Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "COL License Termination". Since there have been only a few results, also nearby values are displayed.

⧼showingresults⧽

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML23137A216  + (COL Docs - Vogtle LAR-22-002 Final RAI TS 3.8.3 Has Been Issued)
  • ML23032A291  + (COL Docs - Vogtle Unit 3 Exigent LAR 23-004, Acceptance Review)
  • ML22263A021  + (COL Docs - Vogtle Unit 4 - Acceptance of Requested Licensing Action LAR 22-003)
  • ML19233A197  + (COL Docs - Vogtle Units 3 and 4 - LAR 19-XXX, PRHR Natural Circulation Fpot Pre-Submittal Presentation - Public)
  • ML19072A060  + (COL Docs - Vogtle Units 3 and 4 - March 21 Presubmittal Meeting Request for 2 LARs)
  • ML20029F008  + (COL Docs - Vogtle Units 3 and 4 - NRC Staff Questions on LAR 19-019 Audit (Public-Redacted))
  • ML18225A016  + (COL Docs - Vogtle Units 3 and 4 Draft LAR ITP-3 for 8/16 Pre-Submittal Meeting)
  • ML20090E104  + (COL Docs - Vogtle Units 3 and 4 Technical Exchange - LAR-20-003 (LAR 232): Technical Specifications ESFAS-VES and Vacuum Relief)
  • ML20009E663  + (COL Docs - Vogtle Units 3 and 4, LAR 19-019, Reconciliation of Environmental Conditions Inputs to Civil Structural Design Licensing, NRC Staff Acceptance)
  • ML20036F159  + (COL Docs - Vogtle Units 3 and 4, LAR 19-017, Removal of the Preoperational PRHR Natural Circulation Test, NRC Staff Acceptance)
  • ML19249D651  + (COL Docs - Vogtle Units 3 and 4, SNC Presentation for 9/10 Public Meeting 52.103(g) Process)
  • ML19240A051  + (COL Docs - Vogtle Units 3 and 4: Draft Letters for 52.103g Tabletop Public Meeting on 9/10)
  • ML23025A165  + (COL Docs - Vogtle Units 3&4 Acceptance Letter for LAR-22-002 Technical Specification 3.8.3, Inverters – Operating)
  • ML23156A464  + (COL Docs - Vogtle, Units 3 & 4 - Acceptance of LAR 23-006, Rev. 1, More Restrictive Action for Technical Specification 3.1.9)
  • ML23158A008  + (COL Docs - Vogtle, Units 3 & 4 - Acceptance of LAR 23-003, Relocation of TS 3.7.9 Spent Fuel Pool Makeup Water Sources)
  • ML20008D632  + (COL Docs - Work Hour Rule Presentation)
  • ML110030221  + (COL Hearing - Draft RAI 5191 Related to SRP Section 02.03.05 - Long-Term Atmospheric Dispersion Estimates for Routine Releases for the Turkey Point Units 6 and 7 Combined License Application)
  • ML110030218  + (COL Hearing - Draft RAI 5308 Related to SRP Section 02.03.01 Regional Climatology for the Turkey Point Units 6 and 7 Combined License Application)
  • ML110030216  + (COL Hearing - Draft RAI 5309 Related to SRP Section 02.03.02 - Local Meteorology for the Turkey Point Units 6 and 7 Combined License Application)
  • ML110030217  + (COL Hearing - Draft RAI 5310 Related to SRP Section 02.03.03 - Onsite Meteorological Measurements Program for the Turkey Point Units 6 and 7 Combined License Application)
  • ML110620662  + (COL Hearing - FW: FPL Letter L-2011-082 Dated 02/28/2011 - Submittal of the Groundwater Model Report Revision 1)
  • ML110270357  + (COL Hearing - FW: NA3 S-COLA FSAR Chap 2 Hydrology Review Calc Support)
  • ML110270356  + (COL Hearing - Fw: 3 Million Visitor Recreation Days Annually at Lake Anna)
  • ML18267A212  + (COL Hearing - Fws Biological Opinion for Turkey Point Units 6 and 7)
  • ML103560140  + (COL Hearing - North Anna 3 Cola Public Documents)