COL Docs - Vogtle Unit 4 - Acceptance of Requested Licensing Action LAR 22-003
ML22263A021
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/20/2022
From:
Office of Nuclear Reactor Regulation
To:
NRC/NRR/DNRL
References
Download: ML22263A021 (4)


Text

From:

Billy Gleaves Sent:

Tuesday, September 20, 2022 7:13 AM To:

Dorsey, Keith A.; Chamberlain, Amy Christine Cc:

Cayetano Santos; Victor Hall; Christopher Welch; James Gaslevic; Wendell Morton; Sheila Ray; Michael Waters; Norbert Carte; William Roggenbrodt; Stewart Bailey; Thomas Scarbrough; Nicole Coovert; Bradley Davis; Vogtle PEmails

Subject:

Vogtle Unit 4 - Acceptance of Requested Licensing Action LAR 22-003 (EPID L-2022-LLA-0130)

Keith and Amy, By letter dated September 9, 2022 (ADAMS No. ML22243A030), SNC submitted a license amendment/exemption LAR 22-003 for VEGP Unit 4. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with 10 CFR 50.90, an application for an amendment to a license must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.

This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal and discussions during the pre-licensing meeting on August 25, 2022, the NRC staff has estimated that this licensing request will take approximately 450 hours0.00521 days <br />0.125 hours <br />7.440476e-4 weeks <br />1.71225e-4 months <br /> to complete and billed to EPID L-2022-LLA-0130. The NRC staff expects to complete this review by January 7, 2022. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.

If you have any questions, please contact me.

Billy William (Billy) Gleaves Senior Project Manager NRR/Vogtle Project Office US Nuclear Regulatory Commission The contents of this message may be sensitive. If this message has been received in error, please delete it without reading it. Your receipt of this message is not intended to waive any applicable privilege. Do not disseminate this message without the permission of the author. Communications by this author do not represent NRC policy or staff positions and are not binding on the Commission.

Hearing Identifier:

Vogtle_COL_Docs_Public Email Number:

636 Mail Envelope Properties (DM6PR09MB48391586F9339E14BDF78EC49F4C9)

Subject:

Vogtle Unit 4 - Acceptance of Requested Licensing Action LAR 22-003 (EPID L-2022-LLA-0130)

Sent Date:

9/20/2022 7:12:36 AM Received Date:

9/20/2022 7:12:40 AM From:

Billy Gleaves Created By:

Bill.Gleaves@nrc.gov Recipients:

"Cayetano Santos" <Cayetano.Santos@nrc.gov>

Tracking Status: None "Victor Hall" <Victor.Hall@nrc.gov>

Tracking Status: None "Christopher Welch" <Christopher.Welch@nrc.gov>

Tracking Status: None "James Gaslevic" <James.Gaslevic@nrc.gov>

Tracking Status: None "Wendell Morton" <Wendell.Morton@nrc.gov>

Tracking Status: None "Sheila Ray" <Sheila.Ray@nrc.gov>

Tracking Status: None "Michael Waters" <Michael.Waters@nrc.gov>

Tracking Status: None "Norbert Carte" <Norbert.Carte@nrc.gov>

Tracking Status: None "William Roggenbrodt" <William.Roggenbrodt@nrc.gov>

Tracking Status: None "Stewart Bailey" <Stewart.Bailey@nrc.gov>

Tracking Status: None "Thomas Scarbrough" <Thomas.Scarbrough@nrc.gov>

Tracking Status: None "Nicole Coovert" <Nicole.Coovert@nrc.gov>

Tracking Status: None "Bradley Davis" <Bradley.Davis@nrc.gov>

Tracking Status: None "Vogtle PEmails" <Vogtle.PEmails@usnrc.onmicrosoft.com>

Tracking Status: None "Dorsey, Keith A." <kadorsey@southernco.com>

Tracking Status: None "Chamberlain, Amy Christine" <acchambe@southernco.com>

Tracking Status: None Post Office:

DM6PR09MB4839.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3475 9/20/2022 7:12:40 AM Options Priority:

Normal

Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: