Docket No.: 50-389 OCT 3 6 1982 APPLICANT:
Flordia Power and Light Company, (FP8L)
FACILITY:
St. Lucie Plant, Unit 2
SUBJECT:
SUMI1ARY OF t1EETING HELD IN BETHESDA, t1ARYLAND WITH FP&L ON
',OCTOBER 21, 1982 REGARDING LIGHT LOADS The staff stated that the recent FP&L submittal (L-82-393 dated 9/3/82) provides most of the inforMtion needed by the staff.
Therefore, it is not necesaary for FP&L to do an analysis of light loads over the vessel.
FP&L further provided clarification that the individual items listed in
"'Attachment 1 of the above mentioned FP&L letter, w'hich potentially can be carried into the fuel Ihandling building, were reviewed for the.,ir potential impact, on Ispent fuel in the '.event of a dropped accident.
- From, the results of thiseview FP&L concluded that not more than one spent fuel assembly would.be struck.
A previous =PPK. analysis (which is in the FSAR) of a broken spent fuel assembly showed no dopes exceeding regulatory limits.
On another Auxiliary ',Systems Branch matter, the staff reminded and FP&L agreed that they had made a commitment to provide the results of the auxiliary feedwater pump endurance test.
FP&L indicated that by 12/30/82 they expect to provide the results of the test to the staff.
The staff requested and FP&L agreed to provide the staff the results of the water ham0ler test on St.:-L'ucie 2.
This will be about 1/28/83.
Attachment:
Meeting Attendees cc w/attachtRe'nt:
',S'ee next page Original Signed By>
Victor Nerses, Project Manager Licensing Branch NO.
3 Division of Licensing 8211100035 821026 PDR ADOCK 05000389 A
PDR DL:L g3 I </J c//82 DL:
3 G
ton OFFICE/
SURNAME$
"0/g$ /82 DATE Q NRG FORM 318 (10-80) NRCM 0240 OFFICtAL RECORD COPY USG PO: 1981-335.960
7 t'ai~4
~
a ST.
LUCIE Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power 8 Light Company P. 0. Box 5291000 Miami, Florida 33152 Harold F. Reis.
Esq.
Lowenstein, Newman, Reis, Axelrad 8
Toll'025 Connecticut Avenue, N.W.
Washington, D. C.
20036 Norman A. Coll, Esq.
Steel Hector 8 Davis 1400 Southeast First National Bank Building.
Miami, Flordia 33131 Mr. Martin H.. Hodder 1131 N., E. 86th Street Miami, Flordia 33138 Resident Inspector St. Lucie Nuclear Power Station c/o U. S. Nuclear-Regulatory Commission 7900 South A1A Jensen Beach, Flordia 33457 I
RegionaI iidminetrator - Region fI U. S. Nuclear Regulatory Commission 101 Mar ietta Street Suite 3100 Atlanta, Georgia 30303
'ATTENOEEE Names V. Nerses R. Lobel J. Ridgely J.
Sheetz R.
Sweeney Pr anizatien NRC NRC NRC FPaL NRC
MEETING
SUMMARY
Oocument Control (50-389)
NRC PDR L POR NSIC TERA-LB~3 Reading J.
Lee G. Knighton Project Manager V. Nerses
- Attorney, OELO E. L. Jordon Regional Administrator, Region J.
M. Taylor PARTICIPANTS NRC V.. Nerses R. Lobel J. Ridgely R.
Sweeney