Confirmation of Conversation Concerning Actuation of the Standby Liquid Control System Pump Discharge Release Valve Below Tech. Spec. Limits
ML17252A799
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 06/05/1975
From: Stephenson B
Commonwealth Edison Co
To: James Keppler
NRC/RGN-III
References
Download: ML17252A799 (1)


Text

l:J:J MVN,ILL 1.:JU,ti3CY

\\~ HEA

  • WUA 209 JP 537P CDT

. VEC.317<1620)C2-034Sl6El56>PD 06/05/75 1619 0-o*'..2Y9 res IPMB\\JSZ CSP 8159424449 IDBN MORRIS IL 88 06-05 04!9P EST PMS JAM~S G KEPPLER REGIONAL DIRECTOR DIRECTORATE OF REGULATORY OPERATIONS RE3ION 3 WUX US NUCLEAR REGULATORY COMMISSIONP DLR 7)9 ROOS£\\/ EL T FW GLEtJ ELLYN IL SlJBJ\\ECT DPfl-25 DRESDEN NUCLEAR POWER STATION 0 UNIT 3o THIS WILL CONFIRM A CONVERSATION WITH MR P JOHNSON OF YOUR OFFICE AT 1500 HOURS THIS.DATE CONCERNING ACTUATION OF THE $JANDBY LIQUID CONTROL SYSJEM PUMP DISCHARGE RELEASE VALVE BELOW TECH SPEC LI~ITS DURING REFUELING OUTAGE SURVEILLANCEo THE "AS FOUND" SET POINTS OF.

THE 3A MW,33 VALVES \\>JERE 1250 AND 1320 PSI RESPECTIVELYo DUE TO A PROCEDURAL 1NADEQUACY 0 THESE ACTUATIONS WERE PERFORMED 13 DAYS PRIOR TO,THIS NOTIFICATION 0 DURING REVIE\\iJ OF THE SURVEILLANCE PACKAGE..

8 8 STEP!-iENSON SUPERINTENDENT DRESDEN NUCLEAR PmJER S'TATION

  • co~~ONWEALTH EDISON co RURAL ROUTE 1 MORRIS IL 60450 NNl'l