Forwards Insp Rept 50-397/92-36 on 921005-1115 & Notice of Violation
ML17289B068
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/14/1992
From: Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17289B069 List:
References
NUDOCS 9212290120
Download: ML17289B068 (6)


See also: IR 05000397/1992036

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM {RIDS)

I

ACCESSION NBR:9212290120

DOC.DATE: 92/12/14

NOTARIZED: NO

DOCKET

-'j~',;FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe

05000397

AUTH.NAME

AUTHOR AFFILIATION

ICHARDS,S.A.

Region

5 (Post

820201)

RECIPE

NAME

RECIPIENT AFFILIATION

SORENSEN,G.C.

Washington Public Power Supply System

SUBJECT:

Forwards insp rept 50-397/92-36

on 921005-1115

S notice of

violation.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTR

I

ENCL

I

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

I

7

RECIPIENT

ID CODE/NAME

PD5

PD

INTERNAL: ACRS

AEOD/DEIB

AEOD/TTC

NRR MORISSEAU,D

NRR/DLPQ/LPEB10

NRR/DREP/PEPB9H

NRR/PMAS/ILRB12

0

REG FILE

02

RNAL

EGS(G/BRYCE P J ~ H ~

NSIC

COPIES

LTTR ENCL

1

1

2

2

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

CLIFFORD,J

AEOD

AEOD/DSP/TPAB

DEDRO

NRR/DLPQ/LHFBPT

NRR/DOEA/OEAB

NRR/PMAS/ILPB

NUDOCS-ABSTRACT

OGC/HDS1

RGN5

FILE

01

NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1.

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

NOTE TO ALL 'RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOhI P 1-37 (E>:T. 504-'2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

26

ENCL

26

~

'

~g REJIG, fp0

4y

~i

i~

0O

IA

C

O~

r+

o~

+a*++

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE

WALNUTCREEK, CAUFORNIA94596-5368

Docket No.

50-397

December

14,

1992

Washington Public Power Supply System

P. 0.

Box 968

Richland,

Washington

99352

Attention:

Mr. G. C. Sorensen

Manager,

Regulatory

Programs

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION

REPORT

NO. 50-397/92-36)

This refers to the inspection

conducted

by Messrs.

W. P. Ang, D. L. Proulx and

K. E. Johnston of this office on October

5 through November

15,

1992 of

activities authorized

by

NRC Operating

License

No. NPF-21,

and to the

discussions

of findings held by the inspectors with Mr. J.

Baker and other

members of the Supply System staff at the conclusion of the inspection.

Areas examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examina-

tions of procedures

and representative

records,

interviews with personnel,

and

observations

by the inspectors.

Based

on the results of this inspection, it appears

that certain of your

activities were not conducted

in full compliance with NRC requirements,

as set

forth in the enclosed

Notice of Violation (Notice).

These violations indicate

weaknesses

in your corrective action program,

your Clearance

Order process,

and your plant painting program.

The resident inspector

found

a radiation

area

boundary sign down, the fourth posting problem identified by the resident

staff this year.

While these posting problems did not result in an overexpo-

sure

and were not individually of major significance,

they indicate that your

corrective actions for previous violations have not been fully effective.

In addition,

an operator

hung

a Danger Tag despite

a discrepancy

involving the

labels affixed to the electrical cubicle.

This cubicle had

been mislabeled

during painting activities.

Although in this case

no personal

injury, equip-

ment damage,

or operability concerns

resulted,

this violation is of particular

concern

because

deficiencies

in your painting program could result in similar

occurrences

with increased

consequences.

Your attention is also invited to Paragraph

10 of the enclosed report, which

discusses

a review of your corrective action tracking program.

While this

inspection did not identify any specific violations or deviations resulting

from poor performance of the program,

the findings indicate

a need for

improvement in your tracking of NRC commitments

and other actions.

9212290i20 92i214

PDR

ADOCK 05000397

8

PDR

i(p

0

t

P

4

You are required to respond to this letter and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should document the specific actions taken

and any additional

actions you plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine whether further

NRC enforcement action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790(a),

a copy of this letter, the enclosures,

and

your response will be placed in the

NRC Public Document

Room.

The response

directed

by this letter and the accompanying

Notice are not

subject to the clearance

procedures

of the Office of Management

and Budget

as

required

by the Paperwork Reduction Act of 1980,

Pub.

L.96-511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

~S.

.

ichards,

Acting Chief

Reactor

Projects

Branch

~

~

~

~

Enclosures:

1.

Notice of Violation

2.

Inspection

Report

No. 50-397/92-36

cc:

A. L. Oxsen, Acting Managing Director

J.

V. Parrish,

Assistant

Managing Director for Operations

J.

C. Gearhart,

equality Assurance Director

J.

W. Baker,

WNP-2 Plant Manager

A. G. Hosier,

WNP-2 Licensing Manager

G.

E. Doupe,

Esq.

Winston

5, Strawn

State of Washington

-3-

bcc w/copy of enclosure:

Docket File

Project Inspector

Resident

Inspector

B. Faulkenberry

J. Hartin

R.

Huey

P. Johnson

J. Clifford, NRR

G.

Cook

bcc w/o enclosure:

M. Smith

J. Bianchi

J. Zollicoffer

REGION V

r0

o

x

<<'K'n

1

12/1cf/92

12/rf/92

12/1'2

P

12/i /92

RHu

12//P/92

YES

NO

NO

YE

Q

NO

YES

NO

ES

NO

SRichards

12/11 /92

ES

NO

YES

NO