REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
it
ACCESSION NBR:9211020082
DOC.DATE: 92/10/17
NOTARIZED:
NO
DOCKET ¹
/
CIL:50-397
WPPSS Nuclear Project, Unit 2, Washington Public Powe
05000397
UTH.NAME
AUTHOR AFFILIATION
ILLER,L.F.
Region
5 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
SORENSEN,G.C.
Washington Public Power Supply System
SUBJECT:
Forwards insp rept 50-397/92-33
on 921005-09.No violations
or deviations
noted.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD5
INTERNAL: ACRS
AEOD/DEIB
AEOD/TTC
NRR MORISSEAUgD
NRR/DLPQ/LPEB10
NRR/DREP/PEPB9H
NUDOCS-ABSTRACT
OGC/HDS1
RGN5
FILE
01
RNAL: EGGG/BRYCE,J.H.
COPIES
LTTR ENCL
1
1
2
2
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
DEANiW.
AEOD/DSP/TPAB
DEDRO
NRR/DLPQ/LHFBPT
NRR/DOEA/OEAB
'RR/PMAS/ILRB12
IR
EG FI
02
NRC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NOTE TO ALL RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM P!-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
24
ENCL
24
)
II
~pg RKCy,
(4
Mp
~4
0
Cy
9~
)
I
cl
C
0
/y
0
)f**y+
UNITED STATES
NUCLEAR REGULATORYCOMMISSION
REGION V
1450 MARIALANE
WALNUTCREEK, CAUFORNIA94596-5368
Ocy yy 1992
Docket No. 50-397
Washington Public Power Supply System
P. 0.
Box 968
3000 George
Way
Richland,
Attention:
Hr.
G.
C. Sorensen,
Hanager,
Regulatory
Programs
SUBJECT:
NRC
INSPECTION
OF
WASHINGTON NUCLEAR PROJECT,
UNIT 2,
INSPECTION
REPORT 50-397/92-33
This refers to a routine announced
inspection
conducted
by Hr. D. Acker during
the period of October 5-9,
1992 of activities authorized
by
NRC License
No.
and to the discussion of his findings held with members of your staff
on October 8,
1992.
Areas
examined during this inspection
are described
in the enclosed
inspection
~
~
~
~
~
~
~
~
~
report.
Within these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
No violations or deviations of NRC requirements
were identified within the
scope of this inspection.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
Should you have'ny questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sin erely,
. Hiller,
.
Ch'ief,
Reactor Safety Branch
Enclosure:
Inspection
Report
No. 50-397/92-33
'P2li020082 92i017
ADOCK 05000397
6
~gg f
cc w/enclosure:
Hr. J.
W. Baker,
WNP-2 Plant Manager
Hr. A. G. Hosier,
WNP-2 Licensing Manager
Hr. J.
C. Gearhart,
guality Assurance
Director
Mr. G. E. Doupe,
Esq.,
Hr. J.
Y. Parrish,
Assistant
Managing Director for Operations
Hr. A. L. Oxsen, Acting Managing Director
State of Washington
Mr. H. H. Phi lips, Esq.
bcc w/enclosure:
P.
Johnson
Project Inspector
Resident
Inspector
G.
Cook
B. Faulkenberry
J. Hartin
Docket File
bcc w/o enclosure:
H. Smith
J. Zollicof eP
J.
Bianchi
D. Acker
/C/
H. Royack
y /(g/92
P. John
n
/
/92
[
g
EST COPY]
QUE T COPY]
[R
EST COPY]
E
/
NO
]
ES /
NO
] [
S /
NO
]
L. Hi
er
/0/
/92
[REQUEST
OP ]
[REQUEST
COPY]
[REQUEST COPY]
[YES /
0
]
[YES /
NO
]
[YES /
NO
]
[SEND TO
PDR ]
[YES /
NO
]
fl
l
0