ML17213A563

From kanterella
Jump to navigation Jump to search
Requests Addl Info Re Fuel Analysis in Order to Complete Review of SER Confirmatory Issue
ML17213A563
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/01/1982
From: Kerrigan J
Office of Nuclear Reactor Regulation
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8210180237
Download: ML17213A563 (4)


Text

io Distributi on:-qI NRC PDR Local PDR RHartifield, MPA TERA CBerlinger NSIC OELD VNeres DPowers JLee Region 2

Docket No. 50-389 TNovak RVollmer SHanauer JDKerrigan Dr. Robert E. Uhrig, Vice Presid88ttson IE Advanced Systems and TechnologyHThompson ACRS (16)

Florida Power 8 Light Company LBInt3 Reading Post Office Box 529100 Miami, Florida 33152

~

wr oe o/

oo

~

Dear Dr. Uhrig:

Subject:

St. Lucie Plant, Unit 2 FSAR - Request for Additional Information Regarding Fuels 2

o To enable us to completeour review of the remaining items that comprise a

confirmatory issue regarding fuels analysis, please submit (a) identification of the analytical code employed (or description of the cal cul ational method used),

(b) numerical result, and (c) a conclusion that the acceptance criterion will be met for the expected component lifetime for the following:

a.

fuel assembly,,fuel rod, burnable poison rod, and control element assembly stress (SER section 4.2.3.1 (a));

b.

fuel assembly, fuel rod, burnable poison rod, and control element assembly strain (SER section 4.2.3.1 (b));

c.

fuel assembly and fuel rod strain fatigue (SER sectin 4.2.3.1.(c));

d.

control element assembly fretting (SER section 4.2.3.1 (d));

o e.

control element assembly axial growth (SER section 4.2.3.1. (g)); and

,burnwable poison rod pressure (SER section 4.2.3.1 (h)).

~/J 9

Recently, these items were identified in our letter to you dated September 10',

1982.

Prior to that we provided on 8/31/82 your Bethesda Office a.copy of'- tt1e request for this information.

Please provide us your schedule for supplying this information.

Contact Mr. Nerses (301-492-7318),

St. Lucie 2 Project Manager, if you desire, any discussion or clarification of the enclosed report.

(

Si nce rely,

/s 8240l80237 82l001 PDR ADDCK 05000389 XE..

PDR Janis D. Kerrigan, Acting Chief Licensing Branch No.

3 Division of Licensing OFFICE lP SURNAME$

DATEf NRC FORM 318 (10-80) NRCM 0240

~

~

~

~

'/82--'-

--9%--/t'8Z'

~ ~ o

~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~

~

OFFlClAL.RECORD COPY

~ ~

~

~

~

~

~

~

~ ~ o ~ ~ o ~ ~ ~ ~

~

~ ~ ~ ~ ~ ~ ~ ~ o ~ $

o ~ ooooo ~ ooo

~ ~ ~

~ ~ ~ ~ ~ ~

~ ~ ~ o ~ ~ ~ ~ ~ ~ ~

A 1 USGPO: 981~980

C'

<f N

i I

h

~c Q ST.

LUCIE Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Pober

& Light Company P. 0.

Box 529100 Miami, Florida 33152 Harold F. Reis, Esq.

Low.nstein, Newman, Reis, Axelrad

& Toll 1025 Connecticut

Avenue, N.W.

Washington, D.C.

20036 Norman A. Coll, Esq.

Steel Hector

& Davis 1400 Southeast First National Bank Building Miami, Florida 33131 Mr. Martin H. Hodder 1131 N.

E. 86th Street Miami, Fl orida 33138 Resi dent Inspector St.. Lucie Nuclear Power Station c/o U. S. Nuclear Regulatory Coranission 7900 South AlA Jensen Beach, Florida 33457 U. S. Nuclear Regulatory Comnission 101 Marietta Street Suite 3100

Atlanta, Georgia 30303

Og "E

~Ma, 4E sa p'l