ML18004B820

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/87-15 on 870320-0420.No Violations or Deviations Noted
ML18004B820
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/19/1987
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18004B821 List:
References
NUDOCS 8706010395
Download: ML18004B820 (3)


See also: IR 05000400/1987015

Text

ACCESSION

NBR

FAC IL:'50-400

UTH. NAl"iE

RRELLI, D. N

RECIP. NANE

UTLEYiL'. t:.

REGULATORY INFOR) lATION

D ISTR IBUTI ON SYSTEN

( R IDS >

8706010395

DQC. DATE'7/05/19

NOTARIZED:

NO

Sheav on Harv is

Nuc lear

Po: Ier Pl anti

Unit

1i

Car olina

AUlHOR

AF F I LIAT ION

Reqi on

2> Office of Direc tov

REC IP I 8)~IT AFFILIATIONS(

Cav olina Po)I)er h Light Co.

DOCKET ¹

0 5000400

SUB JECT:

Fov )I)ar d s Insp Rept 50-400/87-15

on 870320-0420.

No v iolati ons

ov'eviations

noted.

DISTRIBUTION CODE:

IEOID

COPIEB RECEiVED: LTR g

ENCL JSIZE:

TITLE: ('eneral

(50 Dkt)-Insp Rept/No) ice of Violation Response

NOTES: Application

Fov permit

v ene)Nal filed.

05000400

RECIPIENT

ID CODE/NAi'lE

PD2-1

LA

BUCKLEY> B

CQP IES

LTTR ENCL

1

0

ri

2

RECIPIENT

I D CODE/NAh:"

PD2-1

PD

COP IES

LTTR ENCL

i

INTERNAL: ACRS

DEDRO

NRR

RQE>>xf

NRR/DREP /EPB

NRR/DRIS DIR

0(:C/HDS1

RES

DEPY

(:"I

RNAL:

LPDR

NSI C

2

2'

J

AEOD

EN:-'

IEBERNAll

NRR/DOEA

DIR

NRR/DREP/RPB

A

ILRB

REC

F LE

's

C

03

NRC

PDR

1

1

1

I

1

1

TOTAL NUj'ABER OF COPIES

REQUIRED:

LT1R

23

ENCL

22

Docket No. 50-400

Lic 'nse

No. CPPR-158

arolina

Power

and Light Company

ATTN:

Mr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P.. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC.INSPECTION

REPORT

NO. 50-400/87-15

This refers

to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

G.

F. Maxwell on March

20 - April 20,

1987.

The inspection

included

a review

of activities authorized for your Harris facility.

At the conclusion of the

inspection,

the findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.. Within

'these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Within the

scope

of the

inspection,

no violations

or deviations

were

identified.

In accordance

with Section

2.7.90 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code

of

Federal

Regulations,

a

copy of this letter

and its

enclosure will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter, please

contact us.

Sincerely,

(Original signed by P. Fredrickson for)

8706010395

870519

PDR

ADOCK 05000400

9

PDR

Enclosure:

N

C Inspection

Report

c w/encl:

. A. Watson,

Vice President

Harris Nuclear Project

D. L. Tibbitts, Director of Regulatory

Compliance

J . L. Willis, Plant General

Manager

bcc w/encl:

(See

page

2)

David M. Verrelli, Chief

Reactor Projects

Branch

1

Division of Reactor Projects

]

I

~cot

MA~ >9 AS>

Carolina

Power

and Light Company

bcc w/encl:

. Barth,

OGC

RC Resident

Inspector

Document Control

Desk

State of North Carolina

RI I

SJVias:cc

5/IS /87

RII

PFredrickson

5/

/87