Forwards Insp Rept 50-400/87-14 on 870330-0403 & Notice of Violation.Potential Violations Re Training Considered Unresolved Item Requiring Attention
ML18004B798
Person / Time
Site: Harris 
Issue date: 04/27/1987
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML18004B799 List:
References
NUDOCS 8705040213
Download: ML18004B798 (4)


See also: IR 05000400/1987014

Text

ACCESSION

NOR

FAC IL: 50-400

AUTH. MANE

YES'. A

EcrP. ffA!!E

'fLEY> E.

f-.

REGULATORY INFOR!'!ATION'-'ISTRI!3UTI ON BY&TEl'l (R IDB)

8705040213

DQC. DATE" B7/0 I/27

NQTARIZH>:

NQ

Sh canon Harris

f'fuc lear

Po e" Plant.

Unit

1 ~

Car o line

AUTHOR

AFF. ILIATI CN

Regi on 2i Office of Director

REC IP IEN'f'FFILIATIQN

Carolina

Power

b Ligh I. Co.

DOCK=T

05000400

SUI3 JECT:

Forward

In

p Rept 50-400/87-14

on 870330-0403

8; no tice

of

violation. Potential violations re training considered

unresolved

item requiring attention.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED: LTR

I ERCLj

SIZE:

TITLE: ("eneral

(50 Dkt)-Insp Rept/Notice

of Violaticn Response

NOTES: Application

For peTmit renewal filed.

05000400

RECIPIENT

ID

C Q DE/Nhl'1E

PD2-1

! A

BUCKLEY'S 8

INTERNAL: ACRB

DEDRO

NRR

RQE> f'l. L

NRR/DREP/EPD

NRR/DR IB Dr f<

(tQC/HDB1

BPF I'~I 1

REB

.RNAL:

LPDR

NBIC

COPIES

LfTR ENICL

i

0

l

1

~ I

RECIPIENT

ID CODE/N*."iE

FD2-1

PD

AEQD

ENI'

IEDER!'!*N

NRR/DOEA

DIR

f!vR/DREP/RPB

f!RT

'

I

F ILE

!!RC

PDR

coerce

LTTR E<'CL

1

1

1

1

1

1

p

1

1

1

1

1

1

e

TOTAL NU!'tBER QF

CQP IES REQUIRED:

LT I R

22

ENCL

~'f

Ci'

Docket No. 50-400

License

No.

NPF-53

~

~

~

C rolina Power and Light Company

TTN:

Mr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC

INSPECTION

REPORT

NO. 50-400/87-14)

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

R.

E. Weddington

on March 30-April 3,

1987.

The inspection

included

a review

of activities authorized for your Shearon

Harris facility.

At the conclusion

c. the inspection,

the findings were discussed

with those

members of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of Procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

The inspection

findings indicate that certain activities appeared

to violate

NRC requirements.

The violation, references

to pertinent

requirements,

and

elements

to be included in your response

are described

in the enclosed

Notice

of Violation.

A potential

violation of

NRC requirement

was

also identified during

the

inspection.

However, since this potential violation is related to training, it

is not cited herein

as

a violation, but is considered

to be an unresolved

item

in

accordance

with

the

Commission

Policy

Statement

on

Training

and

gualification of Nuclear

Power Plant

Personnel

(50 FR 11147

dated

March 30,

1985).

No response

to the unresolved

item is required;

however, your attention

is

necessary

because

the unresolved

item

has

the potential for becoming

a

violation in the future.

In accordance

with Section 2.790 of the

NRC's

"Rules of Practice',"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosures

will be placed in the

NRC Public Document

Room.

The responses

directed

by this letter and its enclosures

are not subject to the

clearance

procedures

of the Office of Management

and Budget as required

by the

Paperwork

Reduction Act of 1980,

PL 96-511.

evo4>>

870ggg0213

g5000ggQ

PDR

ADOGK

PDR

6

Carolina

Power and Light Company

Should you have any questions

concerning this letter,

please

contact us.

Sincerely,

Enclosures:

1.

Notice of Violation

2.

Inspection

Report

~

~

~

c w/encls:

~

R. A. Watson,

Vice President

Harris Nuclear Project

~. L. Tibbitts, Director of Regulatory

Compliance

~.

L. Willis, Plant General

Manager

cc w/encls:

C. Barth,

OGC

. Moore,

OGC

NRC Resident

Inspector

Document Control

Desk

State of North Carolina

Luis A. Reyes,

Director

Division of Reactor Projects

RI I

RII

RII

RII

A>

CIVIC-

4i7/m ~Ax W

RMeddington

CHosey

DCollir/5'PStohr

4/9/87

4/g /87

4/ l/87

4//o/87

RII

-

RII

Fre roc son

DVerrelli GJenk

ns

.4/ lg/87

4/ loy 87

4//+97