Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18101A943 + (Discusses Investigation of Licenses DPR-70 & DPR-75 on 921203 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $80,000)
- ML20126C521 + (Discusses Investigation of Methods to Control Tendon Corrosion Involving Establishment of Nitrogen Blanket on Pcrv Tendon Sys.Establishing & Maintaining Overall Nitrogen Blanket Sys for Tendons Highly Questionable)
- ML100270167 + (Discusses Investigation of Piping Allegations.Util Requested to Perform Comprehensive Program to Verify Conformance W/ Sys Specs)
- ML19225C298 + (Discusses Investigation of Possible Overexposures of Four Employees to Radioactive Matls.Cites Evidence Indicating Exposure Values Reported by Helgeson Nuclear Svcs Are in Error)
- ML20107B617 + (Discusses Investigation of Results of Blowdown on 721229. Informs That Licensee Responsive to Most Requests)
- HBL-85-046, Discusses Investigation of Shipment of Solidified/ Encapsulated Filters for Which Notification of Receipt Not Received within 20 Days After Transfer.Caused by Personnel Change at Burial Site & Change of Broker Address + (Discusses Investigation of Shipment of Solidified/ Encapsulated Filters for Which Notification of Receipt Not Received within 20 Days After Transfer.Caused by Personnel Change at Burial Site & Change of Broker Address)
- ML19291B782 + (Discusses Investigation of Snubber Locking Problem Associated W/Itt Grinnel Corp Piping.All Valves Tested Performed Per Predicted Snubber Values & Provide Adequate Seismic Restraint)
- ML19253C601 + (Discusses Investigation of Use of Albi Duraspray Fireproofing Matl.No Damage Caused by Duraspray Matl. Tests & Analyses of Duraspray & Potential Alternate Matl Will Continue)
- ML20244D216 + (Discusses Investigation of Water in Containment Vessel Sump Noted During Fourth Quarterly Insp on 881214.Presence of Water Poses No Threat to Environ or to Public Health & Safety)
- ML20151E214 + (Discusses Investigation of Water in Containment Vessel Sump Noted During Second Quarterly Insp on 880628.Radioisotopic Analysis of Subj Water Revealed Co-60,Cs-137,Cs-134 & Sr-90 Contamination.Analysis Results Encl)
- ML20024C819 + (Discusses Investigation,Evaluation & Recommendations Re ltr-designated Individual Vv Operator License Exam Failure & Possible Cheating)
- ML17313A489 + (Discusses Investigations 4-97-022S & 4-98-014 Completed on 980213 & Predecisional EC Held W/Util on 980331 in Arlington,Tx & Forwards Notice of Violation)
- ML20155G401 + (Discusses Investigations Into Allegations Re Discrimination, Intimidation & Harassment of QC Personnel & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $120,000)
- ML19331B770 + (Discusses Investigations Into Alleged Falsification of Security Training Records.Investigations Revealed Serious Failure Re Security Program Mgt.Matter Referred to DOJ Criminal Div)
- ML20210N572 + (Discusses Investigations Rept 1-98-005 Conducted by OI at Naesco,Seabrook Station & Forwards NOV & Proposed Imposition of Civil Penalty - $55,000.Violation Re Failure to Promptly Correct Incorrectly Terminated Cables of Control Bldg Air)
- ML20236L208 + (Discusses Investigations Rept 3-97-041 Re Info Provided by Util.Pipefitters Employed by Plant Failed to Rept Violations of Util FFD Program Occurring on 971010.Review Concluded That Pipefitters Separately Failed to Rept Occurrences)
- ML20198F737 + (Discusses Investigations of Complaints of Retaliation Against Employees Who Engaged in Protected Activities.Based on NRC Review of All Info & Per 10CFR50.7,violation May Have Occurred.Synopses of OI Repts 4-96-035 & 4-96-059 Encl)
- ML20011D563 + (Discusses Investigations on 871001-880707 & 881121-890324 Re Activities Authorized Under License NPF-3 & Emphasizes Need for Plant Manager to Assure That Root Cause Analyses Are Properly Conducted to Deliver Effective Corrective Actions)
