Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Discusses Unloading Analysis". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20107M775  + (Discusses Underestimation of Atmospheric Dispersion Conditions at Exclusion Area Boundary for Assessments of Consequences of Radioactive Release for Dba,Per 10CFR100, Backfit Requirement 29 & Draft SER Section 2.3.4)
  • ML13317B326  + (Discusses Underestimation of Refill Vol Assumed in Large Break LOCA Analysis.Sufficient Margin Exists to Assure Safe Plant Operation for Cycle 11 Pending Rev to Tech Spec 3.11 to Adjust Axial Offset Limits Per Administrative Controls)
  • 1CAN028305, Discusses Understanding Re 821210 Order for Mod to OL Concerning Inadequate Core Cooling,Per 830127 Meeting W/Nrc. Util 830117 Request for Extension of Deadline for Hearing Requests Will Be Withdrawn.Nrc Confirmation Requested  + (Discusses Understanding Re 821210 Order for Mod to OL Concerning Inadequate Core Cooling,Per 830127 Meeting W/Nrc. Util 830117 Request for Extension of Deadline for Hearing Requests Will Be Withdrawn.Nrc Confirmation Requested)
  • A06492, Discusses Understanding Re Status of App R Mods.Required Implementation Schedule Met & No Interim Compensatory Measures Advocated by Util or Approved by NRC  + (Discusses Understanding Re Status of App R Mods.Required Implementation Schedule Met & No Interim Compensatory Measures Advocated by Util or Approved by NRC)
  • ML20032C632  + (Discusses Understandings Reached During 811015 Meeting & 811028 Telcon W/Util Re Completion of Emergency Preparedness Matters,Including Revision of Emergency Organization & Emergency Plan & Implementing Procedures)
  • ML13333A334  + (Discusses Understandings Reached at 781006 Meeting Re Proposed Site Specific Earthquake Model for Plant. Acceptability Is Not Yet Determined)
  • ML19305D511  + (Discusses Undetectable Failure in Engineered Safety Features Actuation Sys.Utils Are Investigating Hardware Changes That May Preclude Further Testing,Provided That Changes Are Feasible.Otherwise,Tests Will Continue)
  • ML19305B959  + (Discusses Undetectable Failure in Engineered Safety Features Actuation Sys.Failure of P-4 Permissive Circuit in Both Redundant Protection Trains Could Result in Failure of Sys to Automatically Initiate Protective Function.Details Encl)
  • ML20195H097  + (Discusses Une 990407 Request That Proprietary Document Entitled, Thermal Stability Assessment - Electrosleeved Tubes, Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure)
  • ML20235U061  + (Discusses Unescorted Access Authorization at Facility for NRC Personnel)
  • ML20059H060  + (Discusses Unescorted Access to Licensee Facilities & fitness-for-duty Program,Per .Nrc Regulations Do Not Prohibit Licensee from Accepting Access Authorization Program of Another Licensee,Contractor or Vendor)
  • ML20039F605  + (Discusses Unescorted Contractor Personnel & Quality of Screening Processes Performed by Contractors Seeking Access to Sites.Procedure Requirements for Background Screening for Contractor Personnel Will Be Clarified)
  • ML20126D523  + (Discusses Unfair Billing of Toothman-Orton Engineering Co for Sevices Not Rendered.Assistance W/Constituent Problem Requested)
  • ML19331A715  + (Discusses Unfair Hardship & Financial Penalty Imposed by ASLB Refusal to Reschedule Prehearing Conference & to Conduct Conference in Chicago,Il)
  • ML17347B606  + (Discusses Unimplemented USIs at Facilities,Per Generic Ltr 89-21.List Representing NRC Assessment of USI Implementation Encl.W/O Encl)
  • ML19330A207  + (Discusses Unique Atomic Reactor Power Plant Which Save Time & Space & Solve Electric Energy Problems in Two Yrs)
