Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18004B835 + (12:19:30, 7 January 2025)
- ML18004B832 + (12:19:31, 7 January 2025)
- 05000400/LER-1987-028, :on 870502,manual Turbine Trip Initiated During Performance of Power Ascension Test Procedure 9108-S-14. Caused by Tandem Trip of Both Heater Drain Pumps.Evaluation of Feedwater Response to Transients Continues + (12:19:33, 7 January 2025)
- 05000400/LER-1987-027, :on 870426,during Test,Redundant Transmitter Pressurizer Pressure Channels Declared Inoperable.Caused by Two Out of Three Channels Out of Calibr & Reading Low. Channels Recalibr & Test Completed + (12:19:35, 7 January 2025)
- PMNS20180023, Notice of Forthcoming Public Meeting with Korea Hydro and Nuclear Power Co., Ltd., to Discuss Various Topics of the Advanced Power Reactor 1400 (APR1400) Design + (12:19:36, 7 January 2025)
- ML18004B826 + (12:19:37, 7 January 2025)
- ML18004B827 + (12:19:37, 7 January 2025)
- ML18004B824 + (12:19:38, 7 January 2025)
- 05000400/LER-1987-026, :on 870423 & 24,main Feedwater Pump Tripped & Actuated motor-driven Auxiliary Feedwater Pumps.Caused by Trip of Condensate Booster Pump.Main Feedwater Restored & Pumps Secured.Control Logic Under Evaluation + (12:19:39, 7 January 2025)
- IR 05000400/1987015 + (12:19:42, 7 January 2025)
- ML18004B820 + (12:19:44, 7 January 2025)
- ML18004B818 + (12:19:45, 7 January 2025)
- ML18004B816 + (12:19:46, 7 January 2025)
- ML18004B817 + (12:19:46, 7 January 2025)
- ML18004B812 + (12:19:47, 7 January 2025)
- ML18004B811 + (12:19:48, 7 January 2025)
- 05000400/LER-1987-023, :on 870420,alternate Miniflow Valves for Charging Safety Injection Pump Found Isolated.Verification of Correct Valve Lineup Unavailable.Caused by Personnel Error.Procedure OP-107 Being Revised + (12:19:51, 7 January 2025)
- 05000400/LER-1987-025, :on 870422,while Operating at 99% Power,Heater Drain Pump a Tripped from Low Flow Signal.Caused by Failure of Discharge Valve on Pump.Separated Air Connection on Pump Discharge Valve Repaired + (12:19:53, 7 January 2025)
- 05000400/LER-1987-024, :on 870421,heater Drain Pumps a & B Tripped Due to Low Differential Pressure & Automatic Turbine Runback Initiated.Caused by Oscillating Feedwater Heater Levels.Pump Low Level Trip Setpoint Lowered + (12:19:55, 7 January 2025)
- ML18004B806 + (12:19:57, 7 January 2025)
- ML18004B805 + (12:19:58, 7 January 2025)
- ML18004B803 + (12:20:00, 7 January 2025)
- ML18004B800 + (12:20:01, 7 January 2025)
- ML18004B798 + (12:20:05, 7 January 2025)
- ML18004B797 + (12:20:06, 7 January 2025)
- ML18004B796 + (12:20:07, 7 January 2025)
- ML18004B795 + (12:20:08, 7 January 2025)
- ML18004B794 + (12:20:09, 7 January 2025)
- ML18004B793 + (12:20:11, 7 January 2025)
- ML18004B792 + (12:20:12, 7 January 2025)
- ML18004B790 + (12:20:13, 7 January 2025)
- ML18004B789 + (12:20:14, 7 January 2025)
- IR 05000400/1987013 + (12:20:20, 7 January 2025)
- ML18004B786 + (12:20:22, 7 January 2025)
- ML18004B785 + (12:20:22, 7 January 2025)
- ML18004B784 + (12:20:23, 7 January 2025)
- IR 05000400/1987010 + (12:20:26, 7 January 2025)
- ML18004B781 + (12:20:28, 7 January 2025)
- 05000400/LER-1987-015, :on 870325,noble Gas Grab Sample Not Taken. Caused by Personnel Error.Grab Sample Taken on 870326.Event Reviewed W/Staff & Personnel Counseled + (12:20:30, 7 January 2025)
- 05000400/LER-1987-017, :on 870331,reactor Trip Occurred Due to Steam Flow/Feedwater Flow Mismatch.Caused by Feedwater Control Valve Oscillation.Main Feedwater Regulating Valves Placed in Manual Control + (12:20:32, 7 January 2025)
- ML18004B777 + (12:20:33, 7 January 2025)
- ML18004B776 + (12:20:34, 7 January 2025)
- ML18004B773 + (12:20:35, 7 January 2025)
- ML18004B774 + (12:20:35, 7 January 2025)
- 05000400/LER-1987-016, :on 870323 & 26,turbine Bldg Vent Stack Monitor Declared Inoperable Due to Problems W/Water in Monitor.On 870327,monitor Declared Operable & Lined Up to Sample Stack. Turbine Bldg Vent Stack Reinstated + (12:20:37, 7 January 2025)
- ML18004B771 + (12:20:38, 7 January 2025)
- 05000400/LER-1987-013, :on 870313,plant Manually Tripped at 49% Power Due to Loss of Main Feedwater.Caused by High Discharge Pressure Spike of Condensate Booster Pumps.Feedwater Regulating Valves Stroked + (12:20:39, 7 January 2025)
- ML18004B769 + (12:20:40, 7 January 2025)
- ML18004B767 + (12:20:41, 7 January 2025)
- ML18004B766 + (12:20:45, 7 January 2025)
- 05000400/LER-1987-014, :on 870314,three Pressure Gauges Installed, Placed in Svc & Opened on Three Drain Lines Whose Isolation Valves Considered Containment Isolation Valves in Violation of Tech Specs.Caused by Personnel Error + (12:20:46, 7 January 2025)