Discusses Isolation of Auxiliary or Emergency Feedwater During Test.Requests Confirmation by 790530 Re Test Procedures of PWRs W/Redundant Auxiliary or Emergency Feedwater Sys
ML19224B850
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/18/1979
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Grier B, James Keppler, James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19224B849 List:
References
REF-SSINS-3300 NUDOCS 7906270072
Download: ML19224B850 (1)


Text

...

ga ash

/

UNITED STATES y

3+a g

NUCLEAR REGULATORY COMMISSION

.c wassie,cTow o.c.zosss MAY I g 1979 MEMORANDUM FOR:

B. H. Grier, Director, RI J. P. O' Reil.ly, Director, RII J. G. Keppler, Director, Rill V. Seyfrit, Director, RIV R. H. Engelken, Director, RV FROM:

Norman C. Moseley, Director, Division of Reactor Operations Inspection, IE

SUBJECT:

ISOLATION OF AUXILIARY OR EMERGENCY FEEDWATER DURING TEST Investigation has shown that the surveillance test procedure used to test auxiliary feedwater systems at TMI-2 requires isolation of both trains of feedwater while performing the test. Please confirm by May 30 that test procedures of other PWRs with redundant auxiliary or emergency feedwater systems do not require both trains to be inoperable during the test.

If any procedures do require isolation of both trains to do the test, report this information to ADFC promptly. Otherwise, please report the results of this review to me by May 31, 1979.

ffpg/

.j

-7,NormanC.Moseley n

/

Director Division of Reactor Operations Inspection, IE cc: