Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17345A306 + (16:45:03, 7 January 2025)
- L-88-336, Special Rept:On 880701,one Surveillance Tendon of Horizontal Tendon Group Found to Have Measured lift-off Force Below Predicted value.Lift-off Forces in Tendons 13H49,13H50 & 13H51 Have Been Restored to Predicted Lower Values + (16:45:05, 7 January 2025)
- L-88-335, Special Rept:On 880721,discovered That Ultimate Strength of Vertical Tendom Wire Below Min Specified Value of 240,000 Psi by Approx 1%.Plant Entered Action Statement Requiring Restoration of Containment Vessel to Required Level + (16:45:08, 7 January 2025)
- ML17345A300 + (16:45:10, 7 January 2025)
- L-88-316, Informs That Util in Process of Upgrading Emergency Response Data Acquisition & Display Sys (Erdads).Erdads Computers Used to Collect & Display SPDS & Safety Assessment Sys Info + (16:45:11, 7 January 2025)
- ML17345A298 + (16:45:19, 7 January 2025)
- L-88-321, Responds to Violations Noted in Inps Repts 50-250/88-01 & 50-251/88-01.Corrective Actions:Training Brief Issued to Promulgate Acceptable Method for Averaging Meteorological Data + (16:45:20, 7 January 2025)
- L-88-299, Forwards Summary of mgt-on-shift Repts for 880704-08,per NRC 871019 Order.Change Discussed & Concurred W/By Region II Staff + (16:45:23, 7 January 2025)
- ML17345A295 + (16:45:27, 7 January 2025)
- L-88-306, Discusses Performance Enhancement Program Project 4 Task 11.20 Re Upgraded RHR Valve 887.Design & Procurement of Upgraded Valve Has to Be Revised as Result of Analysis + (16:45:28, 7 January 2025)
- L-88-315, Forwards Integrated Schedule Monthly Summary for Jul 1988, Including New Outage Completion Date for Unit 4 - Cycle 12 + (16:45:30, 7 January 2025)
- ML17345A291 + (16:45:33, 7 January 2025)
- NRC-17-0082, Price-Anderson Act Guarantee of Payment of Deferred Premiums + (16:45:34, 7 January 2025)
- ML17345A289 + (16:45:37, 7 January 2025)
- ML17345A287 + (16:45:38, 7 January 2025)
- ML17345A285 + (16:45:39, 7 January 2025)
- ML17345A284 + (16:45:41, 7 January 2025)
- ML17345A283 + (16:45:42, 7 January 2025)
- 05000250/LER-1988-012, :on 880614,QA Audit Caused Investigation Into Delay in Issuing Fire Protection Impairment Form for Four Penetration Seals in Switchgear Room.Caused by Inadequate Controls.Seal Surveillance Being Generated + (16:45:44, 7 January 2025)
- L-88-295, Forwards Response to First Concern Noted in NRC Bulletin 88-004, Potential Safety-Related Pump Loss Re Potential for dead-heading of Pumps Under Stated Conditions.Schedule for Completion of Second Concern Expected by 881101 + (16:45:45, 7 January 2025)
- L-88-305, Monthly Operating Repts for June 1988 for St Lucie & Turkey Points + (16:45:48, 7 January 2025)
- ML17345A279 + (16:45:51, 7 January 2025)
- L-88-286, Forwards Summary of mgt-on-shift Repts for Wk Starting 880620,per NRC 871019 Order.Plant supervisor-nuclear Shift Repts Also Encl + (16:45:53, 7 January 2025)
- ML17345A276 + (16:45:56, 7 January 2025)
- ML17345A275 + (16:45:58, 7 January 2025)
- ML17345A270 + (16:45:59, 7 January 2025)
- ML17345A268 + (16:46:01, 7 January 2025)
- ML17345A269 + (16:46:01, 7 January 2025)
- ML17345A265 + (16:46:03, 7 January 2025)
- IR 05000250/1988012 + (16:46:05, 7 January 2025)
- ML17345A261 + (16:46:10, 7 January 2025)
- ML17345A260 + (16:46:12, 7 January 2025)
- IR 05000250/1988001 + (16:46:14, 7 January 2025)
- 05000251/LER-1987-015, :on 870715 & 16,failure to Deactivate Inoperable Containment Isolation Valve within 4 H as Required by Tech Specs Discovered.Caused by Personnel Error. Procedures Revised + (16:46:17, 7 January 2025)
- ML17345A255 + (16:46:19, 7 January 2025)
- ML17345A253 + (16:46:21, 7 January 2025)
- L-88-263, Forwards Written Summary of Info Presented to NRC During 880610 Monthly Mgt Meeting Re Performance Enhancement Program Quarterly Update + (16:46:22, 7 January 2025)
- L-88-260, Monthly Operating Repts for May 1988 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2 + (16:46:25, 7 January 2025)
- TAC:67285 + (16:46:27, 7 January 2025)
- ML17345A243 + (16:46:29, 7 January 2025)
- ML17345A241 + (16:46:31, 7 January 2025)
- 05000250/LER-1988-008, :on 880613,flowpath Which Could Result in Insufficient NPSH to Certain Pumps During LOCA Recirculation Identified.Procedures Revised to Maintain Valve 887 Locked in Fully Open Position + (16:46:33, 7 January 2025)
- ML17345A238 + (16:46:36, 7 January 2025)
- L-88-144, Forwards 6-month Rept of Integrated Schedule for Plant. Schedule Reflects Info as of 880520 Issuance Date.Changes to Schedules Reviewed W/Nrc Per Integrated Schedule Plan + (16:46:38, 7 January 2025)
- L-88-251, Special Rept:Fire Protection Sys (FPS) Impairments Incurred During Performance of Plant Mod & FPS Features Fail Due to Component Failure.Caused by Number of Performed Mods & FPS Equipment Malfunction.Compensatory Measures Implemented + (16:46:40, 7 January 2025)
- L-88-221, Provides Util Work Plan & Schedule for Proposed Enhancement of Existing Onsite Power Distribution Sys.Util Will Give Presentation on Emergency Power Sys Enhancement in Near Future + (16:46:43, 7 January 2025)
- 05000250/LER-1988-007, :on 880427,3A Intake Cooling Water (Icw) Pump out-of-svc Due to Discharge Pressure Gauge Piping Failure. Caused by Corrosion of Coupling Attaching Pressure Gauge Piping to Icw Discharge Pipe.Piping Repaired + (16:46:47, 7 January 2025)
- L-88-200, Forwards Summary Rept of Integrated Schedule Generated for Apr 1988,per Integrated Schedule Plan + (16:46:48, 7 January 2025)
- L-88-242, Requests That Remaining Portions of Project 1,Task 5.1, Remove Temporary Facilities, Be Terminated,Per Section IV of NRC 860812 Confirmatory Order.Only 16 of 56 Trailers Occupied & Not Accounted for in Original Scope of Project + (16:46:55, 7 January 2025)
- ML17345A229 + (16:46:58, 7 January 2025)
- ML17345A227 + (16:47:00, 7 January 2025)
- L-88-239, Responds to Generic Ltr 88-05, Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR Plants. Program Implemented to Monitor,Identify,Evaluate & Correct Small Primary Coolant Leaks + (16:47:01, 7 January 2025)