- ML19246C350 + (Discusses Invitation for Bids 73-824811,indefinite Quantity Term Contract for Rebar Splicing Matl for Nuclear Plant.Reg Guides State That Methods & Solutions Different from Those Specified in Guide Are Acceptable Under Certain Conditions)
- ML20236V419 + (Discusses Invitation to 870921 Meeting W/Listed Agencies in Mexico City,Mexico to Review Proposed Waste Disposal Site in Fort Hancock,Tx)
- ML19322E076 + (Discusses Invitation to Make Presentation Re Impacts of TMI Accident to Fisheries of Susquehanna River at Potomac Chapter of American Fisheries Soc 1980 Annual Meeting)
- ML20195G944 + (Discusses Invitation to Participate in Panel Discussion in Hawaii Re Proposed Commercial Irradiation Facility on Island of Hawaii)
- ML20245F959 + (Discusses Invoice for Part 55 Svcs for 870621-1219. Reaffirms That Accrued Interest Bill,Dtd 890309,should Be Disregarded)
- ML20135B800 + (Discusses Involvement W/Engelhard)
- ML19224A776 + (Discusses Iodine & Xenon Concentrations in Containment Sumps)
- ML20127M597 + (Discusses Iowa Agreement Program Progress Rept)
- ML19207B457 + (Discusses Irregularities in Regulatory Rod Movements.Cause Is Unknown But Short Range Binding in Neighborhood of 25 Degrees May Result from Faulty Bearings on Shim Arm Shaft. Further Tests Are Planned.Reactor Will Remain Shut Down)
- B12123, Discusses Isap Topic 1.18, Atws. Upgraded Standby Liquid Control Sys Would Improve Margin of Safety During Response to ATWS Event.Evaluation & Scope & Schedule or Exemption Request Will Be Completed by Aug 1986 + (Discusses Isap Topic 1.18, Atws. Upgraded Standby Liquid Control Sys Would Improve Margin of Safety During Response to ATWS Event.Evaluation & Scope & Schedule or Exemption Request Will Be Completed by Aug 1986)
- ML19224B850 + (Discusses Isolation of Auxiliary or Emergency Feedwater During Test.Requests Confirmation by 790530 Re Test Procedures of PWRs W/Redundant Auxiliary or Emergency Feedwater Sys)
- ML20148G994 + (Discusses Isotope Measuring Sys,Inc Application for Amend for Model 5245 & Included Several Requests for Generic Authorizations)
- ML20133P568 + (Discusses Isotopes Specialties Co 601215 Notice Re Sea Disposal of Radwaste)
- ML20133P203 + (Discusses Isotopes Specialties Co Waste Loading at Long Beach Harbor & Subsequent Sea Disposal Operation on 610111-16)
- ML20133N308 + (Discusses Isotopes Specialties Jurisdiction)
- ML20133C417 + (Discusses Issuance of 831208 Order for Mod to License & Order to Show Cause Re Continued Use of Reactor Operator License.Addl Matls Not Authorized Due to Imminent Expiration of License.Portions Deleted)
- IA-85-106, Discusses Issuance of 831208 Order for Mod to License & Order to Show Cause Re Continued Use of Reactor Operator License.Addl Matls Not Authorized Due to Imminent Expiration of License.Portions Deleted + (Discusses Issuance of 831208 Order for Mod to License & Order to Show Cause Re Continued Use of Reactor Operator License.Addl Matls Not Authorized Due to Imminent Expiration of License.Portions Deleted)
- 3F0391-05, Discusses Issuance of Amend 133 to License DPR-72 on 910207, Changing TS for RCS Heatup & Cooldown Pressure/Temp Curves for Operation Up to 15 Efpys.Changes to Operating Practices Associated W/Nrc Bulletin 88-011 Underway + (Discusses Issuance of Amend 133 to License DPR-72 on 910207, Changing TS for RCS Heatup & Cooldown Pressure/Temp Curves for Operation Up to 15 Efpys.Changes to Operating Practices Associated W/Nrc Bulletin 88-011 Underway)
- ML19260B302 + (Discusses Issuance of Amend 17 to License DPR-64,which Authorized Operation at 100% Power.Max Allowable Fee Already Paid by Util.No Addl Fee Required)
