicore control rod position log is available.
Initiating Cue: [Candidates name], commence the control rod exercise with rod 18-31 10
Job Performance Measure Worksheet Facility:
Pilgrim Task No:
204-01 004 Task
Title:
Restart Reactor Water Cleanup No:
2 Following Auto Isolation WA
Reference:
204000 A2. 13 3.4/3.4 Position:
RO/SRO Examinee:
NRC Examiner:
Date:
Method of testing:
Si m u I a t ed Perform an ce Actual Performance J
Classroom Simulator J
Plant Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
~--..,
Plant conditions are as follows:
The Reactor is at pressure.
0 RWCU system has automatically isolated.
0 The GP VI isolation signal was initiated by a faulty temperature switch, which has since been repaired and post work tested.
0 All prerequisites for restoring RWCU have been met.
0 It is estimated that Chemistry requirements will be violated in less than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> without RWCU.
0 CAVS is in service Initiating Cue: [Candidates name], reset the Group VI isolation and restore RWCU to service per 2.2.125.1 with both filter demins in service.
Task Standard: Reset the Group 6 isolation and restore RWCU to operation IAW 2.2.125.1. There shall be no failure of critical elements. Critical steps must be performed in order; other steps may be performed out of sequence.
Required Materials: None General
References:
PNPS 2.2.125.1, Rev. 14 and PNPS 2.2.83, Rev. 75 Time Critical Task: NO Validation Time: 13 minutes I
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 1 :
Candidate reviews the applicable section of the procedure.
Standard: Applicable section of the procedure reviewed.
Comment: 0 All critical steps must be performed in the order written unless otherwise noted.
0 All components are located on panel C-904 in the control room unless otherwise noted.
0 Radwaste personnel are standing by at RWCU 1279 panel.
J Performance Step 2:
the PClS Group 2, 3, 6 Isolation Reset Switch on panel C-905.
When the cause of the isolation has been corrected, then reset Standard:
and OUTBOARD positions.
Candidate rotates switch both clockwise and counterclockwise to INBOARD Comment:
Performance Step 3:
220-44, Inboard Isolation Valve.
If CAVS is in service, then isolate flow to CAVS by closing AO-Standard: Candidate rotates switch for AO-220-44 to the CLOSED position notes green CLOSED light lit, red OPEN light not illuminated.
Comment:
2
b PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 4:
AO-220-45, Outboard Isolation Valve.
If CAVS is in service, then isolate flow to CAVS by closing Standard:
Candidate rotates switch for AO-220-45 to the CLOSED position and notes green CLOSED light lit, red OPEN light not illuminated.
Comment:
J Performance Step 5:
Open MO-1201-5.
Standard: Candidate rotates the MO-1201-5 switch clockwise and releases.
'v Comment:.
J Performance Step 6:
Throttle MO-1201-80 slightly open.
Standard:
Candidate rotates the MO-1201-80 switch clockwise momentarily and releases.
Comment:
Performance Step 7:
a throttled position.
Candidate notes Caution: CAUTION: Do not leave MO-1201-2 in Standard:
Candidate notes caution prior to step 4b.
Comment:
3
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 8:
Slowly jog open MO-1201-2 to full open position.
Standard: Candidate momentarily rotates switch for MO-I 201 -2 clockwise.
Comment: MO-1201-2 does not respond.
Performance Step 9:
Perform attachment 11 of PNPS 2.2.83.
Standard: Candidate obtains and reviews Attachment 11 of PNPS 2.2.83.
Comment:
Performance Step I O :
to 450 degrees.
Test vessel temperature is determined to be greater than or equal Standard: Candidate asks Chemistry about test vessel temperature.
Comment: Cue candidate that chemistry informs him that test vessel temperature is 500 degrees F.
4
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 11: Verify AO-220-44 and AO-220-45 are closed.
Standard: Candidate verifies green lights for AO-220-44 and AO-220-45 are lit and red light are not illuminated Comment:
~
J Performance Step 12:
Close 2-HO-135, CAVS Supply Upstream Block Valve.
Standard: Candidate instructs 2-HO-135 to be closed locally.
Comment: Inform candidate that 2-HO-135 is closed.
(Note: Simulator booth operator closes 1201 -47 on RWCU schematic)
L, J
Performance Step 13:
Open AO-220-44 and AO-220-45 Standard: Candidate rotates switch for AO-220-44 and AO-220-45 counterclockwise and verifies that red lights are lit and green lights are out.
Comment:
~
J Performance Step 14:
Slowly open 2-HO-135 Standard: Candidate instructs that 2-HO-135 be slowly opened locally.
Comment: Simulator booth operator slowly opens 1201 -47 5
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
J Performance Step 15:
open MO-1201-2, Inboard Isolation Valve.
When pressure indicated on PI-I 290-9 stops increasing slowly jog Standard: Candidate notes pressure stabilized on PI-1290-9 then slowly jogs MO-1201-2 switch in the clockwise direction until fully open.
Comment:
Performance Step 16:
Place CAVS in desired configuration according to PNPS 10.2.8.
Standard: Candidate informs chemistry to place CAVS in service per PNPS 10.2.8.
Comment:
Performance Step 17: Return to step [5](c) of PNPS 2.2.125.1, Attachment 6.
Standard: Candidate returns to step [5](c) of PNPS 2.2.125.1, Attachment 6.
Comment:
6
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 18:
minimum setting and verify FV-1279-15A and FCV-1279-15B closed.
At panel C1279 decrease FC-1279-15A and FC-1279-15B to Standard: Candidate informs Radwaste to set FC-1279-15A and FC-1279-15B to minimum setting and verify FV-1279-15A and FC-1279-15B are closed.
Comment: Cue the candidate that, FC-1279-15A and FC-1279-15B are at minimum setting and FV-I 279-1 5A and FV-1279-15B are closed.
J Performance Step 19: Start a Cleanup Recirculation Pump.
Standard: Candidate takes switch for RWCU pump to START then releases the switch.
b Comment: Candidate should check flow and discharge pressure indication for pump started.
Performance Step 20: Verify/place the HOLD/FILTER Switch in the Filter position.
Standard: Candidate calls Radwaste to verify HOLD/FILTER switch in Filter position.
Comment: As Radwaste, cue the candidate that, switch is in FILTER position.
7
i PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
J Performance Step 21 : Slowly jog open MO-1201-80.
Standard: Candidate rotates switch for MO-1201-80 clockwise momentarily then releases.
Repeat until flow reaches 1 1 1 gpm on FI-1290-30A and FI-I 290-30B.
Comment: FI-1290-30A and FI-l290B indicated 1 1 1 gpm each.
Performance Step 22:
service to achieve 11 1 GPM.
Slowly place FC-1279-15A and FC-1279-15B control switch in Standard: Candidate informs Radwaste to slowly place FC-1279-15A and FC-1279-15B in service to achieve 111 GPM.
Comment: Cue the candidate that FC-1279-15A and FC-1279-15B are in service.
Performance Step 23:
flow increase.
Check RWCU filter flow at FI-1290-30A and FI-1290-30B for filter Standard: Candidate notes flow has increased.
Comment:
8
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 24:
necessary to maintain 11 1 GPM flow.
Continue opening MO-1201-80 AND adjust flow controls as Standard:
Candidate continues to open MO-I 201-80 and coordinates with Radwaste as needed to operate FC-1279-15A and FC-1279-15B.
Comment: If candidate asks about reject flow, cue that rejecting is not required.
J Performance Step 25:
Open MO-1201-80 full open and system is back in service.
Standard: Candidate rotates MO-1201-80 switch clockwise until full open.
Comment: MO-1201-80 has red light lit green light out.
Terminating Cue:
examiner that the task is complete.
When the candidate has fully opened the MO-1201-80, he should inform the 9
VERIFICATION OF COMPLETION c
JPM No.:
Examinees Name:
Examiners Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
.L-
Response
Result: SAT or UNSAT Examiners signature and date:
10
L Job Performance Measure Quality Checklist Every JPM should:
- 1.
J Be supported by facility licensees job task analysis.
- 2.
J Be operationally important (meets NRC K/A Catalog threshold criterion of 2.5 (3 for requalification exams) or as determined by the facility and agreed to by the NRC).
- 3.
J Be designed as either SRO only, ROlSRO or AO/RO/SRO.
- 4.
Include the following, as applicable:
- a.
J Initial conditions
- b.
Initiating cues
- c.
J References and tools, including associated procedures
- d.
Validated time limits (average time allowed for completion) and specific designation of those JPMs that are deemed to be time-critical by the facility operations department
- e.
