Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Confirmation of Completion of Actions Authorization Related to Access". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML16259A272  + (Confirmation of Action Ltr Re 910920 Telcon Concerning Actions to Be Taken as Result of Recent Shutdown Events at Facility.Actions to Be Taken Listed)
  • ML20053B494  + (Confirmation of Action Ltr Re Actions Needed to Resolve Emergency Preparedness Program.List of Improvement Items Included.Ie Emergency Preparedness Appraisal Rept 50-261/82-02 Encl)
  • ML20148E901  + (Confirmation of Action Ltr Re Actions Taken in Response to Reactor Trip & swap-over of Suction to Auxiliary Feedwater Pumps & Degraded Auxiliary Feedwater Flow.Nrc Understands That Util Committed to NRC Approval Prior to Startup)
  • ML17304B066  + (Confirmation of Action Ltr Re Actions Util Intends to Take as Result of 890303 & 05 Reactor Trips)
  • ML17279A382  + (Confirmation of Action Ltr Re Agreement Not to Start Up Facility Until Assessment of Plant Readiness for Restart Completed,Per 870706 Telcon.Nrc Concerns Re Scrams & Other Occurrences During Startup from Refueling Outage Encl)
  • ML20041F621  + (Confirmation of Action Ltr Re Agreements Reached at 820127 Emergency Appraisal.Preparedness Improvement Items,Emergency Preparedness Evaluation Rept & List of Open Items Encl)
  • ML20054D623  + (Confirmation of Action Ltr Re Anonymous Allegation of Unlicensed Individuals Using Radioisotopes Listed Under License 39-19693-01.Region 2 Must Be Notified If USGS Understanding of 820316 Discussion Differs from Ltr)
  • ML20133N886  + (Confirmation of Action Ltr Re Control Room & Auxiliary Bldg Ventilation Sys Filter Testing.Actions to Be Taken Listed)
  • ML20133N888  + (Confirmation of Action Ltr Re Control Room & Auxiliary Bldg Ventilation Sys Filter Testing.Actions to Be Taken Listed. Record Copy)
  • ML20245A868  + (Confirmation of Action Ltr Re Corrective Action for 890307- 08 Steam Generator Tube Rupture,Per 890413 Meeting.Actions Planned Include Further Meetings & Reporting on Tube Plugs & Cause of Tube Failure)
  • ML17194A296  + (Confirmation of Action Ltr Re Diesel Generator Cooling Water Pump Operability.Unit 3 Diesel Generator Will Be Declared Operable Re Fulfilling Tech Spec Requirements.Operability Will Be Demonstrated by Normally Required Surveillances)
  • ML18152B203  + (Confirmation of Action Ltr Re NRC Understanding That Util Will Meet W/Nrc in Atlanta,Ga to Discuss Root Causes of 880517 Partial Loss of Water from Unit 1,mods to Equipment, Addl Training for Unit 2 & Corrective Actions)
  • ML20041F712  + (Confirmation of Action Ltr Re Potential Problem of Cracking in Safe End Nozzle on Makeup Sys & Possible Wear on Related Thermal Sleeve at B&W Facilities)
  • ML20236R894  + (Confirmation of Action Ltr Re Util Commitments to Make Corrections to Diesel Generator Loading,Uhs Max Temp & Svc Water Flow Balance,Per 871105 Meeting in Rockville,Md)
  • ML20236Q919  + (Confirmation of Action Ltr Reiterating Listed Actions Taken by Licensee,Per 871110 Telcon.Licensee Will Cease All Receipt & Processing of Licensed Matl & Prevent All Access, Disposal or Removal of Licensed Matl)
  • ML20050C272  + (Confirmation of Action Ltr Requesting Deadlines for Emergency Preparedness Issues,Including Training & Retraining Programs & Procedures for Accurately Detecting & Measuring Radioiodine Concentrations)
  • ML20154L161  + (Confirmation of Action Ltr,Per 860304 Telcon,That Corrective Actions Described in Encl Re Insp Repts 50-321/86-01 & 50-366/86-01 Being Performed & Will Be Completed.Encl Withheld (Ref 10CFR2.790 & 73.21))
  • ML20210B244  + (Confirmation of Action Ltr,Reiterating NRC Understanding of Licensee Commitment to Listed Items Re Evaluation of Repair Work,Investigation Into Unauthorized Release of Radioactive Matl & Notification to NRC Before Startup,Per 870410 Telcon)
  • ML20040D799  + (Confirmation of Action Re 820125 Telcon Concerning Submittal of Radiological Contingency Plan.Failure to Comply W/Order to Modify License Is Violation of Regulation.Contingency Plan Due by 820129)
  • ML20049H757  + (Confirmation of Action Re Agreements Reached at 820219 Mgt Exit Interview Following Emergency Preparedness Appraisal. Corrective Actions Required for Significant Appraisal Findings Submitted)
  • ML040420184  + (Confirmation of Cancellation of a Management Meeting (Category One Public Meeting), Which Had Been Scheduled for February 12, 2004. the Purpose of This Meeting Was to Discuss Performance of the H. B. Robinson Steam Electric Plant Unit 2)
  • ML20211L803  + (Confirmation of Closing Notice)
  • ML093210182  + (Confirmation of Closing of Transfer to Edf Development Inc. of Ownership and Operating Interests in Constellation Energy Nuclear Group, LLC)
