~s IlEOog
~ gM
~o
+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket No.:
50-389 egp 3 p 1962 MEMORANDUM FOR:
J, Ker rigan, Acting Branch Chief, Licensing Branch No. 3, DL FROM:
SUBJECT:
DATE AND TIME'OCATION:
PURPOSE:
V. Nerses, Project Manager, Licensing Branch No. 3, DL NOTICE OF MEETING WITH FP8lL ON ST.
LUCIE 2 REGARDING PRESSURE ISOL'ATION (VALVES LEAK TESTING l2-Friday, October,
1982 8:30 am Room 16 B-1 Triangle Towers Building 4358 Cordell Avenue
- Bethesda, Maryland To discuss the procedure for leak testing pressure isolation valves.
See agenda
- attached, PARTICIPANTS:
NRC F. Cherny, G,
- Hammer, D. Hoffman. V, Nerses, et, al, FP8lL D. Jennings, J. Sheetz, et, al, I>>' DVl Ebasco and CE Personnel
-as necessary,
Attachment:
As stated cc:
See next page Victor Nerses, Project Manager Li'censtng Branch No.
3 Division of Licensing SolaOSOSlS, Sso9so PDR ADGCK 05000389 A
~t 4
I
/
Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power 5 Light Company P. 0.
Box 529100 Miami, Florida 33152 Harold f. Reis, Esq.
Lowenstein, Neman, Reis, Axelrad
& Toll 1025 Connecticut
- Avenue, N.W.
Washington, D.C.
20036 Norman A. Coll, Esq.
Steel Hector 8 Davis 1400 Southeast First National Bank Building Miami, Florida 33131 Mr. Martin H. Hodder 1131 N.
E. 86th Street Miami, Fl orida 33138 Resident Inspector St. Lucie Nuclear Power Station c/o U. S. Nuclear Regulatory Cormission 7900 South AlA Jensen Beach, Florida 33457 U. S. Nuclear Regulatory Comnission 101 Marietta Street Suite 3100
- Atlanta, Georgia 30303
St. Lucie.Plant,.Unit 2 Heeting Agenda 1.:
Discuss the draft test procedure for pressure isolation valve
'eakage testing which was informally submitted to NRC.
2.
Discuss the pressure isolation valves that are required by the procedure to be tested.
3.
Discuss the methods of leakage rate testing.
4.
Discuss the revised test procedure for each effected pressure isolation valve.
5.
Summary
~ p
~lk w
~ I ~
~
~e
~
~
M ETING NOTICE
~Ot C
-TERA NSIC LB83 Rdg.
JLee N
Eh E.
Case D. Eisenhut/R.
Purple T. t/ovak J.
Youngblood
'A. Schwencer J. Kerrigan, Acting E. Adensam C.
Thomas G. Lainas W. Russell D. Crutchfield T. Ippolito J.
P. Knight W. Johnston, D. Muller T. Speis R. Houston L. Rubenstein F. Schroeder M. Ernst J.
Kramer
- Attorney, OELD OIE Regional Administrator ACRS ('16)
OSD (T)
PARTICIPANTS NRC:
, Region 2
FCherny
'GHammer DHoffman
- VNerses, I>"3i"'~'
O.
r li l
I j