Text
REGULATORY INFGRNAT ON DISTRIBUTION SYSTEN (RIDS)
ACCESSlQN
NBR: 8704280490
DQC. DATE: 87/04/07
NOTARIZED:
NP
FACIL:50-400 Shearon
Harris Nuclear
Pouer
Plant'>
Unit i> Carolina
UTH. MANE
AUTHOR AFFILIATIO>N
RELL?> D. N.
Region
2>
OPf'-ice oi Director
ECIP. NANE
RECIPIENT AFFILIATION
UTLEY> E. ~
Carolina
Power
8c Light Co.
DOChET
05000400
05000400
SUBJECT:
Forwards
Insp Rept 50-400/87-10
on 870220-0320.
No
vioations or deviations
noted."
DISTRIBUTION CODE:
IEDID
COPIES
RECEIVED: LTR l ENCL l --SIZE' ~++
TITLE: General
(50 Dl t)-Insp Rept/Notice
oF Violation Response
NOTES: Application fop permit reneal filed.
REC IP IENT
ID CODE/NANE
PD2-1
LA
BUCKLEY> B
CQP IES
LTTR ENCL
0
i
1
RECIP IENT
ID CODE/MANE
PD2-1
COPIES
LTTR ENCL
INTERNAL:
AC>RS
DEDRO
NRR ROE,N.L
NRR/DREP/EPB
NRR/DRIS DIR
QGC/HDSi
RES SPEIS> T
NAL:
LPDR
2
2
i
1
i
1
1
i
1
1
1
1
ENI" LIEBERNAN
NRR/DOEA DIR
NRR/DREP/RPB
N
NA
LRB
G FILE
RC;
LE
NRC
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
TOTAL NUNBFR OF COPIES
REQUIRED:
LTTR
22
ENCL
2i
Docket No. 50-400
License
No.
CarolingrPower
and Light Company
ATTN:ymir. E.
E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P.
O.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
INSPECTION
REPORT
NO. 50-400/87-10
This refers to the Nuclear Regulatory
Commission
(hlRC) inspection
conducted
by
G.
F. Maxwell
on
February
20
March 20,
1987.
The
inspection
included
a
review of activities authorized for your Harris facility.
At the conclusion of
the inspection,
the findings were discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined
during
the
inspection
are
identified in the report.
Within
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
Mithin the
scope
of
the
inspection,
no violations
or deviations
were
identified.
In accordance
with Section
2 '.90 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning. this letter,
please
contact
us.
Sincerely,
87042804'PO
870407
ADOCK 05000400
6
~OMAt stGNED Ay
~AVID y. yE~pU
David M. Verrelli, Chief
Reactor Projects
Branch
1
Division of Reactor Projects
Enclosure:
(See
page 2)
Carolina
Power
and Light Company
Enclosure:
NRC Inspection
Report
'
c w/encl:
R. A. Watson,
Vice President
Harris Nuclear Project
. L. Tibbitts, Director of Regulatory
Compliance
J.
L. Willis, Plant General
Manager
cc w/encl:
. Barth,
J.
Moore,
NRC Resident
Inspector
Document Control
Desk
State of North Carolina
R,II
~SMellen:cc
/6 /87
R~
PFredrickson
'/+87