Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Discusses Restart Plan for Millstone Unit 3". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20209E695  + (Discusses Response to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. Recommends Review of New Database Diskettes on Listed Website.Comments Due by 990901 or Data Entered Into Rvid for Plant Will Be Acceptable)
  • ML17146B149  + (Discusses Response to Request for Addl Info Re GL 92-01, Rev 1,supp 1, Reactor Vessel Structural Integrity)
  • ML17059B592  + (Discusses Response to Request for Deferral Re NRC Bulletin 96-003.Util Requested to Install High Capacity Passive Suction Strainers While Shutdown for Core Shroud Insp,But No Later than 981231)
  • ML20058K685  + (Discusses Response to Request for Info Re Postulated Pipe Failures Outside Containment)
  • ML20249A353  + (Discusses Response to Request for Interpretation of TS Requirements for Channel Calibr of Resistance Temp Detectors & Thermocouples)
  • ML20198H502  + (Discusses Response to Request for Relief from ASME Code Section III Requirements for Plant,Unit 1)
  • ML16162A424  + (Discusses Response to Util 820525 Submittal Re Proposed Water Inventory Monitoring Sys & Relationship to Dec 1982 Order on Instrumentation to Detect Inadequate Core Cooling. Response Should Be Expedited)
  • ML20199E168  + (Discusses Response to Violations Noted in 860508 Insp Rept 50-410/86-09.Extension Requested on 860606 to Allow for Preparation of Formal Response & Review & Approval by Util Mgt)
  • ML20101C492  + (Discusses Response to Violations Noted in Insp Repts 50-454/86-31 & 50-455/86-17)
  • ML20141J339  + (Discusses Response to Violations Noted in Insp Repts 50-282/97-02 & 50-306/97-02 Re Inadequate Procedural Control for Mgt of Heavy Loads)
  • ML20217N150  + (Discusses Response to Yankee Atomic Electric Co Answer to Request for Hearing of Franklin Regional Planning Board. W/Certificate of Svc)
  • ML20217K780  + (Discusses Responses to GL 92-01,Rev 1,Supplement 1, Rv Structural Integrity, Issued in May 1995.Requests Reevaluation of RPV Weld Chemistry Values Previously Submitted as Part of Licensing Basis)
  • ML20217K753  + (Discusses Responses to GL 92-01,Rev 1,Supplement 1, Rv Structural Integrity, Issued May 1995.Requests Reevaluation of RPV Weld Chemistry Values Previously Submitted as Part of Licensing Basis in Light of Recent Owners Group Repts)
  • ML20199H894  + (Discusses Responses to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Controls, for Plant,Units 1 & 2)
  • ML16161B097  + (Discusses Responses to IE Bulletins 79-05C & 79-06C Re Need for Tripping Reactor Coolant Pumps for Certain Small Break Locas.Recent Events Force More Prompt Solution to Problems.Meeting Necessary to Resolve Issues)
  • ML20073T078  + (Discusses Responses to NRC 820625 & 0730 Questions Re Usage of Itt Grinnell Pipe Clamps.Response to 820914 Questions Delayed Pending Minor Clamp Mods & Retesting Program.Meeting Suggested to Insure Closure of Issue)
  • ML20079M723  + (Discusses Responses to NRC 820625 Questions Re Use of Pipe Clamps.Results of Test Program Inconclusive.Results of Effort Using Stresscoat Will Be Available by June 1983)
  • W3P82-0720, Discusses Responses to NRC Questions 10.14 & 10.33 Re Analysis of Effects of Dropping Any Load Handled by Containment Polar Crane.Proposed Commitments to Heavy Loads Listed.Fsar Will Be Changed to Reflect Revision  + (Discusses Responses to NRC Questions 10.14 & 10.33 Re Analysis of Effects of Dropping Any Load Handled by Containment Polar Crane.Proposed Commitments to Heavy Loads Listed.Fsar Will Be Changed to Reflect Revision)
  • ML20212J443  + (Discusses Responses to RAI Re GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity)
  • ML20128N053  + (Discusses Responsibilities Toward Patients Involved in Medical Misadministrations,In Response to 930205 Request)
  • ML18101B291  + (Discusses Responsibilities Under 10CFR21,10CFR50.72 & 10CFR50.73 Re Litigations for Plant Units 1 & 2)
  • ML15261A154  + (Discusses Responsibility of Licensees Through SALP Program. Invitation to 980108 Meeting Re Plant Performance Over Past 18 Months Extended.Emergency Prepardness Included in Plant Support Category of Program)
  • ML19308B453  + (Discusses Responsibility of Licensing Assistant for Facilities.P Kreutzer Will Handle Licensing Assistant Duties for All Matters Re TMI-1 & Specific Functions for TMI-2)
  • ML20072B305  + (Discusses Restart Issues)
  • ML20056G743  + (Discusses Restart Plan Submitted on 930520.Plan Found Acceptable)
  • ML20117M494  + (Discusses Restart Plan for Millstone Unit 3)
  • ML20134E348  + (Discusses Restart of Connecticut Yankee Nuclear Power Plant W/All Open Items Identified)