J SDecific performance criteria that include:
Expected actions with exact control and indication nomenclature and criteria (switch position, meter reading), even if these criteria are not specified in the procedural step System response and other cues that are complete and correct so that the examiner can properly cue the examinee, if asked Statements describing important observations that should be made by the examinee Criteria for successful completion of the task Identification of those steps that are considered critical Restrictions on the sequence of steps I 1
-.-/
Information Provided to Candidate Initial Conditions:
Plant conditions are as follows:
The Reactor is at pressure.
e RWCU system has automatically isolated.
e The GP VI isolation signal was initiated by a faulty temperature switch, which has since been repaired and post work tested.
e All prerequisites for restoring RWCU have been met.
e It is estimated that Chemistry requirements will be violated in less than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> without RWCU.
e CAVS is in service Initiating Cue: [Candidates name], reset the Group VI isolation and restore RWCU to service per 2.2.125.1 with both filter demins in service.
12
Job Performance Measure Worksheet Facility:
Pilgrim Task NO:
248-01-01-01 1 Task
Title:
Transfer from MPR to EPR JPM No:
3 WA
Reference:
241000 A4.02 4.114.1 Position:
RO/SRO Examinee:
NRC Examiner:
Date:
Method of testina:
Simulated Performance Actual Performance J
Classroom Simulator J
Plant Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Plant conditions are as follows:
0 0
0 The Reactor is at 100% rated power.
Due to maintenance on the EPR, control was transferred to the MPR.
The maintenance is complete and it is desired to place EPR back in operation.
The EPR has been energized for 10 minutes.
Task Standard: Transfer from MPR to EPR per PNPS 2.2.99, Section 7.4.4. The procedure shall be followed without failure of critical steps. Critical steps must be performed in order; other steps may be performed out of sequence.
Required Materials: None General
References:
PNPS 2.2.99, Rev. 35 Initiating Cue: [Candidates name], transfer from MPR to EPR per PNPS 2.2.99, Section 7.4.4.
Time Critical Task: NO Validation Time: 5 minutes 1
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step I Candidate reviews PNPS 2.2.99, Section 7.4.4.
Standard: PNPS 2.2.99, Section 7.4.4 reviewed.
Comment:
Performance Step 2:
Candidate reviews the following note: When the EPR is initially energized the pressure setpoint will ramp to maximum pressure prior to placing EPR in control and energizing the operators setpoint control switch. (EPR setpoint) This will take approximately 5 minutes.
Standard: Note is reviewed.
Comment: EPR should be fully ramped at this time.
Performance Step 3:
avoid pressure transients.
Candidate reviews caution to adjust pressure regulators slowly to Standard: Candidate makes pressure adjustments in a slow and controlled manner.
Comment:
2
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
~~
Performance Step 4:
Placeherify EPR power switch to NORM at Panel C2.
Standard: Verifies EPR power switch in NORM.
Comment:
Performance Step 5:
reaches its maximum setpoint of I010 psig.
Wait 1 minute from the time EPR setpoint indicator ZI-301 3 Standard:
minutes but candidate may wait anyway.
Not needed since JPM initial conditions stated EPR was energized for 10 Comment: Examiner may cue the candidate that, 1 minute has elapsed.
Performance Step 6:
control, the red pressure control light over the EPR setpoint switch on panel C2 will come on and the EPR control position indicator 21-3014 will rapidly increase to the setpoint indicating EPR has control. The red pressure control light above the MPR SETPT switch will go off and the green NOT IN CONTROL light will come on. This rapid increase is an instrument response and will not result in a pressure transient.
Candidate reviews note prior to Step 3: Once the EPR takes Standard: Candidate reviews note.
Comment:
3
\\
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
J Performance Step 7:
C/S to LOWER until the EPR takes control from the MPR (red PRESS CONTROL light above EPR SETPT C/S comes on).
RESTORE the EPR to control slowly by placing the EPR SETPT Standard: EPR SETPT C/S taken to lower until red pressure control light above EPR SETPT C/S comes on.
Comment:
J Performance Step 8:
ADJUST MPR SETPT C/S so that MPR CONTROL POSITION Indicator ZI-3020 is set approximately 11 to 13% lower than EPR CONTROL POSITION Indicator 21-301 4.
L Standard: 21-3020 indicates I I to 13% lower than 21-3014.
Comment:
4 Performance Step 9:
Set EPR SETPT to maintain PI-640-25A, REACTOR PRESSURE for CH A, and PI-640-25B, REACTOR PRESSURE for CH B, on Panel C905 at less than or equal to 1035 psig.
Standard: PI-640-25NB indicates less than or equal to 1035 psig.
Comment:
4
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Terminating Cue:
PI-640 25A(B), inform him/her that the task is complete.
When candidate has adjusted EPR setpoint to maintain reactor pressure on 5
VERIFICATION OF COMPLETION e
JPM No.:
Examinees Name:
Examiners Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
L-, Response:
Result: SAT or UNSAT Examiners signature and date:
6
Job Performance Measure Quality Checklist Every JPM should:
- 1.
J Be supported by facility licensees job task analysis.
- 2.
J Be operationally important (meets NRC WA Catalog threshold criterion of 2.5 (3 for requalification exams) or as determined by the facility and agreed to by the NRC).
- 3.
Be designed as either SRO only, RO/SRO or AO/RO/SRO.
- 4.
Include the following, as applicable:
- a.
J initial conditions
- b.
J Initiating cues
- c.
J References and tools, including associated procedures
- d.
Validated time limits (average time allowed for completion) and specific designation of those JPMs that are deemed to be time-critical by the facility operations department
- e.
J Specific performance criteria that include:
Expected actions with exact control and indication nomenclature and criteria (switch position, meter reading), even if these criteria are not specified in the procedural step System response and other cues that are complete and correct so that the examiner can properly cue the examinee, if asked Statements describing important observations that should be made by the examinee Criteria for successful completion of the task Identification of those steps that are considered critical Restrictions on the sequence of steps 7
L Information Provided to Candidate Initial Conditions:
Plant conditions are as follows:
0 The Reactor is at 100% rated power.
0 Due to maintenance on the EPR, control was transferred to the MPR.
0 The maintenance is complete and it is desired to place EPR back in operation.
The EPR has been energized for 10 minutes.
Initiating Cue: [Candidates name], transfer from MPR to EPR per PNPS 2.2.99, Section 7.4.4.
8
Job Performance Measure Worksheet Facility:
Pilgrim Task No:
205-05-01 -031 Task
Title:
Manual Initiation of LPCl While In No:
4 Shutdown Cooling WA
Reference:
203000 A4.05 4.3i4.1 Position:
RO/SRO Examinee:
NRC Examiner:
Date:
Method of testing:
Simulated Performance Actual Performance J
Classroom Simulator J
Plant Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be L, satisfied.
Initial Conditions:
Plant conditions are as follows:
0 0
Reactor is shutdown with both A loop RHR pumps in shutdown cooling.
A small leak in the vessel has occurred and LPCl is needed for injection.
Task Standard: The RHR System is aligned for LPCl injection and injecting. There shall be no failure of critical elements. All critical steps must be performed in the order written unless otherwise noted.
Required Materials: Tagout sheet for RHR loop A in shutdown cooling.
General
References:
PNPS 2.2.19, Rev. 83 Initiating Cue: [Candidates name], align RHR for LPCl injection and inject into both recirc loops with all RHR pumps IAW PNPS procedure 2.2.19, Section 7.3.2.
Time Critical Task: NO Validation Time: 20 minutes I
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 1:
Review the applicable section of the procedure.
Standard: Candidate reviews the applicable section of the procedure.
Comment:
All tags outside the Main Control Room are removed and independently checked when required. The examiner will provide independent verification in the Main Control Room as required.
All RHR components operated in this JPM are on Panel C903 horizontal section.
Performance Step 2:
Review caution about closure time of MO-1001-43 valves.
Standard: Candidate reviews caution.
Comment:
~~
Performance Step 3:
Verify RHR pumps B and D are tripped.
Standard: Candidate verifies that RHR pump B and D are tripped.
Comment: Performance Steps 3 and 4 can be performed in any order.
2
PERFORMANCE INFORMATION (Critical steps denoted with a check mark) v J
Performance Step 4:
Trip RHR pumps A and Cy.
Standard:
position in any order.
Candidate rotates RHR pump A and C control switches to the STOP Comment: Performance Steps 3 and 4 can be performed in any order
~~
~
~
J Performance Step 5:
Verify closed or close MO-1001-47 and MO-1001-50.
Standard: Candidate closes SHUTDOWN COOL OUTBD ISOL VLV, MO-1001-47 and SHUTDOWN COOL INBD ISOL VLV, MO-1001-50.
Comment:
J Performance Step 6:
Close MO-1001-43A and C pump suction valves.
Standard: Candidate rotates PUMP A SUCT VLV MO-1001-43A and PUMP C SUCT VLV, MO-I 001 -43C control switches to the CLOSE position.
Comment: Steps 6 and 7 can be performed in any order.
3
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 7:
Verify closed MO-1001-43B and D pump suction valves.
Standard:
SUCT VLV MO-I 001 -43D are CLOSED.
