ML18004B781

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/87-10 on 870220-0320.No Violations or Deviations Noted
ML18004B781
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/07/1987
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18004B782 List:
References
NUDOCS 8704280490
Download: ML18004B781 (5)


See also: IR 05000400/1987010

Text

REGULATORY INFGRNAT ON DISTRIBUTION SYSTEN (RIDS)

ACCESSlQN

NBR: 8704280490

DQC. DATE: 87/04/07

NOTARIZED:

NP

FACIL:50-400 Shearon

Harris Nuclear

Pouer

Plant'>

Unit i> Carolina

UTH. MANE

AUTHOR AFFILIATIO>N

RELL?> D. N.

Region

2>

OPf'-ice oi Director

ECIP. NANE

RECIPIENT AFFILIATION

UTLEY> E. ~

Carolina

Power

8c Light Co.

DOChET

05000400

05000400

SUBJECT:

Forwards

Insp Rept 50-400/87-10

on 870220-0320.

No

vioations or deviations

noted."

DISTRIBUTION CODE:

IEDID

COPIES

RECEIVED: LTR l ENCL l --SIZE' ~++

TITLE: General

(50 Dl t)-Insp Rept/Notice

oF Violation Response

NOTES: Application fop permit reneal filed.

REC IP IENT

ID CODE/NANE

PD2-1

LA

BUCKLEY> B

CQP IES

LTTR ENCL

0

i

1

RECIP IENT

ID CODE/MANE

PD2-1

PD

COPIES

LTTR ENCL

INTERNAL:

AC>RS

DEDRO

NRR ROE,N.L

NRR/DREP/EPB

NRR/DRIS DIR

QGC/HDSi

RES SPEIS> T

NAL:

LPDR

NSIC

2

2

i

1

i

1

1

i

1

1

1

1

AEOD

ENI" LIEBERNAN

NRR/DOEA DIR

NRR/DREP/RPB

N

NA

LRB

G FILE

RC;

LE

NRC

PDR

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

TOTAL NUNBFR OF COPIES

REQUIRED:

LTTR

22

ENCL

2i

Docket No. 50-400

License

No.

NPF-53

CarolingrPower

and Light Company

ATTN:ymir. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P.

O.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

INSPECTION

REPORT

NO. 50-400/87-10

This refers to the Nuclear Regulatory

Commission

(hlRC) inspection

conducted

by

G.

F. Maxwell

on

February

20

March 20,

1987.

The

inspection

included

a

review of activities authorized for your Harris facility.

At the conclusion of

the inspection,

the findings were discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during

the

inspection

are

identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Mithin the

scope

of

the

inspection,

no violations

or deviations

were

identified.

In accordance

with Section

2 '.90 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning. this letter,

please

contact

us.

Sincerely,

87042804'PO

870407

PDR

ADOCK 05000400

6

PDR

~OMAt stGNED Ay

~AVID y. yE~pU

David M. Verrelli, Chief

Reactor Projects

Branch

1

Division of Reactor Projects

Enclosure:

(See

page 2)

Carolina

Power

and Light Company

Enclosure:

NRC Inspection

Report

'

c w/encl:

R. A. Watson,

Vice President

Harris Nuclear Project

. L. Tibbitts, Director of Regulatory

Compliance

J.

L. Willis, Plant General

Manager

cc w/encl:

. Barth,

OGC

J.

Moore,

OGC

NRC Resident

Inspector

Document Control

Desk

State of North Carolina

R,II

~SMellen:cc

/6 /87

R~

PFredrickson

'/+87