  • NLS2004042, Confirmation of Commitments Discussed in 03/05/04 Teleconference  + (Confirmation of Commitments Discussed in 03/05/04 Teleconference)
  • NLS2003122, Confirmation of Commitments, Per 11/13/03 Telephone Conference Regarding Diesel Generator Fuel Oil Strainer Fouling  + (Confirmation of Commitments, Per 11/13/03 Telephone Conference Regarding Diesel Generator Fuel Oil Strainer Fouling)
  • RS-04-018, Confirmation of Completion of Actions Implementing the Compensatory Measures Related to Access Authorization Issued January 7, 2003, NRC Order  + (Confirmation of Completion of Actions Implementing the Compensatory Measures Related to Access Authorization Issued January 7, 2003, NRC Order)
  • RS-02-158, Confirmation of Completion of Actions Implementing the Interim Compensatory Measures of the February 25, 2002, Commission Order to Modify License for Interim Safeguards and Security Measures  + (Confirmation of Completion of Actions Implementing the Interim Compensatory Measures of the February 25, 2002, Commission Order to Modify License for Interim Safeguards and Security Measures)
  • RS-03-220, Confirmation of Completion of Actions Implementing the Compensatory Measures Related to Security Force Fitness-for-Duty  + (Confirmation of Completion of Actions Implementing the Compensatory Measures Related to Security Force Fitness-for-Duty)
  • ML17262A255  + (Confirmation of Completion of Actions Taken by Dominion Nuclear Connecticut, Inc., as Set Forth in NRC Confirmatory Order Dated August 26, 2015)
  • ML15205A342  + (Confirmation of Compliance with EA-12-051 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation)
  • ML17252A818  + (Confirmation of Conversation Concerning Discovery of a Pin Hole Leak in Reactor Feed Pump Minimum Flow Line)
  • ML17252A810  + (Confirmation of Conversation Concerning Failure of Two Bergan-Paterson Pipe Restraints in Drywell)
  • ML17252A803  + (Confirmation of Conversation Concerning Location During Control Rod Drive Exercising of Failure of 3-2X2 CRD Arrays to Meet the Tech Spec. Limit for Five Percent Scram Insertion Time)
  • ML17252A774  + (Confirmation of Conversation Concerning Failure of the 24/48 Vdc Battery to Deliver Rated Compacity)
  • ML17252A800  + (Confirmation of Conversation Concerning Actuation of the Standby Liquid Control System Pump Discharge Release Valve Below Tech. Spec. Limits During Refueling Outage Surveillance)
  • ML17252A830  + (Confirmation of Conversation Concerning Discovery of a Leaking Containment Inerting Isolation Valve A03-1601-21, During Local Leak Rate Testing)
  • ML17252A828  + (Confirmation of Conversation Concerning Reactor Vessel Low Water Level Scram and Low Low Isolation Switch LIS3-263-57B to Trip within the Technical Specification Limits)
  • ML17252A808  + (Confirmation of Conversation Concerning Periodic 25 Control Rod Scram Testing)
  • ML17252A807  + (Confirmation of Conversation Concerning Periodic 25 Control Rod Scram Testing)
  • ML17252A451  + (Confirmation of Conversation Concerning Location of Broken Tack on Jet Pump Restrainer Clang Bolt Keepers)
  • ML17252A797  + (Confirmation of Conversation Concerning Drift of Main Steam Line High Temperature Sensors to 201-218 Degree F)
  • ML17252A805  + (Confirmation of Conversation Concerning Failure of ECCS Low Pressure Initiating Switch PS3-263-52A-1)
  • ML17252A826  + (Confirmation of Conversation Concerning Reactor Vessell Low Water Level Scram and Low Isolation Switch LIS3-263-57B to Trip within the Technical Specification Limits)
  • ML17252A811  + (Confirmation of Conversation Concerning Failure of Bergen Patterson Piping Restraint No. 19HPCI Main Steam Line in the Drywell)
  • ML17252A801  + (Confirmation of Conversation Concerning Excessive Leakage Through Primary Containment Feedwater Isolation Check Valves 3-220-58B and 3-220-62B During Refueling Outage Surveillance)
  • ML17252A812  + (Confirmation of Conversation Concerning Failure of Two Bergan-Paterson Pipe Restraints Drywell)
  • ML17252A799  + (Confirmation of Conversation Concerning Actuation of the Standby Liquid Control System Pump Discharge Release Valve Below Tech. Spec. Limits)
  • ML17252A798  + (Confirmation of Conversation Concerning Excessive Leakage Through Primary Containment Feed Water Isolation Check Valves 3-220-58B and 3-220-62B)
  • ML17252A778  + (Confirmation of Conversation Concerning of Failure of Feedwater Check Valves, 3-220-58U and 62A, and 3A Feewater Line to Pass Local Leak Rate Test)
  • ML17252A804  + (Confirmation of Conversation Concerning Inoperability of Due to Both Stating Air Compressor Receiver Outlet Valves Being Closed)