  • B16832, Discusses Unit 2 Independent Corrective Action Verification Program Re Tier 1 Insp Readiness.Attached Schedule Dates Continue to Be Flexible as Util Continues to Finalize Work Scope in Each Area  + (Discusses Unit 2 Independent Corrective Action Verification Program Re Tier 1 Insp Readiness.Attached Schedule Dates Continue to Be Flexible as Util Continues to Finalize Work Scope in Each Area)
  • ML19317F000  + (Discusses Unit 2 Loss of Offsite Power on 740105.Caused by Grid Fault.B&W Is Analyzing Event)
  • ML20134P907  + (Discusses Unit 2 Refueling Shutdown for Cycle 12 Reload, Scheduled to Begin in Early Oct 1985.Westinghouse 14x14 Optimized Fuel Assemblies Will Be Used,Per License Amends 86 & 90 for Units 1 & 2,respectively)
  • ML20080F788  + (Discusses Unit 2 Shut Down for Refueling at End of Cycle 20 Operation on 940924)
  • ML19224D804  + (Discusses Unit 2,Cycle 3 Reload Core Design.Preliminary Review Indicates No Unreviewed Safety Questions & No Tech Spec Changes required.C-E Review Continues)
  • ML20197F041  + (Discusses United Nuclear Corp (Unc) Misclassification of 860314,21 & 0411 Submittals.Unc Informed & Will Resubmit Info)
  • ML20237J831  + (Discusses Univ Plan to Submit License Application for Slowpoke-2 Research Reactor.Nrc May Grant Exemption to 10CFR50.54(k) Re Presence of Senior Reactor Operator During Reactor Operation Based on Review of License Application)
  • ML19206B285  + (Discusses Unlikely Possibility of Burnable Poison Rod Assembly Incident Occurring.Recommends Installation of Positive Retention Devices as Best Course of Action)
  • ML19256A718  + (Discusses Unlimited Purging Re Possible Failure of Automatic Isolation of Large Diameter Containment Purge Penetrations Used During Power Operations.Concludes That Bypass & Override Conditions Can Be Identified)
  • ML20033H057  + (Discusses Unplanned Radiation Exposures Due to Mishandling of Unidentified Highly Radioactive Sources.Info Notice Needed to Focus More Attention on Subj.Input & Suggestions Requested by 900420)
  • JAFP-93-0309, Discusses Unreported Change in Physical Status of Licensed Operators.Caused by Lack of Sufficient Administrative Guidance for Tracking Licensed Operator Status W/Respect to ANSI Requirements.Improved Checklist to Be Used  + (Discusses Unreported Change in Physical Status of Licensed Operators.Caused by Lack of Sufficient Administrative Guidance for Tracking Licensed Operator Status W/Respect to ANSI Requirements.Improved Checklist to Be Used)
  • ML20140C012  + (Discusses Unresolved Issue Re Closure Testing of Normally Closed Check Valves That Perform Safety Function in Closed Position,Identified in Insp Rept 50-483/85-07.Testing of Valves Appropriate)
  • ML20117P943  + (Discusses Unresolved Item 14 Re Potential Facility Configuration Control Problems Caused by Poorly Controlled Maint Activities,Per Insp Repts 50-317/89-200 & 50-318/89-200)
  • IR 05000313/1994024  + (Discusses Unresolved Item 313/9424-02 Contained in Insp Repts 50-313/94-24 & 50-368/94-24.Unresolved Item Consists of Issues Re Operability Requirements of ANO-1 Pressurized SVs & Reporting Requirements.Confirms C/As to Be Taken)
  • IR 05000338/1990027  + (Discusses Unresolved Item 90-27-01 Noted in Insp Repts 50-338/90-27 & 50-339/90-27.Licensee Mgt Should Provide Workers W/Direct Access to or Copies of All Records & Documents Re Initial fitness-for-duty Test Results)
  • IR 05000206/1985012  + (Discusses Unresolved Item Identified in Insp Rept 50-206/85-12 Re Performance of as-found Analysis for Type a Containment Integrated Leak Rate Test.Nrc Position Should Be Clarified Before Notice of Violation Issued)