Candidate verifies that PUMP B SUCT VLV MO-1001-43B and PUMP D Comment: Verification will be performed by using tagout sheet, valve indicating lights not illuminated, valve control switch in the CLOSE position and local verification of the valve power supply breaker open.
Steps 6 and 7 can be petformed in any order J
Performance Step 8:
Remove tag and close breaker for MO-1 001 -1 8A.
Standard: Candidate contacts outside operator and directs the removal of danger tag and the closure of breaker B1754 for valve MO-1001-18A at Panel 817.
Comment: If candidate requests CRS assistance, then CUE: Contact the outside operator to remove the DANGER TAG and shut the breaker for MO-1001-18A at panel B I 7.
NOTE:
I/F Operator: Remove overrides on RED and GREEN INDICATING LIGHTS, and the valve control switch, contact candidate and report that the danger tag is removed and the breaker is closed for MO-1001-18A.
Performance Step 9:
Remove tag from MO-1001-18A control switch.
Standard:
VLV control switch.
Candidate removes DANGER TAG from MO-1001-18A PUMP MIN FLOW Comment:
4
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
W J
Performance Step I O :
Open MO-1 001 -1 8A.
Standard: Candidate rotates PUMP MIN FLOW VLV MO-1001-18A control switch to the OPEN position.
Comment:
Performance Steps 10 and 1 I can be performed in any order.
Performance Step I 1 : Verify MO-1001-18B is open.
Standard: Candidate verifies PUMP MIN FLOW VLV MO-1001-188 is in the OPEN position.
Comment:
J Performance Step 12:
valves.
Remove tags and close breakers for A and C torus suction Standard: Candidate contacts outside operator and directs removal of DANGER TAGS and breaker closing for MO-I 001 -7A and MO-1 001 -7C valves at Panel B17.
Comment: If candidate requests CRS assistance, then CUE: Contact the outside operator to remove the DANGER TAGS and close the breakers for MO-1001-7A and C valves at 817.
NOTE:
MO-1001-7A and C valves and contact candidate to report that the DANGER TAGS are removed and the breakers are closed for MO-1001-7A and C.
I/F Operator: Remove overrides on RED and GREEN INDICATING LIGHTS, for c
5
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 13:
suction valves.
Remove tags on MO-1001-7A and MO-1001-7C pump torus Standard:
Candidate removes danger tags from MO-1001-7A TORUS SUCTION VALVE PUMP A and MO-1001-7C TORUS SUCTION VALVE PUMP C control switches.
Comment:
J Performance Step 14:
Open MO-1001-7A and 7C.
Standard: Candidate rotates TORUS SUCTION VALVE MO-1001-7A PUMP A and TORUS SUCTION VALVE MO-1001-7C PUMP C control switches to the OPEN position.
L Comment: Step 14 and 15 can be performed in any order.
Performance Step 15: Verify MO-1001-7B and 7D are open.
Standard: Candidate verifies TORUS SUCTION VALVE MO-I 001-7B PUMP B and TORUS SUCTION VALVE MO-1001-7D PUMP D are in the OPEN position.
Comment: Step 14 and 15 can be performed in any order.
6
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 16:
Remove tag and close breaker 62041 Standard: Candidate directs outside operator to remove Danger Tags and close the breaker for MO-1001-19 LOOP X-TIE valve at 6-20.
Comment: If candidate requests CRS assistance, then CUE: Contact the outside operator to remove the DANGER TAG and close the breaker for MO-1001-19 at B20.
NOTE:
19 and contact candidate that danger tag is removed and the breaker is closed for MO-1001 -1 9.
I/F Operator: Remove overrides on red and green indicating lights for MO-1001-Performance Step 17: Verify MO-1001-53 is open.
u Standard: Candidate verifies RHR DISCHARGE HEADER CROSSTIE VALVE, MO-1001-53 is in the OPEN position.
Comment: Operator may know that 1001-53 is open when RHR A is in Shutdown Cooling, or may dispatch an operator to verify the valve is open.
Performance Step 18: Remove tag on MO-1001-19, LOOP X-TIE valve.
Standard:
control switch.
Candidate removes DANGER TAG from MO-1001-19, LOOP X-TIE valve Comment:
7
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 19: Open MO-1001-19, LOOP X-TIE VALVE.
Standard: Candidate rotates MO-1001-19 LOOP X-TIE valve control switch to the OPEN position.
Comment:
Performance Step 20: Verify MO-1001-16A and 16B are open.
Standard: Candidate verifies RHR HX BYP VLV, MO-1001-16A RHR HX BYP VLV MO-1001 -1 6B are in the OPEN position.
Comment:
Performance Step 21 :
Loop Select Logic pushbuttons.
Reset isolation logic by depressing the Loop A and Loop B LPCl Standard: Candidate may recognize that no isolation is in effect or may actually depress the Loop A and Loop B LPCl Loop Select Logic pushbuttons Comment:
8
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
J Performance Step 22:
Open MO-1001-29B, LPCl INJ VLV #2.
Standard:
OPEN position.
Candidate rotates LPCI INJ VLV # I MO-1001-29B control switch to the Comment: Performance Steps 22 and 23 can be performed in any order.
~~~
~
Performance Step 23:
Verify MO-1001-29A, LPCl INJ VLV #2 is OPEN.
Standard: Candidate verifies LPCI INJ VLV #2 MO-1001-29A is OPEN.
Comment: Performance Steps 22 and 23 can be performed in any order.
J Performance Step 24:
Start RHR pumps A, B, C and D.
Standard: Candidate rotates RHR PUMP A, B, C AND D control switches to the START position.
Comment:
Terminating Cue:
should inform the candidate that the JPM is complete.
When all 4 RHR pumps are started and both loops are injecting, the examiner 9
VERIFICATION OF COMPLETION u
JPM No.:
Examinees Name:
Examiners Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
L. Response:
~~
Result: SAT or UNSAT Examiners signature and date:
I O
Job Performance Measure Quality Checklist
~
Every JPM should:
- 1.
J Be supported by facility licensees job task analysis.
- 2.
J Be operationally important (meets NRC WA Catalog threshold criterion of 2.5 (3 for requalification exams) or as determined by the facility and agreed to by the NRC).
Be designed as either SRO only, RO/SRO or AO/RO/SRO.
- 3.
- 4.
Include the following, as applicable:
- a.
J I n it ia I cond i tions
- b.
J Initiating cues
- c.
J References and tools, including associated procedures
- d.
Validated time limits (average time allowed for completion) and specific designation of those JPMs that are deemed to be time-critical by the facility operations department
- e.
J Specific performance criteria that include:
Expected actions with exact control and indication nomenclature and criteria (switch position, meter reading), even if these criteria are not specified in the procedural step System response and other cues that are complete and correct so that the examiner can properly cue the examinee, if asked Statements describing important observations that should be made by the examinee Criteria for successful completion of the task Identification of those steps that are considered critical Restrictions on the sequence of steps I 1
Information Provided to Candidate Initial Conditions:
Plant conditions are as follows:
0 Reactor is shutdown with both A loop RHR pumps in shutdown cooling.
0 A small leak in the vessel has occurred and LPCl is needed for injection.
Initiating Cue: [Candidates name], align RHR for LPCl injection and inject into both recirc loops with all RHR pumps IAW PNPS procedure 2.2.19, Section 7.3.2.
12
Job Performance Measure Worksheet Facility:
Pilgrim Task
Title:
Starting a 3rd Reactor Feed Pump Task No:
259-01-01-003 JPM No:
5
~
WA
Reference:
259001 A4.02 3.9/3.7 Position:
RO Examinee:
NRC Examiner:
Date:
Method of testina:
Simulated Performance Actual Performance J
Classroom Simulator J
Plant Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Plant conditions are as follows:
0 Reactor power is 60%.
0 0
Power ascension to 100% is in progress following a week long shutdown.
A and B reactor feed pumps are running.
Task Standard: Third feed pump will be started with no loss of level control (>+9 and <+48). The system procedure shall be followed without failure of critical tasks. All critical steps must be performed in order written unless otherwise noted.
Required Materials: Marked up copy of 2.2.96, Attachment 15.
General
References:
PNPS 2.2.96, Rev. 72 Initiating Cue: [Candidates name], startup the third reactor feed pump IAW PNPS procedure 2.2.96 Section 2.4 and place the RFP TRIP SEQUENCE SELECTOR SWITCH in the ABC position.
Time Critical Task: NO Validation Time: 17 minutes I
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step I :
Review the applicable sections of the procedure.
Standard: Candidate reviews the precautions of 2.2.96.
Comment:
Performance Step 2:
Review Note at beginning of Section 2.4.
Standard: Note is reviewed.
Comment:
Performance Step 3:
Record the RFP to be started.
Standard: Candidate records C in blank space.
Comment:
2
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
J Performance Step 4:
Start the C RFP Auxiliary Oil Pump.
Standard:
candidate takes the RFP C control switch to START momentarily.
