GO2-92-265, Monthly Operating Rept for Nov 1992 for Wnp,Unit 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1992 for Wnp,Unit 2
ML17289B036
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/30/1992
From: John Baker, Hutchison L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-92-265, NUDOCS 9212220254
Download: ML17289B036 (8)


Text

ACCEI ERAT DOCUMENT.DIST UTION SYSTEM REGULAT INFORMATION DISTRIBUTION STEM (RIDS)

FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAMg AUTHOR AFFILIATION HUTCHISOA>L.B.

Washington Public Power Supply System BAKER,J.W.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000397

SUBJECT:

Monthly operating rept for Nov 1992 for WNP,unit 2 W/921215 ltr.

DISTRIBUTION CODE:

IE2'4D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME PD5 LA CLIFFORDgJ COPIES LTTR ENCL 3

3 1

1 RECIPIENT ID CODE/NAME PD5 PD COPIES LTTR ENCL 1

1 INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN5 10 10 1

1 1

1 1

1 AEOD/DOA 1

1 NRR/DLP LPEB10 1

1 E

01 1

1 EXTERNAL: EG&G BRYCEiJ.H NSIC 1

1 1

1 NRC PDR 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 24

L 0

~l

\\

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 988

~ 3000 George Washington Way

~ Richland, Washington 99352 Docket No. 50-397 December 1$ 1992 GO2 Z6g U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT NOVEMBER 1992

'Transmitted herewith is the Monthly Operating Report for the month of November 1992 as required by our Technical Specifications 6.9.1.6.

Very truly yours, J. W. Baker WNP-2 Plant Manager (MD 927M)

LBH:kam CC:

Mr. W. H. Lovelace, NRC, Washington DC Mr. J. B. Martin, NRC Region V Ms. Dottie Sherman, ANI, Farmington CT Mr. C. Sorensen, NRC Resident Inspector (901A)

Mr. J. T. Wheelock, INPO Mr. F. Yost, UtilityData Institute PgR A ~>+ 9ij'isp Oc< pSppp39~

P8fk+ Piad'zaxw g

220008

l

'] l

~ f

OPERATING DATAREPORT WNP-2 DATE:

December 1, 1992 DOCKET: 50-397 2.

REPORTING PERIOD:

Nov-92 OUTAGE + ON-LINEHOURS:

720 4

5.

6.

7.

8.

UTILITYCONTACT:

Leonard Hutchison (509) 377-2486 LICENSED THERMALPOWER (MWt):

NAMEPLATERATING (GROSS MWe):

DESIGN ELECTRICALRATING (NET MWe):

MAXIMUMDEPENDABLE CAPACITY (GROSS MWe):

MAXIMUMDEPENDABLE CAPACITY (NET MWe):

3323 1200.9 1100 1129 1085 9.

IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:

None.

10.

POWER TO WHICH RESTRICTED, IF ANY (NET MWe):

REASONS FOR RESTRICTIONS, IF ANY:

None.

12.

13.

14.

15.

16.

17.

18.

19, 20.

21.

22.

23.

24.

25.

REPORT PERIOD HOURS HOURS REACTOR CRITICAL RX RESERVE SHUTDOWN HOURS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMALENERGY (hAVH)

GROSS ELECTRICALENERGY (MWH)

NET ELECTRICAL ENERGY (MWH)

UNIT SERVICE FACTOR UNIT AVAILABILITYFACTOR UNIT CAPACITYFACTOR (MDC NET)

UNIT CAPACITYFACTOR (DER NET)

UNIT FORCED OUTAGE RATE FORCED OUTAGE HOURS MONTH 720.0 720.0 0.0 666.2 0.0 2,092,588 712,510 678,919 92.5%

92.5%

86.9%

85.7%

0.0%

0.0 YEAR 8,040.0 5,014.0 0.0 4,763.9 0.0 15,090,109 5,128,190 4,862,977 59.3%

59.3%

55+7%

55.0%

16.9%

969.5 CUMULATIVE 69,824.2 48,404.7 340.4 46,563.7

. 381.7 134,705,931 44,984,010 43, 121,016 66.7%

67.2%

56.5%

56.1%

13.5%

7273 3 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION:

Refuelin uta e R-tartin A ril 16 1

for 4 da 27.

IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

A RAGE DAILYUNIT POWER LE L

MONTH:

NOVEMBER 1992 DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-397 WNP-2 NOVEMBER 1992 LB HUTCHISON (509) 377-2486 DAYAVERAGEDAILYPOWER LEVEL (MWe-NET)

DAYAVERAGEDAILYPOWER LEVEL (MWe-NET) 1087 17.

1092 2.

1089 18.

1092 1094 19.

1090 1090 20.

1057 1095 21.

48 6.

1084 22.

1080 49 8.

1090 24.

191 9.

1093 727 10.

1092 26.

1088 1092 27.

1109 12.

1091 28.

1125 13.

1060 29.

1126 14.

1079 30.

1116 15.

1092 16.

1090 INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVELIN MWe-NET FOR EACH DAY IN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE MEGAWATI'.

THESE FIGURES WILLBE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THAT WHEN MAXIMUMDEPENDABLECAPACITYIS USED FOR THE NET ELECTRICALRATINGOF THE UNIT,THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 100% LINE (OR THE RESTRICTED POWER LEVELLINE). IN SUCH CASES, THE AVERAGEDAILYUNITPOWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAINTHE APPARENT ANOMALY.

DOCKET NO.:

50-397 UNITNAME:

WNP-2 DATE:

DECEMBER 1, 1992 COMPLETED BY:

LB HUTCHISON TELEPHONE:

(509) 377-2486 UNIT SHUTDOWNS / REDUCTIONS REPORT PERIOD'OVEMBER 1992 NO.

DATE TYPE HOURS REASON METHOD LER NO SYSTEM COMPONENT 11/21/92 S

53.8 B

1 EB ELECON CAUSE &CORRECTIVE ACTION TO PREVENT RECURRENCE Generator was removed fromservice forcleaning ofhighvoltage insulators due to buildup of chemical deposits from cooling tower drift. Also, repaired source ofDryweilFDR leakage (RFW-V-10B). The plant was then returned to service.

SUl'@MARY:

WNP-2 incurred one scheduled outage in November as described above.

TYPE F-FORCED S-SCHED REASON A-EQUIP FAILURE B-MAINTOR TEST C-REFUELING D-REGULATORYRESTRICTION E-OPERATOR TRAINING&

LICENSE EXAM F-ADMIN G-OPER ERROR H-OTHER METHOD 1-MANUAL 2-MANUALSCRAM 3-AUTO SCRAM 4-CONTINUED 5-REDUCED LOAD 9-OTHER SYSTEM &COMPONENT EXHIBITF &H INSTRUCTIONS FOR PREPARATION OF DATAENTRY SHEET LICENSEE EVENT REPORT (LER) FILE (NUREG -0161)

0 4

~

~y

~

~

A 4