i Docket No. 50-409 SEPTE"BER 18 iS60 Mr. Frank Linder General Manager Dairyland Power Cooperative 2615 East Avenue South La Crosse, Wisconsin 54601

Dear Mr. Linder:

By letter dated July 27, 1979, the Cocnission issued Amendment No.17 to Provisional Operating License No. DPR-45 for the LaCmsse Boiling Water Reactor. This amendment added a license condition relating to the completion of facility modifications to improve the fire protection programs. Our enclosed Safety Evaluation Report for Amendment No.17 listed the Safe Shutdown Analysis as incomplete. By letter dated Seprtember 14, 1979 we provided to you our position entitled " Safe Shutdown Capability" and noted that Section 8 of that document specifies the information we require for our review of fire protec-tion capability. By letter dated January 17,1980 you submitted your analysis of safe shutdown capability.

The staff has utilized the Brookhaven National Laboratory (BNL) to review your Safe Shutdown Report (1/17/S0). Based on that reviow, we have concluded that the fire protection features you have identi-fled are not sufficient to assure safe shutdown capability. The BNL report is enclosed for your information. To resolve the fire protection concerns for safe shutdown at your facility, we would find acceptable the installation of an alternate shutdown system that will meet the requirements of Section III, paragraph L of proposed Appendix R to 10 CFR Part 50. Please be aware that other aspects of the Systematic Evaluation Program (SEP) currently in progress may require installation of a dedicated safe shutdown system whichcoould be designed to simul-taneously satisfy the requirements for the alternate safe shutdown systems required for fire protection.

On May 29,1980, the Commission published a proposed change to 10 CFR Part 50 which would add certain requirements for fire protection. The proposed change would require that plants included in the SEP have 8010300 134 E

completed implementation of alternate shutdown capability by December 1,1981, or dedicated shutdown capability by October 1, 1982. The proposed change would also require that the licensee submit plans and schedules for that implementation by Noventer 1, 1980.

In addition, in the supplementary information published with the pmposed rule the Comission stated "...the Comission anticipates approsing few, if any, extensions." They also state "the Connission may revise the implementation deadlines for SEP plants to earlier dates following coupletion by the NRC staff of its review of the status of fire protection at those plants."

Although there is no effective rule in place at the present time, we believe it is prudent to anticipate a short deadline and, therefore, request that you provide your proposed plans and schedules for the altemate shutdown capability by November 1,1980.

Sincerely, o: iginal r igr.ed by Darrell G. Eisenhut Darrell G. Eisenhut, Director Division of Licensing

Enclosure:

DISTRIBUTION:

As stated Docket OELD NRC PDR OI&E (3) cc w/ enclosure:

Local PDR TWambach See page 3 TERA JShea NSIC HSmith NRR Reading DCrutchfield ORB #5 Reading ACRS (16)

HDenton RFerguson (5)

ECase JHeltemes, AE00 DEisenhut Gray File RPurt,le Xtra Cy (6)

TNovak RTedesco JRoe Glainas l

-Q A SA:DL G#D:

ORfL&BC '

ORB #5:DL C-0Rp*5Og' l

" l'Mt

'D rut if61d iilas

' Dl'

'u t" d

m

"""^"'f 9/b50 9/f/80 l9/f/80

~h[I[8d

9'/g. /8d '

.}.

.s.

NQC FORM 318 (9 76) NRCV ONO NV.S. GOVERNMENT PRINTING OFFICE: 1979-289-369

j#"" %*

UNITED STATES 3"

- ^$

NUCLEAR REGULATORY COMMISSION 3

' e ' k g, 1

usmuotou, o. c. 2osss o

e

,o#

September 18, 1980 Docket No. 50-409 Mr. Frank Linder General Manager Dairyland Power Cooperative 2615 East Avenue South La Crosse, Wisconsin 54601

Dear Mr. Linder:

By letter dated July 27, 1979, the Commission issued Amendment No. 17 to Provisional Operating License No. DPR-45 for the Lacrosse Boiling Water Reactor.

This amendment added a license condition relating to the completion of facility modifications to improve the fire protection programs. Our enclosed Safety Evaluation Report for Amendment No.17 listed the Safe Shutdown Analysis as incomplete. By letter dated September 14, 1979 we provided to you our position entitled " Safe Shutdown Capability" and noted that Section 8 of that document specifies the information we require for our review of fire protec-tion capability.

By letter dated January 17, 1980 you submitted your analysis of safe shutdown capability.

The staff has utilized the Brookhaven National Laboratory (BNL) to review your Safe Shutdown Report (1/17/80). Based on that review, we have concluded that the fire protection features you have identi-fied are not sufficient to assure safe shutdown capability.

The BNL report is enclosed for your information. To resolve the fire protection concerns for safe shutdown at your facility, we would find acceptable the installation of an alternate shutdown system that will meet the requirements of Section III, paragraph L of proposed Appendix R to 10 CFR Part 50.

Please be aware that other aspects of the Systematic Evaluation Program (SEP) currently in progress may require installation of a dedicated safe shutdown system which could be designed to simul-taneously satisfy the requirements for the alternate safe shutdown systems required for fire protection.

