Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19308D599 + (Discusses Violations from Insp Rept 50-302/71-01 on 710209-12)
- ML20134K508 + (Discusses Violations of NRC Requirements Identified During Insps Conducted Between Oct 1995 & Aug 1996.Apparent Violations Being Considered for Escalated Enforcement Action)
- IR 05000302/1995022 + (Discusses Violations of Procedures Re Makeup Tank Pressure at Plant.Submits Excerpts from Draft Insp Rept 50-302/95-22)
- ML19323G194 + (Discusses Violations of Separation Criteria Described in WPPSS .Requests plant-wide Field Audit of Installed Electrical Equipment & Sys.Procedures Encl)
- ML20105C012 + (Discusses Visconorust 2090 P-4 Casing Filler Inservice Tendon Surveillance.Key to Sys Is Fully Coating Tendon & Some Initial Penetration Into Tendon Bundle During Original Pumping)
- ML20087A749 + (Discusses Visit Made to Facility on 700106-08 for Purpose of Reviewing Results of Full Power Startup Tests & to Review Corrective Action Taken by Licensee on Previously Identified Items of Noncompliance)
- ML20127J621 + (Discusses Visit by Listed Individuals to Chicago Bridge & Iron Shop Facility in Birmingham,Al to Tour Plant & Discuss Fabrication & Insp Methods Employed by CB&I Prior to Shipment of Vessel in Segments to Plant for Final Erection)
- ML20154E245 + (Discusses Visit by M Morris,B Kenyon,N Carns & P Loftas to Be Held on 980918.Informs That Northeast Utils Licensee of Listed Plants)
- ML20249C777 + (Discusses Visit of Intl Respresentatives to Observe 980303 Salem NPP Emergency Planning Exercise)
- ML20234A792 + (Discusses Visit of JB Neilands of Hands Across Bay, Requesting Addl Background Info Re Commission Regulatory Processes)
- ML20248F591 + (Discusses Visit of P Blanch on Nov 14)
- ML20058P088 + (Discusses Visit to Daya Bay Nuclear Site Re Concept Safety Culture)
- ML20029E780 + (Discusses Visit to Lithuania & Meeting Re Nuclear Energy Sector Issues,Including Nuclear Safety & Shared Thoughts on Energy Sector Priorities for Lithuania)
- ML18153A480 + (Discusses Visit to Plant in Mar 1996 to Re Survey of Sf Practices & SFP Cooling Sys Design & Current Licensing Basis for Plant,Unit 1 & 2)
- ML20213D157 + (Discusses Visit to Recently Discovered Fault Near Plants. Consists of Shear Zone About 35 Ft Wide W/Alternating Layers of clay-like Matls & Breccia.Recommends That Geosciences Branch Thoroughly Evaluate New Fault)
- ML20205P737 + (Discusses Visual Exam of Failed Fuel Assemblies Discharged at End of Cycle 10,per Util 870902 Commitment)
- ML20236Q029 + (Discusses Visual Insp Performed of Secondary Side of Sgs. Insp Performed as Result of Degradation Observed in Secondary Side of SGs During Last (Cycle 9) Refueling Outage)
- ML20216B894 + (Discusses Visual Insp Performed on Secondary Side of Sgs, as Result of Degradation Observed in Secondary Side of Unit 3 SGs During Last Refueling Outage.Copy of Engineering Guide for SG SSI, Encl)
- ML17303B080 + (Discusses Visual Insp of Feedwater Sparger,Per 870701 Submittal of Piping Verification Test Summary.Insp Will Not Be Done,Based on Results of Units 1 & 3 Insp & Summary of Encl Engineering Review of Design & Operation Parameters)
- ML19332E988 + (Discusses Visual Insp of Hafnium Rod Cluster Control Assemblies During Refuel-2 in Fall 1987.Results Indicate Guide Card Fretting Wear Per NRC Info Notice 87-019.All Hafnium Rods Replaced W/Silver/Indium/Cadnium Assemblies)
- ML19325E329 + (Discusses Visual Insp of Pressurizer Surge Line Conducted, Per Item 1.a of NRC Bulletin 88-011.Continued Operation of Facility Surge Line Acceptable Based on Westinghouse Structural Assessment)
- ML20151Z233 + (Discusses Visual Insp of Steel Containment Vessel & Shield Bldg Before Facility Restart to Ensure That No Abnormal Degradations & Structural Deterioration Occurred During Extended Outage)
- ML20106B613 + (Discusses Visual Insp of Top Longitudinal Tendons,Per 850115 Meeting Request.Visual Insp of 30% of Longitudinal Tendons for Buttonheads Noted.Inconsistency Exists Between Last Mapping of Raised Buttonheads & Current Insp Results)
- TXX-4524, Discusses Visual Reinsp of Painted Nonpressure Boundary Welds ASME-NF & Aws.Evaluation Will Be Conducted W/O Removal of Protective Coatings + (Discusses Visual Reinsp of Painted Nonpressure Boundary Welds ASME-NF & Aws.Evaluation Will Be Conducted W/O Removal of Protective Coatings)
- ML19242C981 + (Discusses Vitrification Problems.Vitrification Is Better Method of long-term Radwaste Containment than Shale Fracturing or in-tank Solidification)
- ML20134E749 + (Discusses Vogtle Commission Paper)
- ML20134E819 + (Discusses Vogtle Response to Enforcement Action 91-141 Re Opening of Chemical Injection Valves at Vogtle)