  • IR 05000263/1998005  + (Discusses Unresolved Item Identified in Section S3.b.(1) of Insp Rept 50-263/98-05 Re Search of Matls Entering Protected Area.Concludes That Sealed Containers Constitute Category of Matl Exempted from Search Prior to Entering Protected Area)
  • AECM-83-0629, Discusses Unresolved Item Noted in Insp Repts 50-416/83-06 & 50-417/83-03 Re Failure of Personnel to Complete Cold License Operator Qualification Card Per 810903 Application for Operator Licenses.Completion of Cards Unnecessary  + (Discusses Unresolved Item Noted in Insp Repts 50-416/83-06 & 50-417/83-03 Re Failure of Personnel to Complete Cold License Operator Qualification Card Per 810903 Application for Operator Licenses.Completion of Cards Unnecessary)
  • ML17209A656  + (Discusses Unresolved Items from Fire Protection Safety Evaluation.Requests Proposal within 60 Days Re Tech Spec Changes Needed to Reflect Fire Protection Mods Reported in .Supporting Documentation Encl)
  • ML19264A098  + (Discusses Unresolved Matters Re Followup of Bioassay Repts for Exposure to I-125 & Tritium.Results of Evaluation Encl)
  • IR 05000454/1996006  + (Discusses Unresolved Security Item Identified in Section S.3 of Insp Repts 50-454/96-06 & 50-455/96-06 Re Unescorted Access Authorization Program.Issue Has Been Reviewed & Resolved)
  • ML20199E656  + (Discusses Unresolved Security Item Re Adequacy of Compensatory Measures Implemented for Section of Vehicle Barrier Sys.Issue Briefly Described as Listed)
  • ML18057A980  + (Discusses Unreviewed Safety Question Re Potential for Leakage of Containment Sump Water to Safety Injection & Refueling Water Tank During Max Hypothetical Accident)
  • GO2-89-176, Discusses Unreviewed Safety Question Re Standby Gas Treatment,Specifically Establishing Secondary Containment Pressure within 120 of Initiation.Calculations Indicate That post-accident Doses Remain Below 10CFR100 Limits  + (Discusses Unreviewed Safety Question Re Standby Gas Treatment,Specifically Establishing Secondary Containment Pressure within 120 of Initiation.Calculations Indicate That post-accident Doses Remain Below 10CFR100 Limits)
  • ML20037A607  + (Discusses Unreviewed Safety Question Re 770207 Boron Dilution Incident.Licensees Should Be Directed to Investigate Potential for Boron Dilution W/Rept on Findings within 60 Days)
  • ML20100L128  + (Discusses Unsafe Conditions & Labor Disputes at Plant)
  • ML20067E218  + (Discusses Unsatisfactory Performance Testing & Forwards Findings & Corrective Actions Taken by Smithkline Beecham Clinical Labs)
  • ML20245H932  + (Discusses Unsatisfactory Plant Requalification Program & Lists Util Commitments for Accelerated Remedial Training for Personnel Who Failed Exam)
  • ML20202G243  + (Discusses Unsettling Implications of Water Hammer Incident. Uncoupling of Util Licensing Engineering from Operations Seems to Ignore Lessons Learned from TMI)
  • ML20090A733  + (Discusses Unsuccessful Attempt to Contact W Reinmuth Re 800715 Memo to G Fiorelli About Bolting Problems & Proposed Bolting Reg Guides)
  • ML20204J162  + (Discusses Unsuccessul Attempts to Contact Alleger A-29 Re Concerns Raised Regarding Const at Facilities)
  • ML20134E069  + (Discusses Untested & Unproven Safety Equipment at Vermont Yankee)
  • ML20128Q438  + (Discusses Untimely Transmittal of Commission Paper on DOE Advisory Panel on Alternative Means of Financing & Managing Radwaste Facilities.Paper Represents More Positive Position by Panel than Was Previously Discussed)
  • ML17292B415  + (Discusses Unusual Event on 980617,in Response to Extensive Flooding of 2 ECCS Pump Rooms in Reactor Bldg from Failed Fire Main Valve.J Shackelford Appointed as Leader of Ait. Sequence of Events Timeline Listed)