Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- STC-17-070, Acceptance Letter - Brachytherapy Gamma Knife (H313) and Other Medical Uses - December 4 - 8, 2017, Houston Tx + (20:34:28, 8 January 2025)
- ML17213A660 + (20:34:28, 8 January 2025)
- L-82-487, Forwards Operating Procedure Guidelines for Detection of Boron Dilution,Supplementing Describing Interim Measures to Detect Occurrences of Inadvertent Boron Dilution Until Alarm Sys Is Installed on Late 1983 + (20:34:30, 8 January 2025)
- L-82-478, Forwards Addl Info Re Core Exit Thermocouples in Response to Request.Representative Core Exist Temp Will Be Selected from Upper End of Temp Distribution + (20:34:32, 8 January 2025)
- L-82-486, Confirms 821102 Telcon Re Util Commitment to Provide Protective 1-h Thermal Wrap on HVAC Ducts Traversing Fire Area 48 from Penetration 3 to Penetration 4 & from Penetration 5 to Penetration 6 + (20:34:34, 8 January 2025)
- ML17213A645 + (20:34:37, 8 January 2025)
- ML17213A644 + (20:34:38, 8 January 2025)
- ML17213A637 + (20:34:40, 8 January 2025)
- ML17213A638 + (20:34:40, 8 January 2025)
- L-82-472, Forwards Response to NRC Request Re Boron Dilution Sys Alarm,Per FSAR Question 440.28.Util Will Install Redundant Alarm to Alert Operators to Boron Dilution Transient + (20:34:42, 8 January 2025)
- ML17213A636 + (20:34:42, 8 January 2025)
- L-82-474, Forwards Description of Mods to Iodine Removal Sys,Per 821021 Discussion Re Offsite Dose Models + (20:34:44, 8 January 2025)
- L-82-473, Forwards Info on How Unit 1 Natural Circulation Cooldown Analysis Is Applicable to Unit 2.Unit 2 Parameters Almost Identical to Unit 1 Parameters + (20:34:49, 8 January 2025)
- L-82-480, Forwards Addl Info Requested Re Confirmatory Piping Analysis Open Items + (20:34:51, 8 January 2025)
- L-82-475, Forwards C-E Proprietary Rept Response to Questions on Cesec. Rept Withheld (Ref 10CFR2.790) + (20:34:53, 8 January 2025)
- L-82-470, Forwards Reactor Protection Sys Matrix Mockup Fault Isolation & Surge Withstand Qualification Test Rept,Fl Power & Light,St Lucie Unit 2 + (20:34:55, 8 January 2025)
- ML17213A626 + (20:34:55, 8 January 2025)
- ML17213A621 + (20:34:57, 8 January 2025)
- L-82-454, Forwards Revision 4 to Environ Qualification Rept & Guidebook, Vols 2-4,for safety-related Electrical Equipment.Responses to NRC Comments Identified During NRC Site Audit Encl + (20:34:58, 8 January 2025)
- ML17213A615 + (20:35:03, 8 January 2025)
- ML17213A614 + (20:35:04, 8 January 2025)
- L-82-467, Forwards Addl Info Re Fire Protection Issues,In Response to NRC Request at 821021 Meeting.Info Consists of Discussion of Combustion Properties of Control Room Panelling & Description of Fire Stop Testing + (20:35:05, 8 January 2025)
- ML17213A606 + (20:35:07, 8 January 2025)
- L-82-465, Forwards Revision to Loose Parts Monitoring Sys Training Program Previously Submitted in + (20:35:08, 8 January 2025)
- ML17213A605 + (20:35:08, 8 January 2025)
- ML17213A601 + (20:35:10, 8 January 2025)
- ML17213A598 + (20:35:11, 8 January 2025)
- ML17213A600 + (20:35:11, 8 January 2025)
- L-82-466, Forwards Responses to Findings Identified During 820831-0902 Instrumentation & Control Audit + (20:35:12, 8 January 2025)
- L-82-455, Forwards Proprietary Final Assessment of St Lucie 2 Fuel Structural Integrity Under Faulted Conditions, CEN-187(1)-P,Revision 1-P & St Lucie 2 Fuel & CEA Design Summary Evaluation Rept, CEN-222(1)-P.Repts Withheld + (20:35:14, 8 January 2025)
- L-82-450, Forwards Proprietary Response to NRC Questions on Implementation of St Lucie Unit 2 Rod Bow & Grid Spacing Penalties to Resolve Action Items Identified in SER (NUREG-0843).Withheld (Ref 10CFR2.790) + (20:35:16, 8 January 2025)
- ML17213A583 + (20:35:18, 8 January 2025)
- L-82-448, Forwards Const/Startup Monthly Progress Rept for Sept 1982 + (20:35:19, 8 January 2025)
- ML17213A582 + (20:35:19, 8 January 2025)
- L-82-449, Informs That All Generic Ltrs Through 82-14 Applicable to Facility Have Been Reviewed & Required Responses Submitted + (20:35:21, 8 January 2025)
- ML17213A576 + (20:35:23, 8 January 2025)
- ML17213A574 + (20:35:24, 8 January 2025)
- ML17213A573 + (20:35:26, 8 January 2025)
- L-82-439, Forwards Addl Info Re Onsite Ac Power Sys Bus Tie Interlocks + (20:35:27, 8 January 2025)
- ML17213A572 + (20:35:27, 8 January 2025)
- L-82-440, Advises of Request for Proposal to Provide Criteria for Special Lifting Devices to Demonstrate Equivalency W/ Guideline 4 of NUREG-0612, Control of Heavy Loads. Addl Info Will Be Provided as Soon as Possible Re 821007 Telcon + (20:35:29, 8 January 2025)
- ML17213A568 + (20:35:31, 8 January 2025)
- ML17213A567 + (20:35:32, 8 January 2025)
- ML17213A565 + (20:35:33, 8 January 2025)
- ML17213A564 + (20:35:34, 8 January 2025)
- ML17213A563 + (20:35:35, 8 January 2025)
- L-82-433, Forwards Response to Question 410.52 Re Fire Protection Requirements + (20:35:36, 8 January 2025)
- ML17213A558 + (20:35:36, 8 January 2025)
- L-82-434, Forwards List of Engineering & Const Items That Are Not Expected to Be Completed at Core Load & Justification for Operation Prior to Completion of Items + (20:35:38, 8 January 2025)
- L-82-429, Forwards Util Responses to NRC Concerns Re Inadequate Core Cooling Instrumentation,Per 820914 Telcon W/Nrc. Qualification Testing of Heated Junction Thermocouple Sys Scheduled for Completion by 821015 + (20:35:40, 8 January 2025)
- L-82-431, Forwards Alden Research Lab, Performance Evaluation of Containment Sump at Full-Scale,St Lucie Nuclear Power Station 2. Submittal Completes Commitment to Provide SER Confirmatory Info on Vortex Testing + (20:35:42, 8 January 2025)
- ML17213A554 + (20:35:42, 8 January 2025)