Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17289B070 + (10:19:53, 8 January 2025)
- GO2-92-269, Discusses Inservice Testing Program for Pumps & Valves & Forwards Revised Relief Requests Covering Standby Svc Water Sys,Lpcs,Rhr,Hpcs & RCIC Sys & Main Steam Sys.Original Requests Denied by NRC in + (10:19:54, 8 January 2025)
- ML17289B068 + (10:19:54, 8 January 2025)
- ML17289B064 + (10:19:57, 8 January 2025)
- ML17289B062 + (10:19:58, 8 January 2025)
- IR 05000397/1992037 + (10:19:59, 8 January 2025)
- IR 05000397/1992042 + (10:20:17, 8 January 2025)
- ML17289B056 + (10:20:18, 8 January 2025)
- GO2-92-271, Responds to NRC Re Violations Noted in Insp Rept 50-397/92-35.Corrective Actions:Rev Will Be Made of Current Policy (Nuclear Operating Std,NOS-38,Radiation Protection) W/Regard to Release of Potentially Contaminated Matl + (10:20:19, 8 January 2025)
- ML17289B050 + (10:20:20, 8 January 2025)
- GO2-92-397, Forwards Annual Exercise 92,Emergency Preparedness Planning for Unexpected on 921208 for WNP Unit 2 + (10:20:21, 8 January 2025)
- ML17289B047 + (10:20:23, 8 January 2025)
- ML17289B037 + (10:20:24, 8 January 2025)
- ML17289B044 + (10:20:24, 8 January 2025)
- GO2-92-265, Monthly Operating Rept for Nov 1992 for Wnp,Unit 2 + (10:20:25, 8 January 2025)
- GO2-92-266, Forwards Revised Monthly Operating Rept for Sept 1992 for Wnp,Unit 2 + (10:20:26, 8 January 2025)
- GO2-92-263, Submits Guarantee of Payment of Deferred Premium,Per 10CFR140.21 + (10:20:28, 8 January 2025)
- GO2-92-261, Requests Waiver of Compliance from TS 3.8.1.1 Re Ac Sources Operating as Result of Action Statement Entered on 921130 When Div 2 EDG Declared Inoperable Due to Failure to Achieve Required Voltage within TS Specified Time + (10:20:29, 8 January 2025)
- ML17289B025 + (10:20:31, 8 January 2025)
- ML17289B024 + (10:20:31, 8 January 2025)
- ML17289B023 + (10:20:32, 8 January 2025)
- ML17289B022 + (10:20:33, 8 January 2025)
- GO2-92-256, Forwards Supplement to 920916 Response to NRC Request for Addl Info on VIPRE-01 MOD-02 Documentation EPRI NP-2511-CCM, VIPRE-01, Thermal-Hydraulic Analysis Code for Reactor Cores + (10:20:34, 8 January 2025)
- ML17289B018 + (10:20:35, 8 January 2025)
- ML17289B017 + (10:20:36, 8 January 2025)
- IR 05000397/1992028 + (10:20:43, 8 January 2025)
- GO2-92-258, Forwards Amend to License NPF-21,consisting of Proposed Change,Revising TS 6.0 to Change Composition of Plant Operations Committee & to Allow Implementation of Staff Reorganization Intended to Be Responsive to Plant Changes + (10:20:44, 8 January 2025)
- ML17289B010 + (10:20:44, 8 January 2025)
- IR 05000397/1992031 + (10:20:55, 8 January 2025)
- ML17289B003 + (10:20:57, 8 January 2025)
- ML17289B002 + (10:20:58, 8 January 2025)
- ML17289B000 + (10:20:59, 8 January 2025)
- IR 05000397/1992038 + (10:21:01, 8 January 2025)
- ML17289A996 + (10:21:02, 8 January 2025)
- ML17289A994 + (10:21:03, 8 January 2025)
- GO2-92-255, Responds to Potential Training Program Weaknesses Noted in Insp Rept 50-397/92-27.Corrective Actions:Requalification Training Program Expertise Will Continue to Be Integrated in Upcoming Initial License Campaign + (10:21:04, 8 January 2025)
- GO2-92-252, Monthly Operating Rept for Oct 1992 for Washington Nuclear Plant 2 + (10:21:08, 8 January 2025)
- GO2-92-248, Forwards Containment Atmosphere Control Sys (CAC) Summary of Issues Rept.Rept Summarizes CAC Sys Reportable Events That Occurred in 1991 & Early 1992 + (10:21:10, 8 January 2025)
- ML17289A988 + (10:21:10, 8 January 2025)
- ML17289A985 + (10:21:12, 8 January 2025)
- 05000397/LER-1992-038, :on 921014,technicians Failed to Perform Main Condenser Offgas Sample Analysis Per TS 3.3.7.12,due to Personnel Error & Inadequate Work Mgt Methods.C/A Included Counseling,Equipment Repair & Further Training + (10:21:14, 8 January 2025)
- ML17289A982 + (10:21:15, 8 January 2025)
- GO2-92-247, Responds to Violations Noted in Augmented Insp Team Rept 50-397/92-30.Corrective Actions:Failure to Perform Technical Work at Acceptable Level of Detail & Quality Addressed + (10:21:16, 8 January 2025)
- ML17289A978 + (10:21:18, 8 January 2025)
- ML17289A976 + (10:21:18, 8 January 2025)
- GO2-92-250, Responds to NRC Re Violations Noted in Insp Rept 50-397/92-25.Corrective Actions:Log Sheet for Pink Copy of Mwr Will Be Proceduralized by 921130 + (10:21:19, 8 January 2025)
- GO2-92-245, Forwards Changes to Section 6 of Emergency Preparedness Plan (Epp),Rev 11 Re EALs & Figure 4.2 of Epp,Rev 12 Re Footnote Symbol for CR Supervisor & Shift Technical Advisor Positions on Subj Figure Entitled, ...Organization + (10:21:21, 8 January 2025)
- ML17289A971 + (10:21:21, 8 January 2025)
- 05000397/LER-1992-040, :on 920930,determined That Start & Load Time for Standby & HPCS DG Not Measured During Monthly Surveillance Testing.Caused by Deficiencies in Mgt Methods. Expedited Effort Initiated to Amend Procedure + (10:21:23, 8 January 2025)
- ML17289A962 + (10:21:25, 8 January 2025)
- IR 05000397/1992033 + (10:21:27, 8 January 2025)
- ML17289A959 + (10:21:28, 8 January 2025)