Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20202F640 + (07:45:39, 8 December 2024)
- ML20202F635 + (07:49:59, 8 December 2024)
- ML20202F634 + (07:50:00, 8 December 2024)
- ML20202F632 + (07:50:01, 8 December 2024)
- ML20202F633 + (07:50:01, 8 December 2024)
- 05000346/LER-1997-014-01, :on 970801,pressurizer PORV Setpoint Was Less than Allowable Value.Caused by Degraded Wire Splice.Wire Containing Faulty Splice Was Replaced + (07:50:03, 8 December 2024)
- ML20202F629 + (07:50:04, 8 December 2024)
- ML20202F626 + (07:50:05, 8 December 2024)
- ML20202F627 + (07:50:05, 8 December 2024)
- ML20202F624 + (07:50:07, 8 December 2024)
- 05000213/LER-1986-024, :on 860609,at 100% Power,Dropped Rod Turbine Load Runback Initiated.Caused by Spurious Signal in Power Range 34.Load Runback Reset Manually & Power Range Channels Will Be Replaced + (07:50:09, 8 December 2024)
- ML20202F619 + (07:50:10, 8 December 2024)
- ML20202F618 + (07:50:11, 8 December 2024)
- ML20202F612 + (07:50:12, 8 December 2024)
- ML20202F614 + (07:50:12, 8 December 2024)
- ML20202F610 + (07:50:13, 8 December 2024)
- ML20202F607 + (07:50:14, 8 December 2024)
- ML20202F608 + (07:50:14, 8 December 2024)
- NLS8600132, Forwards Rev 3 to Second 10-yr Inservice Insp Program & Rev 1 to Inservice Insp Program Schedule Status Table,For Incorporation Into 850315 Submittal + (07:50:18, 8 December 2024)
- IR 05000089/1986001 + (07:50:19, 8 December 2024)
- ML20202F603 + (07:50:20, 8 December 2024)
- ML20202F602 + (07:50:20, 8 December 2024)
- ML20202F601 + (07:50:21, 8 December 2024)
- ML20202F599 + (07:50:22, 8 December 2024)
- IR 05000213/1986016 + (07:50:35, 8 December 2024)
- IR 05000322/1986005 + (07:50:37, 8 December 2024)
- ML20202F588 + (07:50:38, 8 December 2024)
- ML20202F591 + (07:50:38, 8 December 2024)
- ML20202F585 + (07:50:39, 8 December 2024)
- PY-CEI-NRR-0448, Forwards 12 Pages Inadvertently Omitted from Supplemental Info to Seismic Event Evaluation Rept Submitted by + (07:50:40, 8 December 2024)
- ML20202F583 + (07:50:40, 8 December 2024)
- 3F1297-32, Provides NRC Requested Clarification Re Use of HPI Flow Throttling TS Change Request Notice 210.No New Commitments Made in Submittal + (07:50:41, 8 December 2024)
- DCL-86-088, Special Rept SR 86-01:on 860315,all Monitor Channels on Primary Meteorological Tower Incapacitated Due to Lightning. Temp Channels Required Replacement.On 860317,spare Processor Failed.Replacement Expected by 860402 + (07:50:42, 8 December 2024)
- ML20202F581 + (07:50:42, 8 December 2024)
- ML20202F578 + (07:50:43, 8 December 2024)
- ML20202F576 + (07:50:44, 8 December 2024)
- ML20202F575 + (07:50:45, 8 December 2024)
- ML20202F572 + (07:50:46, 8 December 2024)
- ML20202F571 + (07:50:47, 8 December 2024)
- IR 05000412/1986003 + (07:50:49, 8 December 2024)
- ML20202F564 + (07:50:50, 8 December 2024)
- ML20202F559 + (07:50:53, 8 December 2024)
- ML20202F557 + (07:50:54, 8 December 2024)
- ML20202F550 + (07:50:55, 8 December 2024)
- ML20202F549 + (07:50:55, 8 December 2024)
- ML20202F544 + (07:50:57, 8 December 2024)
- ML20202F541 + (07:50:58, 8 December 2024)
- ML20202F539 + (07:50:58, 8 December 2024)
- PNO-I-99-007, on 990129,state of AL Was Notified That Ronan Model SA-15 Gauge Containing 100 Mci Cs-137 Source Was Inadvertently Transferred to Acutus Gladwin Mold Co.Region I Will Have Inspector at Company on 990203 + (07:50:59, 8 December 2024)
- B17019, Suppls 90-day Response to GL 97-04, Assurance of Sufficient NPSH for ECC & Containment Heat Removal Pumps, Providing Updated Analysis for Containment Spray Pumps + (07:51:00, 8 December 2024)
- ML20202F537 + (07:51:00, 8 December 2024)
- ML20202F532 + (07:51:01, 8 December 2024)