Text
_ _ _ _ _ _ _ _ - _ _ _
._
"p s * *n o
uq 4
UNITED STATES
- [^
~h
NUCLEAR REGULATORY COMMISSION
,.
.
-
t
vt w ov
3f; k
[
01 D' A'4 PL AZA DHNE suite 00
%,
f
Anunnico itx As non m
February 12, 1998
William T. Cottle, President and
Chief Executive Officer
STP Nuc!Lar Operating Company
P.O. Box 289
Wadsworth, Texas 77483
SUBJECT: NRC INSPECTION REPORT 50-498/98-02; 50-499/98 02 AND NOTICE OF
VIOLATION
Dear Mr. Cottle:
'
An NRC inspection was conducted Jariuary 1215,1998, at your South Texas Project Electric
Generating Station, Units 1 and 2 reactor facilities. The inspection focused on radiation
protection activities. The enclosed report presents the scope and results of that inspection. On
January 21,1998, your staff provided (via fax) additionalinformation to Mr. Joseph Tapia of our
staff regarding your position pertaining to severalinspection findings. Our assessment of your
i
l
position pertaining to the inspection findings are addressed in Section R1.3 of the Report
Details.
The inspection identified three violations of NRC requirements. These violations are cited in the
enclosed Notice of Violation (Notice) and the circumstances surrounding the violations are
described in detailin the enclosed report. The violations involved failures to: perform a
,
radiological survey; post an airborne radioactivity area; and inform workers of changing
radiological conditions. Collectively, these violations are of concem because they involved the
failure of your staff to follow approved procedures. Additionally, while some of these issues
were identified by your staff, corrective actions were not adequate in all cases. Please note that
you are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part, to
determine whether further enforcement action is necessary to ensure compliance with regulatory
requirements.
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
'
enc!osure(s), and your response will be placed in the NRC Public Document Room (PDR). To
the extent possible, your response should not include any personal privacy, proprietary, or
safeguards information so that it can be placed in the PDR without redaction.
Should you have any questions concerning this inspection, we will be pleased to discuss them-
with you.
Si
rely,
h4
s
Arthur T. HcjAell 11, Direc
/j
Division of Reactor Safety
9902170166 900212
N H
11I n n
is em
ADOCK 05000498
HH
IllH H*HH
G
- *
' **
i-
.
.
.. . . . . . . . .
.
.
.
. . .
. . .
_ . .
. _ _ _ _ _ . _ _ _ _ _
_ . _ _ . _ . ..._ ._.- _ _ _.. _ _ _ _ _ _ _ _ _-
'
.
l
.
STP Nuclear Operating Company -
2
Docket Nos.: 504 98; 50-499
}
_ License Nos.: NPF 76; NPF 80
L
- Enclosures:
2. NRC inspection Report
50-498/98-02; 50-499/96-02
3. Memo dated January 21,1998 from R. V. Logan, Nuclear Licensing
cc w/ enclosures:
Lawrence E. Martin, Vice President
Nuclear Assurance & Licensing
STP Nuclear Operating Company
P.O. Box 289
Wadowe'th, Texas 77483
Mr. J. C._ Lanier/Mr,- A. Ramirez
City of Austin
Electric Utility Department
721 Barton Springs Road
Mr. K. J. Fiedler/Mr. M. T. Hardt
City Public Service Board
P.O. Box 1771
San Antonio, Texas- 78296
C. R. Crisp /R. L. Balcom
Houston Lighting & Power Company
P.O. Box 1700
_
Houston, Texas 77251
-Jon C. Wood
Matthews & Branscomb
One Alamo Center
106 S. St. Mary's Street, Suite 700
San Antonio, Texas 78205-3692
Jack Ri Newman, Esq.
Morgan, Lewis & Bocklus
1800 M. Street, N.W.
Washington, D.C. 20036-5869
.
_
_
.
4
STP Nuclear Ope, sting Company
3
Mr. G. E. Vaughn/Mr. C. A. Johnson
Central Power & Light Company
P.O. Box 289 -
MailCode: N5012
Wadsworth, Texas 77483
Records Center
700 Galleria Parkway
Atlanta, Georgia 30339-5957
Bureau of Radiation Cor. trol
State of Texas
1100 West 49th Street
Mr. Jim Calloway
.
Texas Public Utility Commission
William B. Travis Building -
1701 North Congress Avenue
P.O. Box 13326
John Howard, Director-
Environmental and Natural Resources Policy
Offloe of the Govemor
P.O. Box 12428
Judge, Matagorda County
- Matagorda County Courthouse
- 1700 Seventh Street
- Bay City, Texas 77414
Licensing Representative
- Houston Lighting & Power Company
Suite 610 '
Three Metro Center
'
Bethesda, Maryland 20814
_
_ - -
'
t
e we
=y
- e , w , , w w =e
-+e
<<
-,&-w-
we--++--wo-
+-
+a
+er-
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _
.
.
STP Nuclear Operating Company
-4-
E Mail report to T. Frye (TJF)
E-Mail report to T. Hiltz (TGH)
E-Mail report to NRR Event Tracking System (IPAS)
E Mail report to Document Control Desk (DOCDESK)
bec to DCD (IE08)
bec distrib, by RIV:
Regional Administrator
South Texas Resident inspector
DRS Director
DRS Deputy Director
DRP Director
DRS PSB-
Branch Chief (DRP/A)
MIS System
Project Engineer (DRP/A)
RIV File
Branch Chief (DRP/TSS)
R. Bachmann, OGC (MS: 15 B 18)
DRS Action item (98-G 0017)
R. Wise, AO (2)
DOCUMENT NAME: G:\\ REPORTS \\ST802RP.MPS
To receive copy of skp@ ment. Indicate in box:"C" = copy without enclosures *E" = Copy with enclosures *N" = No coq /
RIV:PSB /MG PSB
E
C:DRP% n
_
E
C:DRS\\PSB - D:DR9(
.
'
MSP.annon:nh
MHayhtV JTapia %/ah {@fise@ BMurray V)
ATIMwell111
02/R98
02/2/98
025/98 l F \\.
62/4/98
02/W98
02/998
-
OFFICIALYtECORD COPY
.
l
L
_
_ _ - _ - _ _ -
.
.
s
STP Nuclear Operating Company-
-4
'
E Mail report to T. Frye (TJF)
E Mail report to T. Hiltz (TGH)
'
E Mail report to NRR Event Tracking System (IPAS)
E Mail report to Document Control Desk (DOCDESK)
bec to DCD (IE08)
bec distrib. by RM
Regional Administrator
South Texas Resident inspector
DRS Director
DRS Deputy Director
DRP Director
DRS PSB
Branch Chief (DRP/A)
MIS System
Project Engineer (DRP/A)
RIV File
Branch Chief (DRP/TSS)
R. Bachmann, OGC (MS: 15-B-18)
DRS Action item (98-G-0017)
R. Wise, AO (2)
{
DOCUMENT NAME: G:\\ REPORTS \\ST802RP.MPS
- To receive copy of d<() ment. Indicate in box:"C" = Copy wRhout enclosures *E" a Copy wth enclosures *N" = No coq /
RIV.PSB flN3 PSB
lEIC:DRP\\A n
_lE C:DRS\\PSB
D:DM@(
,
MShannon:'nh
MHayhrV JTapia %/jah @se@ BMurray V
ATIMwelllli
02/f98
02/f/98~
025/98 I .i'(
62/4/98
02/ % 98
02/998
--
OFFICIAL'ftECORD COPY
IL70n54
l
__U