Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20202D800 + (08:09:31, 8 December 2024)
- ML20202D799 + (08:09:32, 8 December 2024)
- 05000336/LER-1998-026-01, :on 981223,discovered That Pressurizer Spray Line Fatigue Limits Were Exceeded.Caused by Insufficient Thermal Effects Analysis.Design Mods Will Be Implemented to Ensure Compliance with ASME Code Requirements + (08:09:34, 8 December 2024)
- IR 05000348/1996003 + (08:09:35, 8 December 2024)
- ML20202D795 + (08:09:35, 8 December 2024)
- ML20202D793 + (08:09:36, 8 December 2024)
- IR 05000382/1997028 + (08:09:37, 8 December 2024)
- ML20202D790 + (08:09:38, 8 December 2024)
- ML20202D789 + (08:09:38, 8 December 2024)
- ML20202D786 + (08:09:39, 8 December 2024)
- ML20202D787 + (08:09:39, 8 December 2024)
- ML20202D783 + (08:09:40, 8 December 2024)
- 05000336/LER-1998-026, Forwards LER 98-026-00,re Exceeded Pressurizer Spray Line Fatigue Limits Due to Insufficient Thermal Effects Analysis. Commitments Made within Ltr,Encl + (08:09:41, 8 December 2024)
- ML20202D780 + (08:09:41, 8 December 2024)
- ML20202D779 + (08:09:42, 8 December 2024)
- ML20202D776 + (08:09:46, 8 December 2024)
- ML20202D775 + (08:09:47, 8 December 2024)
- ML20202D772 + (08:09:48, 8 December 2024)
- ML20202D773 + (08:09:48, 8 December 2024)
- ML20202D771 + (08:09:49, 8 December 2024)
- ML20202D770 + (08:09:50, 8 December 2024)
- ML20202D768 + (08:09:51, 8 December 2024)
- 05000277/LER-1997-008-02, :on 740705,logic Sys Functional Testing Did Not Contain All Required Testing Per TS Surveillance Requirements.Caused by Test Procedures Not Containing Required Testing.Untested Contacts Tested & Proved Operable + (08:09:53, 8 December 2024)
- ML20202D765 + (08:09:54, 8 December 2024)
- ML20202D763 + (08:09:54, 8 December 2024)
- 05000277/LER-1997-008, Forwards LER 97-008-00,reporting Discovery of safety-related Logic Components That Were Not Tested Per TS Surveillance Requirements on 740705 + (08:09:55, 8 December 2024)
- ML20202D759 + (08:09:56, 8 December 2024)
- ML20202D757 + (08:09:57, 8 December 2024)
- NSD-NRC-97-5449, Forwards Corrected Copy of Part (E) of 970917 Response to NRC RAI 440.721 on AP600 Notrump Verification & Validation + (08:09:57, 8 December 2024)
- HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 + (08:09:58, 8 December 2024)
- PNO-IV-86-023, on 860708,facility Experienced Reactor Scram Due to MSIV Closure at 65% Power.Isolation Initiated Due to Turbine Bldg High Temp Resulting from Manway Gasket Failure. Personnel Evacuated + (08:09:59, 8 December 2024)
- NSD-NRC-97-5455, Forwards Responses for FSER Open Items 410.308 & 410.310 Re Info in Section 9.3 of Ssar.Rev Associated W/Open Items Will Be Included in SSAR Rev 18 + (08:10:00, 8 December 2024)
- ML20202D751 + (08:10:03, 8 December 2024)
- ML20202D747 + (08:10:04, 8 December 2024)
- ML20202D745 + (08:10:04, 8 December 2024)
- ML20202D743 + (08:10:08, 8 December 2024)
- ML20202D742 + (08:10:08, 8 December 2024)
- ML20202D738 + (08:10:09, 8 December 2024)
- ML20202D733 + (08:10:50, 8 December 2024)
- ML20202D731 + (08:10:51, 8 December 2024)
- ML20202D730 + (08:10:51, 8 December 2024)
- DCL-99-010, Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld + (08:10:52, 8 December 2024)
- ML20202D729 + (08:10:52, 8 December 2024)
- ML20202D725 + (08:10:53, 8 December 2024)
- ML20202D723 + (08:10:54, 8 December 2024)
- ML20202D722 + (08:10:54, 8 December 2024)
- ML20202D721 + (08:10:55, 8 December 2024)
- ML20202D719 + (08:10:55, 8 December 2024)
- ML20202D718 + (08:10:56, 8 December 2024)
- ML20202D715 + (08:10:57, 8 December 2024)
- PNO-V-86-039, on 860708,earthquake w/6.0 Reading on Richter Scale Actuated Seismic Alarms & Recording Instruments. Procedures for Visual Insp of Plant Equipment & Start Test of Diesel Generators Implemented + (08:10:57, 8 December 2024)