ML110030216
| ML110030216 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 12/22/2010 |
| From: | Office of New Reactors |
| To: | NRC/NRO/DNRL/NWE1 |
| References | |
| +reviewedmmc1 | |
| Download: ML110030216 (3) | |
Text
1 PMTurkeyCOLPEm Resource From:
Comar, Manny Sent:
Wednesday, December 22, 2010 4:26 PM To:
Maria Morell; Russell Shearer; Antonio Fernandez; orthen, Richard; TurkeyCOL Resource; William Maher Cc:
Comar, Manny
Subject:
Draft RAI 5309 related to SRP Section 02.03.02 - Local Meteorology for the Turkey Point Units 6 and 7 combined license application.
Attachments:
draft RAI 5309_TPN.doc
- ToAll,
AttachedisthedraftofRAINo:5309,regardingsection02.03.02LocalMeteorologyfortheTurkeyPointUnits6and7 combinedlicenseapplication.
Ifyouneedaconferencecalltodiscussthequestion(s)ofthedraftRAIspleasecontactmeat3014153863.Unlessyou requestadditionalclarificationwewillnormallyissuetheRAIasfinalwithin3to5days,fromtoday.
MannyComar SeniorProjectManager NRO/DNRL/NWE1 NuclearRegulatoryCommission 3014153863 mailto:manny.comar@nrc.gov
Hearing Identifier:
TurkeyPoint_COL_Public Email Number:
132 Mail Envelope Properties (377CB97DD54F0F4FAAC7E9FD88BCA6D03EAF6FA4EE)
Subject:
Draft RAI 5309 related to SRP Section 02.03.02 - Local Meteorology for the Turkey Point Units 6 and 7 combined license application.
Sent Date:
12/22/2010 4:25:47 PM Received Date:
12/22/2010 4:25:49 PM From:
Comar, Manny Created By:
Manny.Comar@nrc.gov Recipients:
"Comar, Manny" <Manny.Comar@nrc.gov>
Tracking Status: None "Maria Morell" <mmorell@islinc.com>
Tracking Status: None "Russell Shearer" <rshearer@islinc.com>
Tracking Status: None "Antonio Fernandez" <Antonio.Fernandez@fpl.com>
Tracking Status: None "orthen, Richard" <richard.orthen@fpl.com>
Tracking Status: None "TurkeyCOL Resource" <TurkeyCOL.Resource@nrc.gov>
Tracking Status: None "William Maher" <William.maher@fpl.com>
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 559 12/22/2010 4:25:49 PM draft RAI 5309_TPN.doc 30714 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
1 Request for Additional Information No. 5309 Turkey Point Units 6 and 7 Florida P and L Docket No.52-040 and 52-041 SRP Section: 02.03.02 - Local Meteorology Application Section: Local Meteorology QUESTIONS from Siting and Accident Consequence Branch (RSAC) 02.03.02-***
Please clarify whether there is a typographical error in the third paragraph of PTN COL FSAR Section 2.3.2.1.6. The first sentence of the paragraph states that Table 2.3.2-201 contains information on 17 climatological observing stations; please clarify whether this paragraph should instead cite PTN COL FSAR Table 2.3.1-201.
02.03.02-***
SRP 2.3.2 Review Procedures 3c and 3d state, in part, that the impact of plant heat and moisture sources on plant design and operation should be determined. In FSAR Section 2.3.2.2, Potential Influence of the Plant and Its Facilities on Local Meteorology, please discuss:
- 1. The effects, if any, of salt and moisture deposition from the cooling towers on electrical transmission lines and other onsite electrical equipment, including transformers and the switchyard.
- 2. The potential, if any, for the cooling towers to increase the temperature and humidity at the HVAC intakes.