Discusses Violations from Insp Rept 50-302/71-01 on 710209-12
ML19308D599
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/16/1971
From: Jennifer Davis
US ATOMIC ENERGY COMMISSION (AEC)
To: Rodgers J
FLORIDA POWER CORP.
Shared Package
ML19308D584 List:
References
NUDOCS 8003040999
Download: ML19308D599 (2)


Text

'

(-)

v

)

f 1

0

,./p;.,.

U.':IT C ?.T;.T:s 4

ATOMIC ZNERGY COMMISSION

.I OtVIstoN CF CoMPL. ANCn

e T

y REGION 11 - SutTE S13 44 g+>

230 PE ACHTREE STRICT. N OR T M w EST Dfft d TN. 416 4 53 7 AT LANT A. oEoRGI A 30303 March 16, 1971 Florida Power Corporation Attn:

Mr. J. T. Rodgers Nuclear Project Manager 101 Fifth Street South P. O. Box 14042 St. Petersburg, Florida 33733 Gentlemen:

This letter relates to the discussions Fr. Kelley of this office held with Messrs. Bennett and Frcats during and at the conclusion of the inspection O

conducted on February 9 through 12, 1971, regarding the construction activ-ities authorized by AEC Construction Per=1t No. CPPR-51 for the Crystal k

River facility.

As noted during the discussions, apparent deficiencies were identified in-volving an item not in cenformance with Appendix B to 10 CFR 50 cf the AEC Regulations, " Quality Assurance Criteria for Nuclear Power Plants." The item it as follows:

The Code of Federal Regulations, 10 CFR Part 50, Appendix B, QA Criterion V, requires that activities affecting quality shall be prescribed by docu=ented instructions, procedures or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures,or drawings.

Instructions, procedures,.or drawings shall include appropriate quantitative or qualitative acceptance criteria for deter =ining that i=portant activities have been accomplished.

Contrary to the above, the FPC QA progra= failed to function

~

adequately as indicsted by the following: The toriconical section of the containment liner was erected by CELI with the top edge above and below the elevation 103'-0" stated on the erection drawings. The erection of the cylindrical courses continued after trimming that portion of the toriconical section above the 103'-0" elevation leaving two gaps 220 of the circu=ference with a height of up to two inches. CB&I Special Repair Procedure SEP-1L states l

G ACP 8008040 p.o 7

--c, s_

A.g + ** *e

I Florida Pover Corporation "erch 16, 19~1 that a six-inch-vide plate of identical rntorial to the liner plate vill be inserted into the arcs where the toriconical sectica vac below the 103'-0" cicyction and is cut to elevation 102'-6".

The procedure does not includo en engineerin;; analysis of the distor-tion that caused the toricenical cection to be below the required 103'-0". elevation.

Please provide us, vithin 30 days, vith your ccer.ents concerning these itens and any stops which have been or vill ta tchen to correct ther. and to nini-nico recurrences. Your reply should cephcaire, in partict:lar, c.ny appropricta 4

changes that have been or vill be r.cde to improve the offectivenoca of your quclity c.ssuranco program.

{

Ehould you'have-any questicas ccnceming the natters discuccad in this letter, yc::. =sy cc=:n:nicate directly with this offica.

Vc:7 truly yours, 5 i ! 5-.-d by

.G La John G. Davic CO:II:WDK Director 4