ML18004B820
| ML18004B820 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 05/19/1987 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML18004B821 | List: |
| References | |
| NUDOCS 8706010395 | |
| Download: ML18004B820 (3) | |
See also: IR 05000400/1987015
Text
ACCESSION
NBR
FAC IL:'50-400
UTH. NAl"iE
RRELLI, D. N
RECIP. NANE
UTLEYiL'. t:.
REGULATORY INFOR) lATION
D ISTR IBUTI ON SYSTEN
( R IDS >
8706010395
DQC. DATE'7/05/19
NOTARIZED:
NO
Sheav on Harv is
Nuc lear
Po: Ier Pl anti
Unit
1i
Car olina
AUlHOR
AF F I LIAT ION
Reqi on
2> Office of Direc tov
REC IP I 8)~IT AFFILIATIONS(
Cav olina Po)I)er h Light Co.
DOCKET ¹
0 5000400
SUB JECT:
Fov )I)ar d s Insp Rept 50-400/87-15
on 870320-0420.
No v iolati ons
ov'eviations
noted.
DISTRIBUTION CODE:
IEOID
COPIEB RECEiVED: LTR g
ENCL JSIZE:
TITLE: ('eneral
(50 Dkt)-Insp Rept/No) ice of Violation Response
NOTES: Application
Fov permit
v ene)Nal filed.
05000400
RECIPIENT
ID CODE/NAi'lE
PD2-1
LA
BUCKLEY> B
CQP IES
LTTR ENCL
1
0
ri
2
RECIPIENT
I D CODE/NAh:"
PD2-1
COP IES
LTTR ENCL
i
INTERNAL: ACRS
DEDRO
RQE>>xf
NRR/DREP /EPB
NRR/DRIS DIR
0(:C/HDS1
DEPY
(:"I
RNAL:
LPDR
NSI C
2
2'
J
EN:-'
IEBERNAll
NRR/DOEA
DIR
NRR/DREP/RPB
A
ILRB
F LE
's
C
03
NRC
1
1
1
I
1
1
TOTAL NUj'ABER OF COPIES
REQUIRED:
LT1R
23
ENCL
22
Docket No. 50-400
Lic 'nse
No. CPPR-158
arolina
Power
and Light Company
ATTN:
Mr. E.
E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P.. 0.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
NRC.INSPECTION
REPORT
NO. 50-400/87-15
This refers
to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
G.
F. Maxwell on March
20 - April 20,
1987.
The inspection
included
a review
of activities authorized for your Harris facility.
At the conclusion of the
inspection,
the findings
were
discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined
during the inspection
are identified in the report.. Within
'these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
Within the
scope
of the
inspection,
no violations
or deviations
were
identified.
In accordance
with Section
2.7.90 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code
of
Federal
Regulations,
a
copy of this letter
and its
enclosure will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this letter, please
contact us.
Sincerely,
(Original signed by P. Fredrickson for)
8706010395
870519
ADOCK 05000400
9
Enclosure:
N
C Inspection
Report
c w/encl:
. A. Watson,
Vice President
Harris Nuclear Project
D. L. Tibbitts, Director of Regulatory
Compliance
J . L. Willis, Plant General
Manager
bcc w/encl:
(See
page
2)
David M. Verrelli, Chief
Reactor Projects
Branch
1
Division of Reactor Projects
]
I
~cot
MA~ >9 AS>
Carolina
Power
and Light Company
bcc w/encl:
. Barth,
RC Resident
Inspector
Document Control
Desk
State of North Carolina
RI I
SJVias:cc
5/IS /87
RII
PFredrickson
5/
/87