- ML20154F917 + (Discusses Vogtle Unit 2 Readiness Review Program Status Rept Through 880815.Status of Modules & Review Schedule Encl)
- ML19338C756 + (Discusses Void Formation in Vessel Head During 800611 Natural Circulation Cooldown Event.Requests Opinion Re Potential for Voiding Phenomenon in C-E Designed NSSS)
- ML17208A941 + (Discusses Void Formation in Vessel Head During 800611 Circulation Cooldown Event.Requests Technical Opinion Re Potential Void Formation in NSSS Designed by Exxon Nuclear Corp Under Similar Conditions)
- ML19338C758 + (Discusses Void Formation in Vessel Head During 800611 Natural Circulation Cooldown Event.Requests Opinion Re Potential for Voiding Phenomenon in Util Designed NSSS)
- ML19338C837 + (Discusses Void Formation in Vessel Head During 800611 Natural Circulation Cooldown Event.Requests Opinion Re Potential for Voiding Phenomenon in B&W Designed NSSS)
- ML19338C757 + (Discusses Void Formation in Vessel Head During 800611 Natural Circulation Cooldown Event.Requests Opinion Re Potential for Voiding Phenomenon in Westinghouse Designed NSSS)
- ML19296C835 + (Discusses Void in Concrete of Reactor Cavity/Primary Shield Wall Region in Response to .Void Was Repaired & Not Considered Reportable.No Steel Was Exposed as Only Outer Concrete Cover Was Affected)
- ML19260A125 + (Discusses Voids in South 180 Degree Ring Girder Noted in Insp Rept 50-289/72-07.Rept on Problem to Be Forwarded within Three Weeks)
- ML18153D103 + (Discusses Voluntary Entry Into TS 3.0.1 for Surveillance Testing of Nonessential Svc Water Isolation Actuation Logic,Per Revised & Reformatted Amends 165 & 164 to Licenses DPR-32 & DPR-37,respectively)
- ML16342B347 + (Discusses Voluntary Entry Into Tech Spec Action Statements (F14482H1) (F14529H2).NRR Guidance Re Intent of Tech Spec Action Statements Encl,For Info.Future Rev to Reg Guide 1.16 Should Reflect the 30-day Reporting Guidance)
- ML20249C791 + (Discusses Vulnerabilities Existing in Commission Present Emergency Preparedness Process Required to Assure Training, Capabilities & on Call List Availability of Presidential Appointees in Case of Emergency)
- ML20236T310 + (Discusses W 941031 Submittal by Ltr (NTD-NRC-94-4330) of AP600 Notrump Core Makeup Tank Preliminary Validation Rept & Requests That Info Be Withheld from Public Disclosure. Determined Info Proprietary & Will Be Withheld from Public)
- ML20196K720 + (Discusses W Chisholm Request for NRC Representative Familiar with NRC Policies on Assured Isolation to Speak at Hearing to Be Held on 990308 in Austin,Tx)
- ML20140B891 + (Discusses W Decision Not to Perform Tests for Verifying FW Hammer Occurrence in AP600 Design.Nrc Finds Decision Unacceptable)
- ML19260E009 + (Discusses W Finan 600929 Trip to Boston Re AEC Need for Independent Review Group for Examining Aerospace Nuclear Program Health & Safety Aspects.Responsibility for Safety Review Accepted)
- ML20198B460 + (Discusses W Ltr NTD-NRC-95-4556,dtd 950918,provided as Status Rept on Proprietary Matl Submitted to NRC to Support AP600 Design Review Effort.Proprietary Info in Encl Have Been Removed from AP600 Docket File & Being Returned)
- ML15244A703 + (Discusses W Lyon 911121 Memo Re Observations & Perspective on Oconee Shutdown Operations.Augmented Insp Team Review Scheduled Pilot Shutdown Risk Team Insp Beginning Wk of 911202)
- ML20094P497 + (Discusses W Marshal Telcon Re Permanent Dewatering Well Being Drilled at Northeast Corner of Diesel Generator Bldg on 820519.Drilling Mud Flushed Into Line When Drilling Line Broke.No Further Comment Necessary)
- ML20134B637 + (Discusses W Re Request for Withholding Proprietary Matl Presented at 961112 Meeting from Public Disclosure.Request Approved)
- ML19322E675 + (Discusses W Scanlon Info Request.Adding W Scanlon to Distribution List for All Documents Re Licensing Not Feasible Due to Vol of Licensing Actions & Related Correspondence.Dept of Public Health Should Be Contacted)
- ML20211K043 + (Discusses W/Comments Re Rev to MD 5.6, Integrated Matl Performance Evaluation Program)
- ML20247H592 + (Discusses W/Encl Scenario Package for Cooper Nuclear Station Exercise Scheduled for 980609.Based on Review,Nrc Determined That Exercise Scenario Appropriate to Meet Emergency Plan Requirements & Onsite Objectives)
- ML19323G570 + (Discusses WASH-1400 Core Melt Release Fraction Calculation Error.Table VII G-1 Removal of Fission Products from Melt by Sparging W/Carbon Dioxide from Concrete Decomposition Incorrect.Suggests Review of Assessment)
- ML20206U038 + (Discusses WCAP-11145,in Response to 850626 Request for Small Break LOCA Analysis.Analysis Unnecessary as WCAP-11145 Complies W/Tmi Action Plan Item II.K.3.31 on Generic Basis Per Generic Ltr 83-35)