On May 29,1980, the Commission published a proposed change to 10 CFR Part 50 which would acd certain requirements for fire protection. The proposed change would require that plants included in the SEP have

. completed implementation of alternate shutdown capability by December 1,1981, or dedicated shutdown capability by October 1, 1982. The proposed change would also require that the licensee submit plans and schedules for that implementation by November 1, 1980.

In addition, in the supplementary information published with the proposed rule the Commission stated "...the Commission anticipates approving few, if any, extensions." They also state "the Commission may revise the implementation deadlines for SEP plants to earlier dates following completion by the NRC staff or its review of the status of fire protection at those plants."

Although there is no effective rule in place at the present time, we believe it is prudent to anticipate a short deadline and, therefore, request that you provide your proposed plans and schedules for the alternate shutdown capability by November 1,1980.

incerely, J,

(,

1 J))jg va e

.f sen u, virector Division of kicensing

Enclosure:

As stated cc w/ enclosure:

See page 3 t

u

, cc w/ enclosure:

Fritz Schubert, Esquire Director, Technical Assessment Staff Attorney Division Dairyland Power Cooperative Office of Radiation Programs 2615 East Avenue South (AW-459)

La Crosse, Wisconsin 54601 U. S. Environmental Protection Agency O. S. Heistand, Jr., Esquire Crystal Mall #2 Morgan, Lewis & Bockius Arlington, Virginia 20460 1800 M Street, N. W.

W1shington, D. C.

20036 U. S. Environmental Protection Agency Mr. R. E. Shimshak Federal Activities Branch La Crosse Boiling Water Reactor Region V Office Dairyland Power Cooperative ATTN: EIS C0ORDINATOR P. O. Box 135 230 South Dearborn Street Genoa, Wisconsin 54632 Chicago, Illinois 60604 Coulee Region Energy Coalition Charles Bechhoefer, Esq., Chairman ATTN: George R. Nygaard Atomic Safety and Licensing Board P. O. Box 1583 U. S. Nuclear Regulatory Comission La Cross', Wisconsin 54601 Washington, D. C.

20555 La Crosse Public Library Dr. George C. Anderson 800 Main Street Department of Oceanography La Crosse, Wisconsin 54601 University of Washington Seattle, Washington 98195 Mrs. Ellen Sabelko Society Against Nuclear Energy Mr. Ralph S. Decker 929 Cameron Trail Route 4, Box 190D Eau Claire, Wisconsin 54701 Cambridge, Maryland 21613 Town Chairman Dr. Lawrence R. Quarles Town of Genoa Kendal at Longwood, Apt. 51

' Route 1 Kenneth Square, Pennsylvania 19348 Genoa, Wisconsin 54632 Thomas S. Moore Chairman, Public Service Comission Atomic Safety and Licensing Appeal Board

.of Wisconsin U. S. Nuclear Regulatory Comission Hill Farms State Office Building Washington, D. C.

20555 Madison, Wisconsin 53702 Ms. Anne K. Morse Alan S. Rosenthal, Esq., Chairman Coulee Region Energy Coalition l

Atomic Safety and Licensing Appeal Board Post Office Box 1583 U. S. Nuclear Regulatory Comission Lacrosse, Wisconsin 54601 Washington, D. C.

20555 U. S. Nuclear Regulatory Comission Mr. Frederick Milton Olsen, III Resident Inspectors Office 609 North lith Street Rural Route #1, Box 225 Lacrosse, Wisconsin Genoa, Wisconsin 54632

\\

s.

L m

EROCKHAVEN NATIONAL IAGORATCRY ASSOCIATED UNIVERSITIES. INC.

{

Uptcn. New vet 11073 C mirnant cf Nuc'ect Snorgy (5"o) 3,:5 2144 July 2,1980 e

P D I

D oh

{.

3

'r. LAert L. Ierguson chnaical Engineering U.S. "oclear Regulatory Ccamission

'Inhi.e t on, D. C.

20SS5 RE: Safe Shutdown Analysis, La Crcsse Nuclear Pcuer Plant near ob:

lir. Ed MacDougall of Breckhavan National Lateratory (SNL) and Jack Kl.: van of Rolf Jensen and Associates, Inc. have ecmpleted the raini-review of the la Cros se Nuclear Pc.ver Plant.

This mini-review consisted of a review of the docuentation sutnaitted by the licensee (ref. a) to see if it was complete and in enough detail for SNL to evaluate the safe shutdcwn analysis.

The original fire hazard analysis (ref. e) was used when necessary.

e A review of the documantation was made for completeness.

A comparison of the material submitted by the licensee to the require-e ments of the SER (ref. b) was conducted.

This ccmparison was made solely for completeness and was not a detailed compliance check.

A revicw of the catarial submitted for grcss and ebvious variations 3

frca the requirements of Apper. dix A (ref. d) and Appendix R (ref, c) was also conducted.

We have lis ed cur cc=ents under the foll: wing headings in this report:

1.

Adequacy of Cocumentation 2.

Ccaparison of the Licensee's Submittal to the S.E.R.

3.

Ccmparison of the Licensae's Submittal to Appndices A and R.

4 Engineering Evaluation 5.

Conclusiens 6.