Forwards Request for Addl Info Re 10CFR50,App R Sections Iii.G & Iii.L.Info Required to Complete Review of Fire Protection of Safe Shutdown Capability
ML17213A568
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/29/1982
From: Kerrigan J
Office of Nuclear Reactor Regulation
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8210190056
Download: ML17213A568 (3)


Text

SEP pg~

Docket No. 50-389 Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power 8 Light Company Post Office Box 529100 MiatRi, Florida 33152

Dear Dr. Uhrig:

Subject:

St. Lucie Plant, Unit 2 FSAR - Request for Additional Information Regarding 10 CFR 50, Appendix R. Sections III G and III L

Enclosed, please find additional request for information we require before completing our review of the fire protection of safe shutdown capability, as documented in our SER for St. Lucie 2.

(A'opy of the request for additional information was provided to your Bethesda office on 9/1/82).

Response

to the enclosed request should be submitted by October 6, 1982.

If you cannot meet this date, please inform us within seven days after receipt of this letter of the date you plan to submit your responses.

Please contact Mr. Nerses (f01-492-7318), St. Lucie 2 Project Manager, if you desire any discussion or clarification of the enclosed report.

Sincerely, Janis D. Kerrigan, Acting Chief Licensing Branch No.

3 Division of Licensing

Enclosure:

As stated:

cc:

See next page 8210190056 820929 PDR ADDCK 09000389 F

PDR Distribution:

16 ACRS Docket 50-389 NRC PDR Local PDR TERA NSIC OELD VNerses JLee TNovak JDKe rrigan IE RVollmer SHanauer RMattson HThompson RHartifield, MPA OParr JRi dgely Region II OFFICE/

SURNAMEiI OATS 5

~ ~ ~ ~IQ)g/1 eg3o ~ ooo

~ ~ ~ IgO)O

~ 0 gt)O

~ ~ ~ ~

~

0QL4

~

~ ~ ~

b i

~ ~

~ ~

0$

0 ~ 0 ~

~ ~ ~ ~tDLofAQ)$8

~ ~

TNovak

~ 0 ~ 40

~I~\\ ~ 0 ~ 0 ~

~\\ ~ ~ ~

9/

/82 LB¹3 eading NRC FORM 318 (10-80) NRCM 0240 OFFICtAL RECORD COPY USGPO: 1981~~960

Pw' Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology florida Power 5 Light Company P. 0.

Box 529100 Miami, Florida 33152 Harold F. Reis, Esq.

Lowenstein, Newman, Reis, Axelrad 8 Toll 1025 Connecticut

Avenue, N.W.

Vashington, D.C.

20036 Norman A. Coll, Esq.

Steel Hector 8 Davis 1400 Southeast First National Bank Building Miami, Florida 33131 Mr. Martin H. Hodder 1131 N.

E. 85th Street Miami, Fl orida 33138 Resident Inspe'ctor St. Lucie Nuclear Power Station c/o.U. S. Nuclear Regulatory Comnission 7900 South AlA Jensen Beach, Florida 33457 U. S. Nuclear Regulatory.

Commission 101 Marietta Street Sui te 3100

Atlanta, Georgia 30303

ENCLOSURE St. Lucie Plant, Unit 2 Docket No. 50-389 AUXILIARYSYSTEMS BRANCH

'EQUEST FOR ADDITIONAL INFORMATION 10 CFR 50, APPENDIX R, SECTI'ONS III.G AND III.L 410. 52 (Appendix R)

The applicant provided a brief description of the methodology used to review the plant against the requirements of Appendix R

as a response to CMEB guestion 280.25 dated March 1982.

In a meeting with the appltcant in May 1982, the applicant committed to define "fire areas" as "fire zones" and redefined "fire areas" to be in accordance with Appendix R. It is therefore not clear whether the response to CMEB 280.25 is still correct.

The appli-cant also provided an expanded discussion of the methodology used to verify compliance with Appendix R by means of telecons but has not documented this expanded discussion.

Therefore the applicant should:

1) verify that the response to CMEB 280.25. is still appropriate,
2) verify that a fire is assumed to destroy all equipment/cables wtthin a fire area and 3) discuss the methods used to identify whtcli.cables or pieces of equipment must be protected or re1ocated.