Candidate calls field operator to start the C RFP Auxiliary Oil Pump -
OR Comment: Report from field operator if requested to start Aux Oil Pump locally: C RFP Auxiliary Oil Pump is started.
~
Performance Step 5:
Run Auxiliary Oil Pump for 5 minutes.
Standard: Candidate waits 5 minutes before proceeding.
Comment: Cue candidate, 5 minutes have elapsed.
Performance Step 6:
Verify adequate lubrication and local indication.
Standard: Candidate calls field operator to verify adequate lubrication and status of C RFP Auxiliary Oil Pump running indicator light.
Comment: Report from field operator: Oil pressure and lubrication for C RFP are satisfactory. The C RFP Auxiliary Oil Pump running light is on.
3
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
L.
Performance Step 7:
Verify Auxiliary Oil Pump running light is on at C1.
Standard: Candidate verifies that C RFP Auxiliary Oil Pump running light is on at C1 Comment:
Performance Step 8:
90 to 11 0°F oil temperature.
Adjust C RFP lube oil cooler TBCCW outlet valves to maintain Standard: Candidate calls field operator to align TBCCW to the lube oil coolers to maintain 90 to 110°F oil temperature IAW 2.2.96, Attachment 15, Section 2.4, Step [3]c.
Comment: Report from field operator: TBCCW lineup is complete to maintain 90 to 1 10°F oil temperature Performance Step 9:
Reduce hydrogen flow to less than 17 SCFM.
Standard: Candidate calls Chemistry to reduce hydrogen flow to less than 17 SCFM IAW PNPS 10.2.4, Section 7.9.
Comment: Report from Chemistry. Hydrogen flow is less than 17 SCFM.
4
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step I O :
Verify hydrogen is secured to C RFP.
Standard: Candidate calls field operator to align ETS for CJ RFP IAW 2.2.96, Attachment 15, Section 2.4, Step [5](c).
Comment: Report from field operator: 73-HO-8052C is closed, and SW619 is in the CLOSE position.
Performance Step 11: Vent C RFP inbd and outbd mechanical seals.
Standard: Candidate orders NLNPO to vent C RFP inbd and outbd mech seals IAW PNPS 2.2.96, Attachment 15, Section 2.4, Step [6].
Comment: C RFP inboard and outboard mechanical seals have been vented.
Performance Step 12: Verify RFP suction pressure is at least 250 psig.
Standard: Candidate verifies at least 250 psig indicated on PI-3429 (C-I).
Comment:
5
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 13:
Open the C RFP recirc valve.
Standard: Control switch for FV-3437 (C-I) to OPEN.
Comment:
Performance Step 14:
Review note about minimum flow line.
Standard: Candidate reviews note.
Comment:
.-..-/
Performance Step 15: Verify or place RFP trip sequence selector switch is in OFF.
Standard: Candidate checks/places RFP trip sequence selector switch (C-1 ) in OFF.
Comment:
6
L PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
J Performance Step 16: Start C RFP.
Standard: Candidate places control switch for C RFP (C-I) to START.
Comment:
Performance Step 17:
Check RPV water level.
Standard: Candidate verifies RPV water level in proper band (approx 30) and being controlled by FWLC (C-905).
Comment:
~~
~
Performance Step 18: Check total feedwater flow.
Standard: Candidate verifies feed flow indication stable.
Comment:
7
u PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 19:
Place C RFP recirc valve in AUTO.
Standard: Control switch for C RFP recirc valve (FV-3437) to AUTO (C-I).
Comment:
Performance Step 20:
Check RFP suction and discharge pressures, and motor current.
Standard: Suction pressure >200 psig and discharge pressure normal (PI-3429 and 3468 on C-I), and motor current <650 amps.
Comment:
Performance Step 21 : Check C RFP aux oil pump auto shutdown occurred.
Standard: Green OFF light on for C RFP aux oil pump at C-I.
Comment:
8
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
~~
~~
Performance Step 22: Verify C RFP lube oil cooler TBCCW lineup.
Standard: 5, Section 2.4, Step [16](c).
Candidate calls field operator to verify TBCCW lineup IAW PNPS 2.2.96, Comment: Report from field operator: TBCCW lineup verified IAW PNPS 2.2.96, 5, Section 2.4, Step [16](c).
J Performance Step 23:
Place RFP TRIP SEQUENCE SELECT switch in ABC position.
Standard: Candidate verifies or places RFP TRIP SEQUENCE SELECT switch in ABC position.
L Comment:
~
~
~~
J Performance Step 24:
Place RFP trip sequence enable switch to ON.
Standard: Candidate places RFP trip sequence selector switch (C-I) to ON.
Comment:
Terminating Cue:
When the RFP trip sequence enable switch is ON, h/she should inform the examiner that the JPM is complete.
9
VERIFICATION OF COMPLETION JPM No.:
Examinees Name:
Examiners Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
L-
Response
Result: SAT or UNSAT Examiners signature and date:
Job Performance Measure Quality Checklist Every JPM should:
- 1.
J Be supported by facility licensees job task analysis.
- 2.
J Be operationally important (meets NRC WA Catalog threshold criterion of 2.5 (3 for requalification exams) or as determined by the facility and agreed to by the NRC).
- 3.
J Be designed as either SRO only, RO/SRO or AO/RO/SRO.
- 4.
Include the following, as applicable:
- a.
J Initial conditions
- b.
J Initiating cues
- c.
J References and tools, including associated procedures
- d.
Validated time limits (average time allowed for completion) and specific designation of those JPMs that are deemed to be time-critical by the facility operations department
- e.
J Specific performance criteria that include:
Expected actions with exact control and indication nomenclature and criteria (switch position, meter reading), even if these criteria are not specified in the procedural step System response and other cues that are complete and correct so that the examiner can properly cue the examinee, if asked Statements describing important observations that should be made by the examinee Criteria for successful completion of the task Identification of those steps that are considered critical Restrictions on the sequence of steps
Information Provided to Candidate Initial Conditions:
Plant conditions are as follows:
0 Reactor power is 60%.
0 0
Power ascension to 100% is in progress following a week long shutdown.
A and B reactor feed pumps are running.
Initiating Cue: [Candidates name], startup the third reactor feed pump IAW PNPS procedure 2.2.96 Section 2.4 and place the RFP TRIP SEQUENCE SELECTOR SWITCH in the ABC position.
12
L--
Job Performance Measure Worksheet Facility:
Pilgrim Task No:
264-02-01 -006 Task
Title:
Manually Start and Load an Emergency JPM No:
6 Diesel Gen. (for Monthly Surveillance)
WA
Reference:
264000 A4.04 3.7/3.7 Posit ion:
RO/SRO Examinee:
NRC Examiner:
Date:
Method of testing:
Simulated Performance Actual Performance J
Classroom Simulator J
Plant Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
u Initial Conditions:
Plant conditions are as follows:
0 0
0 0
Monthly surveillance of the A Emergency Diesel Generator is scheduled.
Preparations are complete for performance.
The prerequisites of 8.9.1 are complete. A is filled out and local pre-start checks are complete.
Task Standard: Manually start and load an Emergency Diesel Generator IAW 8.9.1. The system procedure shall be followed without failure of critical tasks. All critical steps must be performed in order unless otherwise noted.
Required Materials: D.G. start keys, marked up copy of 8.9.1.
General
References:
PNPS 8.9.1, Rev. 77 Initiating Cue: [Candidates name], perform the monthly surveillance of the A Emergency Diesel Generator IAW PNPS procedure 8.9.1.
Time Critical Task: NO Validation Time: 28 minutes L
I
c PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 1 :
Review the applicable sections of the procedure.
Standard: Candidate reviews the applicable section of the procedure.
Comment: All components are located on Panel C3 in the Control Room unless otherwise noted.
J Performance Step 2:
SET the DIESEL GEN A TEST switch to TEST on Panel C3.
Standard: Candidate inserts key and rotates DG A test switch clockwise to the TEST position.
Comment:
J Performance Step 3:
SWITCH to DROOP on Panel C3.
SET the DIESEL GEN A GOVERNOR MODE SELECTOR Standard: Candidate rotates DG A Governor Selector Switch clockwise to DROOP.
Comment:
2
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 4:
SELECTOR SWITCH is in AUTO at Panel C3.
VERIFY the DIESEL GEN A VOLTAGE REGULATOR MODE Standard: Candidate verifies DG A voltage regulator mode selector switch is in AUTO.
Comment:
J Performance Step 5:
Section 3 (Diesel Start - Local).
NOTIFY the operator at the diesel to perform Attachment 1, Standard: Candidate uses Gaitronics System to notify operator at A Diesel Gen Room to perform Attachment 1, Section 1.3.
Comment: Report from Field Operator: Status lights on C-I 01 indicate droop mode operating and voltage regulator in auto. I am prepared for the start of A EDG.
The candidate should direct the outside operator to start A EDG.
