ML17213A614

From kanterella
Jump to navigation Jump to search
Notification of Date Change for 821012 Meeting W/Util in Bethesda,Md to Discuss Procedure for Leak Testing Pressure Isolation Valves.Meeting Originally Scheduled for 821008
ML17213A614
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/30/1982
From: Nerses V
Office of Nuclear Reactor Regulation
To: Kerrigan J
Office of Nuclear Reactor Regulation
References
NUDOCS 8211030286
Download: ML17213A614 (7)


Text

~,

~ >>

~s IlEOog

~ gM

~o

+

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket No.:

50-389 egp 3 p 1962 MEMORANDUM FOR:

J, Ker rigan, Acting Branch Chief, Licensing Branch No. 3, DL FROM:

SUBJECT:

DATE AND TIME'OCATION:

PURPOSE:

V. Nerses, Project Manager, Licensing Branch No. 3, DL NOTICE OF MEETING WITH FP8lL ON ST.

LUCIE 2 REGARDING PRESSURE ISOL'ATION (VALVES LEAK TESTING l2-Friday, October,

1982 8:30 am Room 16 B-1 Triangle Towers Building 4358 Cordell Avenue

Bethesda, Maryland To discuss the procedure for leak testing pressure isolation valves.

See agenda

attached, PARTICIPANTS:

NRC F. Cherny, G,

Hammer, D. Hoffman. V, Nerses, et, al, FP8lL D. Jennings, J. Sheetz, et, al, I>>' DVl Ebasco and CE Personnel

-as necessary,

Attachment:

As stated cc:

See next page Victor Nerses, Project Manager Li'censtng Branch No.

3 Division of Licensing SolaOSOSlS, Sso9so PDR ADGCK 05000389 A

PDR

~t 4

I

/

Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power 5 Light Company P. 0.

Box 529100 Miami, Florida 33152 Harold f. Reis, Esq.

Lowenstein, Neman, Reis, Axelrad

& Toll 1025 Connecticut

Avenue, N.W.

Washington, D.C.

20036 Norman A. Coll, Esq.

Steel Hector 8 Davis 1400 Southeast First National Bank Building Miami, Florida 33131 Mr. Martin H. Hodder 1131 N.

E. 86th Street Miami, Fl orida 33138 Resident Inspector St. Lucie Nuclear Power Station c/o U. S. Nuclear Regulatory Cormission 7900 South AlA Jensen Beach, Florida 33457 U. S. Nuclear Regulatory Comnission 101 Marietta Street Suite 3100

Atlanta, Georgia 30303

St. Lucie.Plant,.Unit 2 Heeting Agenda 1.:

Discuss the draft test procedure for pressure isolation valve

'eakage testing which was informally submitted to NRC.

2.

Discuss the pressure isolation valves that are required by the procedure to be tested.

3.

Discuss the methods of leakage rate testing.

4.

Discuss the revised test procedure for each effected pressure isolation valve.

5.

Summary

~ p

~lk w

~ I ~

~

~e

~

~

M ETING NOTICE

~Ot C

1 (504 NRC PDR L PDR

-TERA NSIC LB83 Rdg.

JLee N

Eh E.

Case D. Eisenhut/R.

Purple T. t/ovak J.

Youngblood

'A. Schwencer J. Kerrigan, Acting E. Adensam C.

Thomas G. Lainas W. Russell D. Crutchfield T. Ippolito J.

P. Knight W. Johnston, D. Muller T. Speis R. Houston L. Rubenstein F. Schroeder M. Ernst J.

Kramer

Attorney, OELD OIE Regional Administrator ACRS ('16)

OSD (T)

PARTICIPANTS NRC:

, Region 2

FCherny

'GHammer DHoffman

VNerses, I>"3i"'~'

O.

r li l

I j