- ML19336A580 + (Discusses Issuance of Amend 17 to Provisional OL for Lacbwr. Util 800117 Analysis of Safe Shutdown Capability Not Sufficient Per Encl BNL 800702 Review.Shutdown Sys Must Comply w/10CFR50,App R,Section Iii,Paragraph L)
- ML19323B949 + (Discusses Issuance of Aslab 800422 Decision Re Fh Potthoff Appeal from Denial of Petition to Intervene.Decision Reaffirms Settled & Sensible Interpretation of Section Re Basis for Contentions.Certificate of Svc Encl)
- ML20140D226 + (Discusses Issuance of CAL-RIII-96-08 Due to Events at Licensee Facility Involving Injection of Expandable Grout Matl Into Cracks in Lake Screen House Floor)
- ML20137Y164 + (Discusses Issuance of CAL-RIII-97-02A Due to Concerns W/Performance Deficiencies That May Have Occurred During 970221 Event)
- B11044, Discusses Issuance of Des on 840417.Revised Seismic Fragilities Data Developed & Effect on Overall Risk Curves Will Be Completed Shortly.Expresses Concern That NRC Unable to Support Issuance of Des on Time + (Discusses Issuance of Des on 840417.Revised Seismic Fragilities Data Developed & Effect on Overall Risk Curves Will Be Completed Shortly.Expresses Concern That NRC Unable to Support Issuance of Des on Time)
- NUREG/CR-6618, Discusses Issuance of Final Rept, Development & Findings of Performance Trending Methodology (NUREG/CR-6618). Rept Documents Data & Methods Used to Produce Trend Plots & May Be Used as Technical Ref for Publication + (Discusses Issuance of Final Rept, Development & Findings of Performance Trending Methodology (NUREG/CR-6618). Rept Documents Data & Methods Used to Produce Trend Plots & May Be Used as Technical Ref for Publication)
- NUREG/CR-5500, Discusses Issuance of Final Rept, Reliability Study Auxiliary Emergency Feedwater System 1987-1995, (NUREG/CR-5500,Vol 1).Summary of Comment Resolutions Encl + (Discusses Issuance of Final Rept, Reliability Study Auxiliary Emergency Feedwater System 1987-1995, (NUREG/CR-5500,Vol 1).Summary of Comment Resolutions Encl)
- ML18068A358 + (Discusses Issuance of GL 96-01, Testing of Safety Related Logic Circuits. in Response to GL 96-01 CPC Provided 960417 & s for Plant.Submittals Provided Info Requested & Required by GL 96-01,therefore TAC M94709 Closed)
- ML20236K657 + (Discusses Issuance of GL 97-04, Assurance of Net Positive Suction Head for ECC & Containment Heat Removal Pumps. Issued GL 97-04 to Confirm Adequacy of NPSH Available for ECC & Containment Heat Removal Pumps Under Design Basis)
- ML20236K672 + (Discusses Issuance of GL 97-04, Assurance of Net Positive Suction Head for ECC & Containment Heat Removal Pumps. Issued GL 97-04 to Confirm Adequacy of NPSH Available for ECC & Containment Heat Removal Pumps Under All Design Basis)
- ML20029C446 + (Discusses Issuance of Info Notice 91-022, Four Plant Outage Events Involving Loss of AC Power or Coolant Spills, to Address Recent Events That Occurred During Shutdown Operations)
- ML20212G396 + (Discusses Issuance of License Amends Without Waiting for Expiration of 15 Days Public Notice for Export Licenses XSNM02966 & XSNM02967 for Amend to Change End Use Statements from 7 to 6 Reloads.Concludes Reduced Reloads No Problem)
- COM-091, Discusses Issuance of License XCOM-1004,replacing Expired License XCOM-0914,per Elgar Intl Corp Request.License XCOM-1004 Issued Under Waiver of Usual 15-day Waiting Period to Enable Licensee to Meet Late Aug 1986 Shipping Schedule + (Discusses Issuance of License XCOM-1004,replacing Expired License XCOM-0914,per Elgar Intl Corp Request.License XCOM-1004 Issued Under Waiver of Usual 15-day Waiting Period to Enable Licensee to Meet Late Aug 1986 Shipping Schedule)
- ML19289F438 + (Discusses Issuance of License to Consolidated Controls W/O Customary 15-day Waiting Period.Applicant Was Unaware That License Was Required for Export of Detectors to Italy)