Report from Field Operator after start: EDG A is running satisfactorily, crankcase exhausters are running, auxiliary pre-lube pump is off, DC fuel oil pump is not running and ClOl cooling fan is running. Attachment 1B data has been recorded. You may load the diesel.
~
Performance Step 6:
RECORD start initiation time, voltage and frequency.
Standard:
Candidate records start time on Attachment IC, and voltage and frequency on Comment:
L 3
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 7:
ADJUSTER, adjust the Diesel Generator output voltage to 4200 volts.
Using the DIESEL GEN A VOLTAGE REGULATOR SETPOINT Standard: Candidate sets DG output voltage to 4200 volts.
Comment:
Performance Step 8:
VERIFY Diesel Generator voltage and speed varies on demand.
Standard: Candidate raises DG A voltage regulator setting up by about 1 OOV and then down about 200V.
Comment:
J Performance Step 9:
ON.
SET the DIESEL GEN A to BUS A5 synchronizing switch to Standard: Candidate places control switch in opening and rotates the synch switch clockwise to the ON position.
Comment:
4
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step I O :
SET incoming voltage slightly above the running voltage.
Standard: Candidate turns DG A voltage regulator setpoint adjusters as necessary to set incoming voltage slightly above running voltage.
Comment:
Performance Step 1 I : Verify Diesel Generator frequency varies on demand.
Standard: Candidate rotates the DG A Governor Speed Control Switch clockwise until frequency increases by one Hz and counterclockwise until frequency decreases by 2 Hz.
L-..,
Comment:
Performance Step 12:
produce a slow rotation in the FAST direction.
ADJUST DIESEL GEN A GOVERNOR SPEED CONTROL to Standard: Candidate ROTATES DG A Governor Speed Control clockwise to produce a slow rotation in the fast direction.
Comment:
5
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
J Performance Step 13:
Slightly before an in-phase indication, CLOSE breaker A509, DIESEL GEN A TO BUS A5.
Standard: Candidate rotates control switch for breaker A509 DG A to Bus A5 clockwise to synch the diesel on bus.
Comment:
~~
~
~
J Performance Step 14:
with the DIESEL GEN A GOVERNOR SPEED CONTROL.
IMMEDIATELY INCREASE load to 500 kW (450 to 550 kW)
Standard: Candidate rotates DG A Governor Speed Control Switch clockwise to increase load to 500 kW.
Comment:
Performance Step 15:
to OFF.
SET the DIESEL GEN A TO BUS A5 synchronizing switch Standard: Candidate rotates synchronizing switch counterclockwise to OFF.
Comment:
6
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
J Performance Step 16:
with the DIESEL GEN A VOLTAGE REGULATOR SETPOINT ADJUSTER.
INCREASE reactive load to 250 kVAR (200 to 300 kVAR)
Standard: Candidate rotates DG A to Bus A5 voltage regulator setpoint adjuster clockwise to increase reactive load to 250 kVAR and records time.
Comment: Eight minutes have elapsed.
J Performance Step 17: AFTER the diesel has run for at least 8 minutes, INCREASE load to 1000 kW (950 to 1050 kW) using the DIESEL GEN A GOVERNOR SPEED CONTROL.
Standard:
Candidate rotates DG A Governor Speed control Switch clockwise to increase load to 1000 kW.
Comment:
J Performance Step 18:
INCREASE reactive load to 500 kVAR (450 to 550 kVAR) using the DIESEL GEN A VOLTAGE REGULATOR SETPOINT ADJUSTER and record ti me.
Standard: Candidate rotates DG A voltage regulator setpoint adjuster clockwise to increase load to 500 kVAR and records time.
Comment: Eight minutes have elapsed.
v 7
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
J Performance Step 19: AFTER the diesel has run for at least 8 minutes, INCREASE load to 1800 kW (1750 to 1850 kW) using the DIESEL GEN A GOVERNOR SPEED CONTROL.
Standard:
load to 18000 kW.
Candidate rotates DG A Governor Speed control Switch clockwise to increase Comment:
J Performance Step 20: INCREASE reactive load to 750 kVAR (700 to 800 kVAR) using the DIESEL GEN A VOLTAGE REGULATOR SETPOINT ADJUSTER and record time.
Standard: Candidate rotates DG A voltage regulator setpoint adjuster clockwise to increase load to 750 kVAR and records time.
c Comment: Eight minutes have elapsed.
J Performance Step 21 :
60-minute run by INCREASING load to 2600 kW (2550 to 2650 kW) using the DIESEL GEN A
GOVERNOR SPEED CONTROL.
AFTER the diesel has run for at least 8 minutes, LOAD diesel for Standard: Candidate rotates DG A Governor Speed Control Switch clockwise to increase load to 2600 kW.
Comment:
.-/
8
L PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
W J
Performance Step 22:
kVAR) using the DIESEL GEN A VOLTAGE REGULATOR SETPOINT ADJUSTER and record time.
INCREASE reactive load to 1250 kVAR (1 200 to 1300 Standard: Candidate rotates DG A voltage regulator setpoint adjuster counterclockwise to increase reactive load to 1250 kVAR and records time.
Comment:
Performance Step 23:
Begin logging full load data on Attachments I B and IC.
Standard: Candidate reports the 60 minute run has begun, begins log taking on C and notifies operator at diesel to begin taking full load data on Attachment 1 B.
Comment:
Performance Step 24:
At breaker 152-509, RECORD the phase current for each phase below and on Attachment 1 D (maximum 451 amps).
Standard: Candidate requests data from field operator.
Comment: After appropriate time delay, report field operator results: Current on B phase indicates 0 amps.
9
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 25:
the diesel AND OPEN breaker A509 at Panel C-3.
IF any phase current indicator reads 0, IMMEDIATELY UNLOAD Standard:
counterclockwise.
Candidate unloads diesel by taking the DG A Governor Speed Control Switch Comment:
J Performance Step 26:
Open breaker A509 at Panel C3.
Standard: Candidate opens breaker A509 by turning the breaker control switch on Panel C3 counterclockwise.
Comment:
Terminating Cue:
When the candidate has opened breaker E509, inform him/her that the task is complete.
I O
VERIFICATION OF COMPLETION b
JPM No.:
Examinees Name:
Examiners Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
- Response:
Result: SAT or UNSAT Examiners signature and date:
11
Job Performance Measure Quality Checklist L-Every JPM should:
- 1.
J Be supported by facility licensee's job task analysis.
- 2.
J Be operationally important (meets NRC WA Catalog threshold criterion of 2.5 (3 for requalification exams) or as determined by the facility and agreed to by the NRC).
- 3. J Be designed as either SRO only, RO/SRO or AO/RO/SRO.
- 4.
Include the following, as applicable:
- a.
J I n it i a I con d it i o n s
- b.
Initiating cues
- c.
J References and tools, including associated procedures
- d.
Validated time limits (average time allowed for completion) and specific designation of those JPMs that are deemed to be time-critical by the facility operations department
- e.
J Specific performance criteria that include:
Expected actions with exact control and indication nomenclature and criteria (switch position, meter reading), even if these criteria are not specified in the procedural step (1)
J System response and other cues that are complete and correct so that the examiner can properly cue the examinee, if asked (2)
Statements describing important observations that should be made by the examinee (3)
(4)
I/
Criteria for successful completion of the task (5) I/
Identification of those steps that are considered critical (6) J Restrictions on the sequence of steps 12
Initial Conditions:
Information Provided to Candidate Plant conditions are as follows:
0 0
0 0
Monthly surveillance of the A Emergency Diesel Generator is scheduled.
Preparations are complete for performance.
The prerequisites of 8.9.1 are complete. A is filled out and local pre-start checks are complete.
Initiating Cue: [Candidates name], perform the monthly surveillance of the A Emergency Diesel Generator IAW PNPS procedure 8.9.1.
13
Job Performance Measure Worksheet Facility:
Pilgrim Task
Title:
LPRM Failure WA
Reference:
215005 A4.04 3.413.4 Examinee:
Date:
Method of testing:
Simulated Performance Classroom Read to the Examinee:
Task No:
21 5-04-01 -001 No:
7 Position:
RO/SRO NRC Examiner:
Actual Performance J
Simulator J
Plant I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
-\\-.
Plant conditions are as follows:
0 0
LPRM 12-37A has failed.
0 0
The Reactor is at 100% power.
2.4.38, LPRM Failure procedure is being executed LPRM 12-37A needs to be bypassed.
Task Standard:
described in PNPS 2.2.66. There shall be no failure of critical elements. Critical steps must be performed in order; other steps may be performed out of sequence.
Bypassing the failed LPRM will be performed IAW all precautions and limitations Required Materials: None General
References:
PNPS 2.2.66, Rev. 16 Initiating Cue: [Candidates name], bypassLPRM 12-37A IAW PNPS 2.2.66 Time Critical Task: NO Validation Time: 10 minutes c-1
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step I :
Review the applicable section of the procedure.
