Forwards Proposed Rev to Plant QA Program for NRC Approval. Proposal Deals W/Review of Inspector Qualification for Inspectors Not Part of Util QA organization.Marked-up FSAR Page Reflecting Proposed Change Also Encl
ML18004B817
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/26/1987
From: Cutter A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NLS-87-112, NUDOCS 8706010170
Download: ML18004B817 (4)


Text

'I REGULATOR-.

NFORNATION DISTRIBUTION a EN (R IDS)

ACCESSION NBR: 8706010170 DOC. DATE: 87/05/26 NOTARIZED:

NO FACIL:50-400 Bhearon Harris Nuclear Pover Plant>

Unit 1> Carolina AUTH. NANE AUTHOR AFFILIATION CUTTER> A. B.

Caro lina Power 8c Lig h t Co.

REC IP. NANE RECIPIENT AFFILIATION Document Control Branch

<Document Control Desk')

SUB JECT:

Fortoards proposed T ev to plant GA program for NRC approval.

Proposal deals v/revi eul of inspec tor qual ificati on for inspectors not paT t of util GA organization. Nal Red-up FS,;R page reflecting encl proposed change also encl.

DISTRIBUTION CODE:

IE43D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: 50. 54. a. 3

<<8

50. 55. f. 3 Change to SAR GA Program NOTES: Application for permit renewal filed.

DOCKET 05000400 05000400 RECIPIENT ID CODE/NANE PDr~-1 LA INTERNAL: ACRB NRR/DLPG/GAB RGN2 FILE 01 EXTERNAL: DNB/DBB NRC PDR COPIES LTTR ENCL 0

10 0

1 1

1 1

1 1

1 RECIPIENT ID CODE/N*N; BUCKLEY> B

/LFNB PEG FIL Or~

LPDR COPIES LTTR ENCL 1

1 0

1 1

1 1

TOTAL NVNBER OF COPIES REQUIRED:

LTTR 19 ENCL 7

A. B. CUTTER Vice President Nuclear Engineering 8 Licensing Carolina Power 4 Ught Company P. O. Box 1551

~ Raleigh, N. C. 27602 (91 9) 636.6231 SAY g 6 587 SERIAL: NLS-87-112 IOCFR50.50 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-000/LICENSE NO. NPF-63 OPERATIONS QA PROGRAM CHANGE Gentlemen:

Carolina Power R Light Company (CPRL) hereby submits for NRC approval a proposed revision to the SHNPP QA Program.

This change would result in a reduction of the program commitments and, therefore, requires NRC approval, pursuant to IOCFR50.50(a)(3), prior to implementation of the change.

The proposal deals with the review of inspector qualifications for those inspectors who are not part of CPRL's QA organization.

The proposed change is described in the attachment to this letter.

Also attached is a marked-up FSAR page reflecting the proposed change.

This QA Program change will not be implemented until after NRC acceptance'of the change pursuant to IOCFR50.5'(a)(3)(iv).

This program revision, if accepted, will be incorporated into the FSAR.

If you have any questions, please contact Mr. Steven Chaplin of our Nuclear Licensing Staff at (919) 836-6623.

Yours very uly,(

A. B. Cutter ABC/SDC/lah (5206SDC)

Enclosures cc:

Mr. B. C. Buckley (NRC)

Dr. 3. Nelson Grace (NRC-RII)

Mr. G. F. Maxwell (NRC-SHNPP)

DR ill,DOC)

87Pgprr, 8>pre pS pg pp 8

pgpppgpp PDR

~Chan e:

The SHNPP QA Program allows for use of inspectors who are not members of CPRL's QA organization.

When non-QA personnel perform inspections, the program requires that the inspection procedures as well as the inspector's qualifications, proficiency tests, and independence are reviewed by the QA organization prior to initiation of the activity.

This change would alter the requirements regarding review of inspector qualification in that it would require a review of the personnel qualification criteria rather than a review of each inspector's qualifications and proficiency tests.

Reason for the Chan e:

This change would bring the SHNPP QA Program requirements in line with the requirements in place for CPRL's other nuclear plants; i.e., the QA Program requirements are verified prior to the activity and the ongoing implementation is monitored through QA surveillance.

Basis for Concludin that Revised Pro ram Incor oratin the Chan e Continues to Satisf 10CFR50 A endix B and the FSAR ualit Pro ram:

Although this change would reduce a program commitment, the revised program still provides adequate assurance that inspections willbe performed by qualified individuals.

Since this change does not affect any other program commitments, the SHNPP QA Program continues to meet applicable 10CFR50 Appendix B criteria.

(5206SDC/mss)

SHNi>P FSAR 17.2.l0 INSPECTION The SHNPP QA Program, as controlled by the Corporate QA Program, establishes requirements for an inspection program to verify conformance of activities affecting quality with requirements specified for those activities.

Inspections are performed by personnel who are independent of the individuals performing or directly supervising the activity being inspected.

The inspection personnel are qualified in accordance with applicable codes and standards, and their qualifications and certiflcatiors are maintained current.

If individuals performing inspections are not part of the Q

and independence are reviewed by the QA organization prior n

iation of the activity.

Inspections at SHNPP are performed in accordance with written procedures, instructions, and/or checklists, which provide for the following:

a)

Identification of individuals or groups responsible for performing the inspections.

b)

Identification of characteristics and activities to be inspected.

c)

Acceptance and rejection criteria.

d)

Method of inspection.

e)

Recording the results of the inspection review of the results, and identification of the inspector.

f)

Indirect control by monitoring of processing

methods, equipment, and personnel when direct inspection is not possible.

g)

Use of necessary drawings/specifications.

h)

Specifying special measuring and test equipment.

Procedures will be established to assure the correct identification of mandatory inspection holdpoints where required beyond which work may not proceed until inspected.

Modifications, repairs, and replacements are" inspected in accordance with the original design and inspection requirements or acceptable alternatives.

Inspections are determined based on involvement of technical and QA/QC personnel aided by criteria established in approved procedures and SAR commitments.

17.2.10-1 Amendment No.