- 4 x,.
j
%n,)
Boeton Edieors Pilgrim Nuclear Power Station o
( -* 9 '
Rocky Hill Road Plymouth, Massachusetts 02360-5599 January 28,1999 BECo Ltr. 2.99.007 U.S. Nuclear Regulatory Commission
. Attention: Document Control Desk Washington, DC 20555 t -
Docket No. 50-293 License No. DPR-35 l
BWR Thermal-Hydraulic Instabilities (Generic Letter 94-02)
By letter dated September 9,1994, " Boston Edison Company Response to Generic Letter 94-02,"
Boston Edison committed to install and make operable the Boiling Water Owners Group Enhanced Option 1A thermal-hydraulic stability solution for Pilgrim Nuclear Power Station. This item appears as Pilgrim Long Term Program item #504, and was scheduled for completion by February 1,1999.
This letter informs the NRC that Enhanced Option 1 A hardware has been installed, and all operational requirements have been incorporated into PNPS procedures. Operational turnover occurred January 25,1999. Therefore, BWROG Enhanced Option 1 A is implemented for Pilgrim.
1
- Should you require additional information on Enhanced Option 1 A, please contac,t P.M. Kahler at (508)
'830-7939.
l hk 1
s
. A exan N clear Assessment
(
oup Manager PMK/cis 299007 9902040102990120"$b PDR ADOCK 05000293 % -
P PDR Q
.__. ~. _... _ _.
L A-r-
' cc:. Mr. Alan B. Wang, Project Manager Pro $' Directorate 1-3 Office bf Nuclear Reactor Regulation
~ Mail Stop:- OWFN 14B20 -
U. S. Nuclear Regulatory Commission 1 White Flint North L
11555 Rockville Pike
- Rockville, MD 20852
. U.S. Nuclear Regulatory Commission Region i 475 Allendale Road '
lJ King of Prussia, PA 19406 E
Senior Resident inspector
(.
Pilgrim Nuclear Power Station l
l l.
f y.
l 1
Y i
l'
. w.