Standard: Candidate reviews PNPS 2.2.66 precautions and limitations Comment:
Performance Step 2:
Record the LPRM to be bypassed.
Standard: Candidate records "12-37A " in the blank provided on Attachment 4 of 2.2.66 Comment:
u Performance Step 3:
Obtain permission from the SM to bypass the LPRM.
Standard: Candidate receives permission to bypassLPRM 12-37A.
Comment: Cue the candidate as the Shift Manager: "You have permission to bypassLPRM 12-37A.
2
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 4:
sufficient LPRM inputs to meet Tech Spec 3.1.I.
If the LPRM inputs to an APRM, THEN VERIFY there are Standard: Candidate determines number of valid LPRM inputs to APRM B and asks CRS to ensure there are a sufficient number of inputs to meet Tech Spec 3.1.I Comment: LPRM 12-37A inputs to APRM Channel 6. Cue the candidate: "Tech Spec 3.1.I is still met".
~~
~
~
J Performance Step 5:
Bypass the APRM channel in which the LPRM inputs.
Standard: APRM BYPASS switch on C905 is moved into the CH B position Comment:
Performance Step 6:
Verify the APRM channel bypass light is ON at C905 and C937.
Standard:
APRM CH B BYPASS light is on at C937.
Candidate verifies that the APRM B BYPASSED light is on at C905 and the Comment:
3
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
J Performance Step 7:
thumb switch (S-I) to the BY position.
At panel C937, BYPASS the LPRM by placing the control or Standard: Candidate takes the S-I switch for LPRM 12-37A at panel C937 to the BY position Comment:
Terminating Cue:
candidate that the JPM is complete.
When the candidate bypassesLPRM 12-37A, the examiner should inform the 4
VERI FI CAT1 ON 0 F COMP LET1 ON 1
JPM No.:
Examinees Name :
Examiners Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
- Response:
Result: SAT or UNSAT Examiners signature and date:
5
Job Performance Measure Quality Checklist Every JPM should:
- 1.
J Be supported by facility licensees job task analysis.
- 2.
J Be operationally important (meets NRC WA Catalog threshold criterion of 2.5 (3 for requalification exams) or as determined by the facility and agreed to by the NRC).
- 3.
Be designed as either SRO only, RO/SRO or AO/RO/SRO.
- 4.
Include the following, as applicable:
- a.
J Initial conditions
- b.
J Initiating cues
- c.
J References and tools, including associated procedures
\\.-
- d.
J Validated time limits (average time allowed for completion) and specific designation of those JPMs that are deemed to be time-critical by the facility operations department
- e.
J SDecific performance criteria that include:
(3)
J Expected actions with exact control and indication nomenclature and criteria (switch position, meter reading), even if these criteria are not specified in the procedural step System response and other cues that are complete and correct so that the examiner can properly cue the examinee, if asked Statements describing important observations that should be made by the examinee Criteria for successful completion of the task Identification of those steps that are considered critical Restrictions on the sequence of steps 6
.\\.-.-
Information Provided to Candidate Initial Conditions:
Plant conditions are as follows:
0 0
LPRM 12-37A has failed.
The Reactor is at 100% power.
2.4.38, LPRM Failure procedure is being executed LPRM 12-37A needs to be bypassed.
Initiating Cue: [Candidates name], bypassLPRM 12-37A IAW PNPS 2.2.66.
7
Job Performance Measure Worksheet Facility:
Pilgrim Task
Title:
Manually Start SGBT and Vent the Torus Task No:
223-04-0 1 -001 JPM No:
8 WA
Reference:
261000 A404 3.3/3.4 Position:
RO/S RO Examinee:
NRC Examiner:
Date:
Method of testing:
Simulated Performance Actual Performance J
Classroom Simulator J
Plant Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
u Plant conditions are as follows:
0 0
The plant is at power with the mode switch in RUN.
It is desired to vent the torus to raise DW to torus D/P.
Task Standard: The torus is initially aligned correctly for the torus venting evolution. The candidate recognizes the alarms/indications associated with a leak in the drywell and takes action to secure the torus venting lineup. The primary containment atmosphere control and standby gas treatment systems shall be operated in accordance with all applicable system precautions and limitations. The system procedure shall be followed without failure of critical tasks. Critical steps must be performed in order.
Other steps may be performed out of sequence.
Required Materials: None General
References:
PNPS 2.2.70, Rev. 82 Initiating Cue: [Candidates name], vent the torus using the B train of Standby Gas Treatment in accordance with PNPS 2.2.70, Section 7.3 and 7.3.3. Inform me when the task is complete.
Time Critical Task: NO Validation Time: 15 minutes 1
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
L.-
Performance Step I Candidate reviews PNPS 2.2.70, Section 7.3 and Section 7.3.3.
Standard: PNPS 2.2.70, Section 7.3 and 7.3.3 reviewed.
Comment:
Performance Step 2:
Refers to Technical Specifications 3.7.A. 1. k.
Standard: Candidate references T.S. Section 3.7.A. 1.k.
NOTE: T.S. 3.7.A. 1.k - The differential pressure may be reduced to less than 1.17 psid for a maximum of four (4) hours for maintenance activities on the differential pressure control system and during required operability testing of the HPCl system, the relief valves, the RClC system and the drywell suppression chamber vacuum breakers.
Comment:
Performance Step 3:
indicate a leak in containment and require securing venting.
Candidate reviews Step [2] to determine conditions that may Standard: Candidate reads the step.
Comment:
2
PERFORMANCE IN FORMATION (Critical steps denoted with a check mark)
J Performance Step 4:
Open AO-504lA, Torus Normal Exhaust Isolation Valve.
Standard: AO-5041A keylock switch is taken to OPEN and has red light on, green light off.
Comment:
J Performance Step 5:
Open AO-5041 B, Torus Normal Exhaust Isolation Valve.
Standard: AO-5041 B keylock switch is taken to OPEN and has red light on, green light off.
Comment:
L J
Performance Step 6:
Open AO-N-98, Contaminated Exhaust Plenum Damper.
Standard: AO-N-98 switch is taken to OPEN and has red light on, green light off.
Comment:
3
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
J Performance Step 7: Open AO-N-101, Refuel Floor Exhaust to SGTS Inlet Plenum Standard: AO-N-101 switch is taken to OPEN and has red light on, green light off.
Comment:
J Performance Step 8:
Open AO-N-112, Train B Outlet Damper.
Standard:
AO-N-I 12 switch is taken to OPEN and has red light on, green light off Comment:
Performance Step 9:
position.
Verify VEX-21 OA, Standby Gas Fan A, control switch in AUTO Standard: VEX-21 OA control switch is verified in AUTO.
Comment:
4
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
'L, J
Performance Step I O :
Open "AO-N-106, Train 'B' Inlet Damper".
Standard: AO-N-106 switch is taken to OPEN and has red light on, green light off. Fan VEX-210B starts and has red light on, green light off.
Comment:
Performance Step 11:
CRS for recording in the CRS log.
Candidate proceeds to the main control room to report start time to Standard: Candidate reports VEX-21 OB start time to CRS.
Comment: IF Operator: When the candidate goes to report the start time, insert the malfunction that brings in the alarms.
Performance Step 12: Acknowledge annunciators C7L-C5 & C6 and C904LC-B3.
Standard: Candidate references ARP for alarms received after pressing alarm acknowledge PB on C7 and C904.
Comment:
5
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 13:
Report receipt of annunciators to CRS.
Standard: Candidate reports alarming conditions and ARP actions for C904LC-B3 and C7L-C5 & C6.
Comment:
Performance Step 14:
Exit procedure 2.2.70, Section 7.3.3 and enters Section 7.10.
Standard: Candidate exits Section 7.3.3 and enters Section 7.10.
Comment:
Performance Step 15:
Verify SV-5030AI N2 Makeup Supply Block Valve CLOSED.
Standard: SV-5030A switch is verified in CLOSE and has green light on, red light off.
Comment:
Performance Step 16: Verify AO-5035AI Drywell Purge Supply Isolation Valve closed.
Standard: AO-5035A switch is verified in CLOSE and has green light on, red light off.
Comment:
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 17: Verify AO-5036A, Torus Purge Supply Isolation Valve is closed.
Standard: AO-5036A switch is verified in CLOSE and has green light on, red light off.
Comment:
J Performance Step 18: Rotate AO-5041A, Torus Normal Exhaust Isolation Valve, control switch to the CLOSE position.
Standard: AO-5041A keylock switch is taken to CLOSE and has green light on, red light off.
Comment:
J Performance Step 19:
switch to the CLOSE position.
Rotate AO-5041 B, Torus Normal Exhaust Isolation Valve, control Standard: AO-5041 B keylock switch is taken to CLOSE and has green light on, red light off.
Comment:
7
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 20:
Verify AO-5042A, Torus Purge Exhaust Isolation Valve, is closed.
