Text
7_
i
.
09 APR1986
Docket No. 50-333
l
Power Authority of the State of New York
!
James A. FitzPatrick Nuclear Power Plant
!
ATTN: Mr. Radford J. Converse
Resident Manager
'
P.O. Box 41
Lycoming, New York 13093
Subject:
Inspection 50-333/86-01
This refers to the routine, safety inspection conducted by Mr. A. Luptak of
this office on January 18 to March 10, 1986, at the J.A. FitzPatrick Nuclear
Power Plant, Scriba, New York, of activities authorized by NRC License No.
.
OPR-59 and to the discussions of our findings held by Mr. Luptak with yourself
and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Our inspector also verified the steps you have taken to correct the violation
brought to your attention in the enclosure to our letter cated January 17,
1986. We have no further questions regarding your actions at this time.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This violation has been
categorized by severity level in accordance with the General Statement of
Policy and Procedure for Enforcement Actions (Enforcement Policy),10 CFR 2,
-Appendix C (1985). You are required to respond to this letter and in pre-
paring your response, you should follow the instructions in Appendix A.
Apparently, the cause of the violation was the inadequate implementation and
control of surveillance testing, indicating a lack of supervision and
administrative control of the surveillance test program.
In addition, shift
personnel apparently did not realize that untested equipment is inoperable in
accordance with Technical Specification 4.0.C., indicating a misunderstanding
of the significance of a missed surveillance test.
Please address these
issues in your response to this letter.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
s604140193 860409
ADOCK 05000333
G
OFFICIAL RECORD COPY
IR FITZ 86-01 - 0001.0.0
04/08/86
I h OI
1
I
-
-
-
.- -
r .-
L
,-
09 APR E
Power Authority of the State
2
l
^
of New York
Your cooperation with us in this matter is appreciated.
Sincerely,
W
318aed By t
Samuel J. Collins, Chief
Projects Branch No. 2
Division of Reactor Projects
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection Report No. 50-333/86-01
cc w/encls:
L.W. Sinclair, President and Chief Operating Officer
J.P. Bayne, First Executive Vice President --
Chief Operations Officer
A. Klausmann, Vice President-Quality Assurance and
Reliability
R.L. Patch,-Quality Assurance Superintendent
G.H. Wilverding, Chairman, Safety Review Committee
Gerald C. Goldstein, Assistant General Counsel
NRC Licensing Project Manager
Department of Public Service, State of New York
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New York
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, ORMA (w/o encis)
Section Chief, DRP
RI:kP
k
RL : RP
R B-
Doerflein/rbl
L'invi le
Co
4/7/86
4/ /86
4/h/86
0FFICIAL RECORD COPY
IR FITZ 86-01 - 0002.0.0
04/08/86