Text
~cczm~TQ,,.P~gg@ @Kg,g+Q,pp~>>
'PPCCESSION
NBR:8808110127
DOC.DATE: 88/07/27
NOTARIZED:
NO
DOCKET
FACZL:50-250 Turkey Point Plant, Unit 3, Florida Power
and Light C
05000250
50-251 Turkey Point Plant, Unit 4, Florida Power
and Light C
05000251
TH.NAME
AUTHOR AFFILIATION
INE,W.E.
Region
2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
CONWAY,W.F.
Florida Power
S Light Co.
SUBJECT:
Forwards
Insp Repts
50-250/88-16
a 50-251/88-16
on 880627-
0701
a notice of violation. Rept details withheld.
DISTRIBUTION CODE:
IE04D
COPIES
RECEIVED:LTR
/
ENCL J
SIZE:
TITLE: Safeguards
Inspection
Rpt/NOV Response
(50 DKT)-Publicly Available
NOTES:
RECIPIENT
ID CODE/NAME
PD2-2
LA
EDISONiG
INTERNAL: AEOD/DOA
NRR/DRIS/SIB 9A
NUDOCS-ABSTRACT
RGN2
FILE
01
COPIES
LTTR ENCL
1
0
1
1
1
0
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
PD2-2
NRR/DRIS/SGB
9D
P
ILRB12
FILE
02
COPIES
LTTR . ENCL
1
1
1
1
1
0
1
1
EXTERNAL: LPDR
1
1
1
1
NRC PDR
(
1
~
1
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
13
ENCL
10
JUL 27 ]gag
Docket Nos. 50-250,
50-251
License
Nos.
Florida Power
and Light Company
ATTN:
Mr. W. F.
Conway
Senior Vice President - Nuclear
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
Gentlemen:
SUBJECT:
(NRC
INSPECTION
REPORT
NOS. 50-250/88-16
AND 50-251/88-16)
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
Ms. 0.
M. Masnyk
on June
27 - July 1,
1988.
The inspection
included
a review
of activities authorized for your
Turkey Point facility.
At the conclusion of
the inspection,
the findings were discussed
with those
members
of your staff
~
~
~
~
identified in the enclosed
inspection report.
Areas
examined
during the inspection
are identified in the report.
Within
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews
with personnel,
and
observation
of
activities in progress.
The inspection
findings indicate that certain activities
appeared
to violate
NRC requirements.
The violations,
references
to pertinent requirements,
and
elements
to
be included in your response
are described
in the enclosed
Notice
of Violation.
In accordance
with 10 CFR 2.790(d)
and
safeguards
activities
and
security measures
are
exempt from public disclosure.
Therefore,
the enclosures
to this letter with the exception of the Notice, of Violation and the report
cover page,
which presents
a nonexempt
summary, will not
be placed in the
NRC
Public Document
Room.
r
The responses
directed
by this letter and its enclosures
are not subject to the
clearance
procedures
of the Office of Management
and Budget as required
by the
Paperwork
Reduction Act of 1980,
Pub.
L. No.96-511.
8808110127
880727
ADQCK 05000250
G
PNU
Florida Power and Light Company
JUL 27 1988
Should you have any questions
concerning this letter, please
contact us.
Sincerely,
Enclosures:
1.
2.
NRC Inspection
Report
(Safeguards
Information)
cc w/encls:
J.
S.
Odom, Vice President
Turkey Point Nuclear Plant
J.
E. Cross,
Plant Manager
Turkey Point Nuclear Plant
L.
W. Bladow, Plant
gA Superintendent
J. Arias, Jr., Regulatory
and Compliance
Supervisor
bcc w/encls:
NRR/DR IS/SB
bcc w/Inspection
Summary:
NRC Resident
Inspector
Document Control
Desk
(RIDS IE04), 016
State of Florida
William E. Cline, Chief
Nuclear Materials Safety
and
Safeguards
Branch
Division of Radiation Safety
and Safeguards
RII
OMa nyk:er
07/g/88
D
O7~/88
rlenjak
O7/<$ 88
SAF=GL~ARDS iNFORiVAT!Oi"
~
4