Discusses Results of 403rd Meeting of ACRS on 931104-06 Re Presentations of NRC Staff & GE Nuclear Energy on SECY-93-289 Concerning Issuance of Draft Final Pser for Prism Reactor
ML20058P056
Person / Time
Issue date: 11/10/1993
From: Wilkins J
Advisory Committee on Reactor Safeguards
To: Selin I, The Chairman
NRC COMMISSION (OCM)
Shared Package
ML20058P054 List:
References
ACRS-GENERAL, NUDOCS 9312230023
Download: ML20058P056 (3)


Text

...,

h' o

UNITED STATES i

, J

9 NUCLEAR REGULATORY COMMISSION j

ADVISORY COMMITTEE ON REACTOR SAFEGUARDS o

W ASHINGTON, D. C. 20555

...../

't, November 10, 1993 i

The Honorable Ivan Selin Chairman U.S.

Nuclear Regulatory Commission Washington, D.C.

20555

Dear Chairman Selin:

SUBJECT:

SECY-93-289, " ISSUANCE OF THE DRAFT PREAPPLICATION SAFETY EVALUATION REPORT (PSER) FOR THE POWER REACTOR INNOVATIVE SMALL MODULE (PRISM) LIQUID-METAL REACTOR" During the 403rd meeting of the Advisory Committee on Reactor Saf eguards, November 4-6, 1993, we heard presentations by represen-tatives of the NRC staff and General Electric Nuclear Energy on the subject SECY paper that proposes the issuance of a draft final Preapplication Safety Evaluation Report (PSER) for the Power Reactor Innovative Small Module (PETSM) Reactor for comment.

We also had the benefit of the documents referenced.

Consistent with the Commission's advanced reactor policy, the staff has, to the extent feasible, used existing regulations to formulate criteria and procedures for review of this design. Where necessary the staff has created additional criteria and procedures, following the guidance furnished by the Commission in the Staff Requirements Memorandum dated July 30, 1993, that dealt with key policy issues for advanced reactors.

Because the staff review was based on a conceptual design, the PSER did not, nor was it intended to, result in an approval of the design.

Instead it identified certain key safety issues, provided some guidance on applicable licensing criteria, assessed the adequacy of the preapplicant's research and development programs, and concluded that no obvious impediments to licensing the PRISM design had been identified.

Although our own review of the PSER was less detailed than would have been appropriate for a safety evaluation report on an actual application, we believe that the staff has satisfactorily fulfilled its role in the preapplication process.

We agree with the staff's proposal to provide the PSER to the U.S. Department of Energy.

~ ~

+-

9312230023 931206h EDO --- 009518 PDR ACRS OENERAL pg J

r-.

e, t

The Honorable Ivan Selin 2

November 10, 1993 Dr.

William J.

Shack did not -participate in the committee's.

deliberation regarding this matter.

sincerely, f

kM.

J.

Ernest Wilkin, Jr.

Chairman Peferences:

1.

SECY-93-289, dated October 19, 1993., Memorandum from James M.

Taylor, NRC Executive Director for Operations, for the Commissioners,

Subject:

Issuance of the Draft Preapplication Safety Evaluation Report (PSER) for the Power Reactor Innova-tive small Module (PRISM) Liquid-Metal Reactor 2.

U.S. Nuclear Regulatory Commission, NUREG-1368, "Preapplica-tion Safety Evaluation Report (PSER) for the Power Reactor Innovative Small Module (PRISM) Liquid Metal Reactor," October 1993 3.

Staff-Requirements Memorandum dated July 30, 1993,.from S.

Chilk, Secretary of the Commission, NRC, to J. M. Taylor, NRC Executive Director for Operations,

Subject:

SECY-93-092 Issues Pertaining to the Advanced Reactor-(PRISM, MHTGR, and' PIUS) and CANDU 3 Designs and Their Relationship to Current Regulatory Requirements

~

jf k

9"

.y b b WJ aos EDO Principal Correspondence' Control-FROMs.-

DUE: 12/16/93 EDO CONTROL: 0009518 DOC DT::11/10/93 FINAL REPLY:-

1J. Ernest Wilkins, Jr.

)ACRS.

1T08' U

Chairman Selin

? FOR SIGNATURE OF :

Executive Director DESC:.

ROUTING:

SECY-93-289, " ISSUANCE-.0F-TH";. DRAFT PREAPPLICATION Taylor-

- SAFETY EVALUATION REPORT (PSER)-FOR THE POWER.

Sniezek-REACTOR INNOVATIVE SMALL MODULE (PRISM) LIQUID-Thompson METAL REACTOR" Blaha-Mat Taylor Bernero, NMSS

-DATE: -11/12/93 Beckjord,.RES Jordan, AEOD

' ASSIGNED TO:

CONTACT:

OGC

.NRR Murley SPECIAL INSTRUCTIONS OR REMARKS:

/-

PREPARE RESPONSE TO ACRS FOR EDO SIGNATURE.

PUT-COMMISSIONERS AND SECY ON CC (SHOWN ON

/

- ORIGINAL) - FOR~ REPLY.

USE SUBJECT LINE IN RESPONSE.

. ACTION DUE TO f!RR D: RECTOR'S 0FFICE NRR RECEIVED:

NOVEMBER 12, 1993

.NRR-ACTION:

DAR:CRUTCHFIELD NRR ROUTING:

TEM /FJM BY R, /ffd JC WR

-FG KB L

L.'.

.L