Standard: AO-5042A switch is verified in CLOSE and has green light on, red light off.
Comment:
Performance Step 21 : Verify AO-5042B, Torus Purge Exhaust Isolation Valve is closed.
Standard: AO-5042B switch is verified in CLOSE and has green light on, red light off.
Comment:
Performance Step 22:
closed.
Verify AO-5043A, Drywell Normal Exhaust Isolation Valve, is Standard: AO-5043A keylock switch is verified in CLOSE and has green light on, red light Off.
Comment:
8
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 23:
closed.
Verify AO-5043B, Drywell Normal Exhaust Isolation Valve, is Standard: AO-5043B keylock switch is verified in CLOSE and has green light on, red light Off.
Comment:
Performance Step 24:
closed.
Verify AO-5044A, Drywell Purge Exhaust Isolation Valve, is Standard: AO-5044A switch is verified in CLOSE and has green light on, red light off.
Comment:
Performance Step 25:
closed.
Verify AO-5044B, Drywell Purge Exhaust Isolation Valve, is Standard: AO-5044B switch is verified in CLOSE and has green light on, red light off.
Comment:
9
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
J Performance Step 26:
AUTO position.
Rotate AO-N-106, Train B Inlet Damper, control switch to the Standard: AO-N-106 switch is taken to AUTO and has green light on, red light off.
Comment:
Performance Step 27:
AUTO pos it i on.
Verify AO-N-99, Train A Inlet Damper, control switch in the Standard: AO-N-99 switch is verified in AUTO and has green light on, red light off.
Comment:
Performance Step 28:
AUTO position.
Verify AO-N-108, Train A Outlet Damper, control switch in the Standard: AO-N-108 switch is verified in AUTO and has green light on, red light off.
Comment:
10
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
J Performance Step 29:
AUTO position.
Rotate AO-N-112, Train B Outlet Damper, control switch to the Standard: AO-N-112 switch is taken to AUTO and has green light on, red light off.
Comment: Procedurally, AO-N-98, Contaminated Exhaust to SGTS Inlet Plenum, and AO-N-101, Refuel Floor Exhaust to SGTS Inlet Plenum, are not required to be closed. However, if the candidate asks permission to close these valves give direction to do so.
Terminating Cue: When B SBGT has been started and subsequently secured due to the drywell leak, the examiner should inform the candidate that the task is complete.
11
VERIFICATION OF COMPLETION JPM No.:
Examinees Name:
Examiners Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
.L Result: SAT or UNSAT Examiners signature and date:
12
Job Performance Measure Quality Checklist Every JPM should:
- 1.
J Be supported by facility licensees job task analysis.
- 2. J Be operationally important (meets NRC WA Catalog threshold criterion of 2.5 (3 for requalification exams) or as determined by the facility and agreed to by the NRC).
- 3.
J Be designed as either SRO only, RO/SRO or AO/RO/SRO.
- 4.
Include the following, as applicable:
am-J Initial conditions b.-
J Initiating cues
- c. -
J References and tools, including associated procedures de-J Validated time limits (average time allowed for completion) and specific designation of those JPMs that are deemed to be time-critical by the facility operations department
- e. ~
J Specific performance criteria that include:
(
V J
Expected actions with exact control and indication nomenclature and criteria (switch position, meter reading), even if these criteria are not specified in the procedural step (2) J System response and other cues that are complete and correct so that the examiner can properly cue the examinee, if asked (3) J Statements describing important observations that should be made by the examinee (4) J Criteria for successful completion of the task (5) J Identification of those steps that are considered critical (6) J Restrictions on the sequence of steps 13
Information Provided to Candidate c
Initial Conditions:
Plant conditions are as follows:
0 The plant is at power with the mode switch in RUN.
It is desired to vent the torus to raise DW to torus D/P.
Initiating Cue: Vent the torus using the B train of Standby Gas Treatment in accordance with PNPS 2.2.70, Section 7.3 and 7.3.3. Inform me when the task is complete.
14
Job Performance Measure Worksheet Facility:
Pilgrim Task No:
200-05-01-014 Task
Title:
MSlV Closure from Outside the JPM No:
9 Control Room WA
Reference:
29501 6 A I.08 4.0/4.0 Position:
RO/SRO Examinee:
NRC Examiner:
Date:
Method of testing:
Simulated Performance J
Actual Performance Classroom Simulator Plant J Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Li Initial Conditions:
Plant conditions are as follows:
0 0
0 A fire in the Main Control Room has required that it be abandoned.
The reactor is shut down.
The steam bypass and pressure regulation system is inoperable.
MSIVs must be closed from outside the Control Room.
Task Standard: All MSlVs are shut. The MSlVs shall be operated IAW all applicable system precautions and limitations. The system procedure shall be followed without failure of critical tasks. All critical steps must be performed in order unless otherwise noted.
Required Materials: Fuse pullers.
General
References:
PNPS 2.4.143, Rev. 29 Initiating Cue: [Candidates name], close MSlVs IAW PNPS 2.4.143, Section 4.0, Step [ I 01.
Time Critical Task: NO Validation Time: 5 minutes 1
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 1:
Review the applicable sections of the procedure.
Standard: Candidate reviews the applicable section of the procedure.
Comment: All components are located in the Cable Spreading Room, fuses may be pulled in any order.
Candidate obtains fuse puller.
Performance Step 2:
Locate Panel C941.
Standard: Candidate locates Panel C941.
Comment: Panel located in Cable Spreading Room J
Performance Step 3:
Remove fuse 16A-F1 OA.
Standard: Fuse 16A-F1 OA is removed.
Comment:
2
u PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
J Performance Step 4:
Remove fuse 16A-F11 A.
Standard: Fuse 16A-F11 A is removed.
Comment:
J Performance Step 5:
Remove fuse 16A-FI2A.
Standard:
Fuse 16A-FI2A is removed.
Comment:
L, Performance Step 6:
Locate Panel C942.
Standard: Candidate locates Panel C942.
Comment: Panel located in Cable Spreading Room 3
PERFORMANCE INFORMATION (Critical steps denoted with a check mark) 4 Performance Step 7:
Removes fuse 16A-F1 OB.
Standard: Fuse 16A-Fl OB is removed.
Comment:
J Performance Step 8:
Removes fuse 16A-F11 B.
Standard: Fuse 16A-F11 B is removed.
Comment:
J Performance Step 9:
Removes fuse 16A-F12B.
Standard: Fuse 16A-F12B is removed.
Comment:
Terminating Cue:
examiner that the task is complete.
When candidate has pulled all fuses for MSIVs, h/she should inform the 4
VERIFICATION OF COMPLETION L
JPM No.:
Examinees Name:
Examiners Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
L-Response:
Result: SAT or UNSAT Examiners signature and date:
5
L:
Job Performance Measure Quality Checklist Every JPM should:
- 1.
J Be supported by facility licensees job task analysis.
- 2. J Be operationally important (meets NRC WA Catalog threshold criterion of 2.5 (3 for requalification exams) or as determined by the facility and agreed to by the NRC).
- 3.
Be designed as either SRO only, RO/SRO or AO/RO/SRO.
- 4.
Include the following, as applicable:
- a.
J Initial conditions
- b.
J Initiating cues
- c.
J References and tools, including associated procedures
- d.
J Validated time limits (average time allowed for completion) and specific designation of those JPMs that are deemed to be time-critical by the facility operations department
- e.
J SPecific performance criteria that include:
(3)
Expected actions with exact control and indication nomenclature and criteria (switch position, meter reading), even if these criteria are not specified in the procedural step System response and other cues that are complete and correct so that the examiner can properly cue the examinee, if asked Statements describing important observations that should be made by the examinee Criteria for successful completion of the task Identification of those steps that are considered critical Restrictions on the sequence of steps 6
L Information Provided to Candidate Initial Conditions:
Plant conditions are as follows:
0 0
0 A fire in the Main Control Room has required that it be abandoned.
The reactor is shut down.
The steam bypass and pressure regulation system is inoperable.
MSIVs must be closed from outside the Control Room.
Initiating Cue: [Candidates name], close MSlVs IAW PNPS 2.4.143, Section 4.0, Step [IO].
7
Job Performance Measure Worksheet Facility:
Pilgrim Task No:
262-04-04-004 Task
Title:
Open Breakers for the RB Floor &
JPM No:
10 Equipment Drain Sump Pumps WA
Reference:
295016 AI.08 Position:
RO/SRO Examinee:
NRC Examiner:
Date:
Method of testing:
Simulated Performance Actual Performance J
Classroom Simulator Plant J Read to the Examinee:
i/ I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Plant conditions are as follows:
0 0
0 Reactor was at 100% power when a DBA LOCA occurred.
CHARMS are reading 1 5R/hr and increasing.
To support secondary containment control, the breakers for the RB floor and Equipment Drain Sump Pumps need to be opened.