  • ML19208C646  + (Discusses Restart of Facility.Nrc Should Ensure Continued Adherence to Safety Stds at Facility Through Prudent Monitoring & Mutual Cooperation)
  • ML20154E181  + (Discusses Restart of Plant,Per NRC 870427 Confirmation of Action Ltr Ordering Continued Shutdown Until Problems Identified in SALP Reviews Resolved.Edo Scheduled to Address Commission in Aug 1988 on Licensee Readiness for Restart)
  • ML20054G034  + (Discusses Restart of TMI-1 & Decontamination of TMI-2)
  • ML19339A983  + (Discusses Restart of TMI-1 & Requests Including TMI-1 in Util Rate Base to Lessen Financial Burden on General Public Utils)
  • ML19221A323  + (Discusses Restrictions on Use of Masks W/Cartridges During Decontamination of Auxiliary/Fuel Bldg)
  • ML19289F867  + (Discusses Restrictions on Use of Masks W/Matl Surveillance Assembly 88182 Cartridges During Decontamination of Auxiliary 15el Bldg)
  • ML19253A465  + (Discusses Restrictions on Use of Respiratory Protection Masks During Decontamination of Auxiliary Fuel Bldg)
  • ML20142A029  + (Discusses Restructuring of Nuclear Energy Business Operations,As Noted.Nuclear Fuel Engineering & Mfg Dept Added & Nuclear Fuel Mfg Dept Name Changed to Nuclear Fuel & Components Mfg,Effective 860129)
  • AECM-88-0130, Discusses Restructuring of Util Organization to Strengthen Mgt Capabilities & Reduce Operating Costs  + (Discusses Restructuring of Util Organization to Strengthen Mgt Capabilities & Reduce Operating Costs)
  • ML20107C786  + (Discusses Resulst of Refined Cost Estimate for Liquid & Solid Sys Mod Reflecting Design Details Developed to Date & Present Market Conditions)
  • ML19322C746  + (Discusses Result of Meeting W/B&W in Lynchburg,Va Re Evaluation of NRC Licensing Requirements for Operators.Poses Questions Re Airline Pilots Association Training,& Met Ed Ignorance of Superiority of Other Utils in Training)
  • ML20128G152  + (Discusses Result of OI Analysis of Gpc Response to Enforcement Action Per Conclusions in OI Rept, Case 2-90-020R)
  • ML20195H072  + (Discusses Result of Review of Draft OSP Procedure SA-118, Orientation Meeting for New Agreement States)
  • AECM-82-314, Discusses Result of Util Preliminary Assessment of NSSS & Balance of Plant Equipment Located Inside Containment Re Potential Impact of Variable Pool Swell Response Spectra on Seismic Qualification Review Team Qualification  + (Discusses Result of Util Preliminary Assessment of NSSS & Balance of Plant Equipment Located Inside Containment Re Potential Impact of Variable Pool Swell Response Spectra on Seismic Qualification Review Team Qualification)
  • ML20078R329  + (Discusses Results & Conclusions of Osre Conducted During 940815-18.Weakness Noted as Being Unique & Only Possible During Specific Time Periods)
  • ML20059K054  + (Discusses Results from Research Conducted at Oak Ridge Laboratory to Examine Potential Sys Failures in Candu 3 Design During Normal Reactor Operation & Postulated Accidents Including That Result in Core Damage)
  • ML20210B396  + (Discusses Results from Snubber Testing for Review of 860731 Application for Amends to Licenses DPR-53 & DPR-69 Re Snubber Insp Interval & Functional Test Requirements.Error in Tech Spec Numbering Noted)
  • ML20058P056  + (Discusses Results of 403rd Meeting of ACRS on 931104-06 Re Presentations of NRC Staff & GE Nuclear Energy on SECY-93-289 Concerning Issuance of Draft Final Pser for Prism Reactor)
  • ML19294A517  + (Discusses Results of 781101-02 Insp.Notice of Violation & Inspec Rept 70-0025/78-06 Withheld (Ref 10CFR2.790))
  • ML19249B698  + (Discusses Results of 790713 & 18 Meetings W/Licensee at Site.Licensee Agrees to Take Appropriate Action to Correct Problems Identified in TMI Radiation Protection Program)
  • ML20080P280  + (Discusses Results of 810905 Testing of Onsite safety-related Electrical Distribution Sys.Acceptability of Voltage Conditions & Undervoltage Relay Setting on Safety Electric Distribution Sys Reconfirmed)
  • ML20137X243  + (Discusses Results of 851008 Meetings Re Facility Actions in Response to 850607 SALP Rept & Plans for Licensing Reactor Operations.Problems Identified in SALP Rept Resolved Technically,W/One Exception Re Tie Wraps)
  • ML20137S983  + (Discusses Results of 851025 Meeting at Region I Ofc to Review Status of Order Modifying License Based on Final Radiation Protection Oversight Committee Rept.Committee Will Continue to Function During 1986 Outage & Rept Monthly)
  • ML17346B163  + (Discusses Results of 851101 Facility Visit.Improvements to Physical Plant,Qa,Training & Maint Mgt Noted.Interpretation of Equipment Qualification Generic Ltr Discussed)