" Cy(
0 k**g4 UNITEDSTATES NUCLEAR R EGULATORY COMMISSION WASHINGTON, D. C. 20555 July 1, 1988 Docket Nos.
50-250 50-251 Florida Power 8 Light Company ATTN: Wr. J.
J.
Hudiburg Chairman of the Board and Chief Executive Officer P.
0 ~
Box 029100 Miami, Florida 33102-9100 Gentlemen:
This letter forwards our evaluation of the independent management appraisal (IMA) of the Florida Power 8 Light Company (FP8 L) Turkey Point Plant that was conducted in response to NRC ader EA 87-85.
The evaluation was conducted by a team of NRC headquarters and regional personnel with team leadership and support provided by the Office for Analysis and Evaluation of Operational Data.
This evaluation included a-week's visit to the offices of your IMA contractor (ENERCON Services, Inc.) in Atlanta, Georgia.
The NRC team's findings, conclusions and recommendations were discussed with you and other company executives in your corporate office on Thursday, June 9, 1988.
The NRC effort involved an assessment of the quality and completeness of the IMA, the adequacy of the IMA root cause assessments and recommendations and formulation of NRC team recommendations.
The NRC team concluded the IMA appraisal was generally performed in a quality and complete manner.
- However, the team found the IMA report, although hard-hitting and focusing at the management level, under-reported the extent and significance of corporate management root cause responsibility and did not document supporting details in the areas addressed.
Nevertheless, we believe that the report, together with additional supporting details from ENERCON, plus NRC s evaluation of the
- report, should provide valuable input for FP&L to understand Turkey Point's significant problems and their root causes.
Of course, it remains for the new FP8 L management team to add their judgement to these findings.
We also believe that the recommendations in the IMA report, together with the NRC recommendations discussed at our meeting and in the enclosed report, provide appropriate principles from which FP8L'an establish an effective action plan.
We agree with you that it is most important that your response be complete and well.thought-out, including additional actions which your deem necessary to bring about lasting improvement.
Therefore, in response to your
- request, we have granted an additional 45 days (to August 15) for you to submit your report.
8807180270 88070i PDR ADOCK 05000250 p
PNU
Flori da Power 8 Light Company In accordance with 10 CFR 2.790(a),
a copy of this letter and the enclosure wi 11 be placed in the NRC Public Document Room.
If you have any questions or desire additional clarifications on our review of the ENERCON evaluation, please contact either Edward L. Jordan or R.
Lee Spessard of AEOD.
Sincerely, Encl osure:
NRC Evaluation Report of the Independent Hanagement Appraisal for the Turkey Point Plant cc w/encl:
R.
E. Talion, President C.
0.
Woody, Executive Vice President W.
F.
- Conway, Group Vice President Org< al ~>gled by J.
Nel son Grace Regional Administrator
Florida Power
& Light Company July 1, 1988 cc w/encl:
Q.
E. Talion, President
- g. 0.
Woody, Executive Vice President tA. F.
- Conway, Group Vice President bcc w/encl:
jordan E. Edison, Project Manager Project Directorate II-2 Division of Reactor Projects, NRR Document Control Desk DRS Technical Assistant State of Florida NRC Resident Inspector C
- 0;
- D
- D NAME
- DAllisofhl~ :HBailey DATE:06/>4/88: 06@~/88
- A 0
~ ~
SRubin
- RLSpessard
- C e temes an 06~//88: 06/Qf/88: OGPP788: 06/p /88 OFFICIAL RECORD COPY