Task Standard: The opening of the RB floor and Equipment Drain Sump Pump breakers shall be accomplished IAW all system precautions and limitations. The override statement shall be followed without failure of critical tasks. All critical steps must be performed in order unless otherwise noted.
Required Materials:
General
References:
EOP-04 Initiating Cue: [Candidates name], open the RB Floor and Equipment Drain Sump Pump breakers 52-13113, 52-13114, 52-13111 and 52-13112 Time Critical Task: NO Validation Time: 10 minutes 1
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
J Performance Step 1 :
Open breakers 52-1 31 13,52-I 31 1452-1 31 I 1 and 52-1 31 12.
Breaker Bus Location 52-1 31 13 B13 RB El. 3 Cond. Storage Pump Area 52-1 31 14 B13 RB El. 3 Cond. Storage Pump Area 52-1 31 11 B13 RB El. 3 Cond. Storage Pump Area 52-1 31 12 B13 RB El. 3 Cond. Storage Pump Area Position OPEN OPEN OPEN OPEN Standard:
Candidate simulates opening breakers 52-1 31 13, 52-1 31 14,52-131 1 I and 52-131 12 by moving the breaker in the down direction.
Comment: This task is covered in the override statement in EOP-04.
When the candidate has simulated moving the breakers in the down direction, cue the candidate that the breaker clicks in the down position.
Performance Step 2:
Pump breakers are open.
Inform Control Room that RB floor and Equipment Drain Sump Standard:
Candidate informs CRS that RB Floor and Equipment Sump Pump breakers are open.
Comment: Informed Control Room.
Terminating Cue:
s/he should inform the examiner that the task is complete.
When candidate has informed the Control Room of the breakers being open, d
2
-4 VERIFICATION OF COMPLETION JPM No.:
Examinees Name:
Examiners Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiners signature and date:
3
Job Performance Measure Quality Checklist Every JPM should:
- 1.
J Be supported by facility licensees job task analysis.
- 2.
J Be operationally important (meets NRC WA Catalog threshold criterion of 2.5 (3 for requalification exams) or as determined by the facility and agreed to by the NRC).
- 3.
Be designed as either SRO only, RO/SRO or AO/RO/SRO.
- 4.
Include the following, as applicable:
- a.
J Initial conditions
- b.
J Initiating cues
- c.
J References and tools, including associated procedures
- d.
J Validated time limits (average time allowed for completion) and specific designation of those JPMs that are deemed to be time-critical by the facility operations department
- e.
J Specific performance criteria that include:
Expected actions with exact control and indication nomenclature and criteria (switch position, meter reading), even if these criteria are not specified in the procedural step (1)
System response and other cues that are complete and correct so that the examiner can properly cue the examinee, if asked (2)
Statements describing important observations that should be made by the examinee (3)
(4)
Criteria for successful completion of the task (5) I/
Identification of those steps that are considered critical (6)
I/
Restrictions on the sequence of steps 4
Information Provided to Candidate Initial Conditions:
Plant conditions are as follows:
Reactor was at 100% power when a DBA LOCA occurred.
CHARMS are reading 1 SR/hr and increasing.
To support secondary containment control, the breakers for the RB floor and Equipment Drain Sump Pumps need to be opened.
Initiating Cue: [Candidates name], open the RB Floor and Equipment Drain Sump Pump breakers 52-13113, 52-13114, 52-13111 and 52-13112 L-,
5
Job Performance Measure Worksheet Facility:
Pilgrim Task No:
200-05-04-070 Task
Title:
Manual Transfer of B-6 JPM No:
11 WA
Reference:
295002 A1.03 4.414.4 Position:
ROISRO Examinee:
NRC Examiner:
Date:
Method of testing:
Simulated Performance Actual Performance J
Classroom Simulator Plant J Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.I Initial Conditions:
Plant conditions are as follows:
0 0
The Reactor is operating at 100% rated power.
Loss of B-I has occurred.
B-6 failed to transfer to B-2 due to failure of breaker 52-102 to open.
Task Standard: Energize B-6 from 8-2 IAW PNPS 5.3.32. The procedure shall be followed without failure of critical steps. Critical steps must be performed in order; other steps may be performed out of sequence.
Required Materials: None General
References:
PNPS 5.3.32, Rev. 10 Initiating Cue: [Candidates name], IAW PNPS procedure 5.3.32, Section 4.2.2, transfer B-6 to B-2.
Time Critical Task: NO Validation Time: 20 minutes I
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
~
Performance Step I: Review the applicable sections of the procedure.
Standard: Candidate reviews applicable sections of the procedure.
Comment: Transferring B-6 to B-2 is covered in Section 4.2.2, Step [Z]. All critical steps must be performed in order written unless otherwise noted.
Performance Step 2:
vice push bu ttons.
Candidate reviews caution about use of manual control switch Standard: Caution is reviewed.
Comment:
J Performance Step 3:
position, THEN OPEN OR CHECK OPEN the breaker.
At Bus B-I, RACK IN OR CHECK breaker 52-102 into CONN Standard:
simulates opening 52-1 02 by pushing the trip pushbutton on the front of the breaker.
Candidate verifies that breaker 52-1 02 is racked into CONN position, then Comment: When the candidate arrives at the breaker, cue him/her that The breaker indicates CONN, the red light is ON, and the green light is O F F After the candidate pushes the trip pushbutton, cue him/her that the green light is ON and the red light is OFF.
2
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 4:
CONN position THEN OPEN OR CHECK OPEN the breaker.
At Bus B-6, RACK IN OR CHECK breaker 52-601 racked into Standard: Candidate verifies that breaker 52-601 is racked into CONN position, then verifies52-601 is open.
Comment: Cue the candidate that 52-601 indicates CONN and that the green light is ON and the red light is OFF.
Performance Step 5:
Candidate reviews caution about changing springs.
Standard: Caution is reviewed.
Comment:
Performance Step 6:
position and closed.
Check that breaker 52-602 is both racked into the CONN Standard: Candidate verifies breaker 52-602 is racked into the CONN position, and closed.
Comment: Cue the candidate that 52-602 indicates CONN and that the red light is ON and the green light is OFF.
3
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Performance Step 7:
Candidate reviews caution about changing springs.
Standard: Caution is reviewed.
Comment:
~~
Performance Step 8:
position AND closed.
CHECK that breaker 52-202 is both racked into the CONN Standard: Candidate verifies breaker 52-202 is racked into the CONN position, and closed.
Comment: Cue the candidate that 52-202 indicates CONN and that the red light is ON and the green light is OFF.
Performance Step 9:
OPERATE the local control switches for breakers 52-1 02,52-202, 52-601 and 52-602 such that they are in the correct positions for normal-after-close or normal-after-open as indicated by the switch flags.
AFTER power has been restored to B6, CHECK position OR Standard:
Candidate takes control switch for 52-202 and 52-602 to close.
Candidate takes control switch for 52-601 to trip.
Comment: No cue is necessary prior to control switches being operated since the flag colors will be as you see them.
After taking the control switch for breaker 52-601 to trip, cue the candidate that the flag for the control switch is green.
After taking the control switch for breakers52-202 and 52-602 to close, cue the candidate that the flag for the control switch is red.
4
PERFORMANCE INFORMATION (Critical steps denoted with a check mark)
Terminating Cue:
examiner that the task is complete.
When candidate has verified all local control switches, he should inform the 5
VERIFICATION OF COMPLETION L"
JPM No.:
Examinee's Name:
Examiner's Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
\\.-
Response
Result: SAT or UNSAT Examiner's signature and date:
6
L--
Job Performance Measure Quality Checklist Every JPM should:
- 1.
J Be supported by facility licensees job task analysis.
- 2.
J Be operationally important (meets NRC WA Catalog threshold criterion of 2.5 (3 for requalification exams) or as determined by the facility and agreed to by the NRC).
- 3.
J Be designed as either SRO only, RO/SRO or AO/RO/SRO.
- 4.
Include the following, as applicable:
- a.
J Initial conditions
- b.
J Initiating cues
- c.
J References and tools, including associated procedures
- d.
4 Validated time limits (average time allowed for completion) and specific designation of those JPMs that are deemed to be time-critical by the facility operations department
- e.
J Specific performance criteria that include:
(1)
Expected actions with exact control and indication nomenclature and criteria (switch position, meter reading), even if these criteria are not specified in the procedural step System response and other cues that are complete and correct so that the examiner can properly cue the examinee, if asked (2)
J Statements describing important observations that should be made by the examinee (3)
(4)
Criteria for successful completion of the task (5)
Identification of those steps that are considered critical (6)
Restrictions on the sequence of steps 7
Information Provided to Candidate Initial Conditions:
Plant conditions are as follows:
0 The Reactor is operating at 100% rated power.
0 Loss of B-I has occurred.
0 B-6 failed to transfer to 8-2 due to failure of breaker 52-102 to open.
Initiating Cue: [Candidates name], IAW PNPS procedure 5.3.32, transfer B-6 to B-2.
8