Forwards Insp Rept 50-400/87-13 on 870323-27.No Violations or Deviations Noted
ML18004B786
Person / Time
Site: Harris 
Issue date: 04/14/1987
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18004B787 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8704290037
Download: ML18004B786 (5)


See also: IR 05000400/1987013

Text

REGULATORY -INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION

NOR: 8704290037

DOC. DATE: 87/04/14

NOTARIZED:

NO

FACIL: 50-400 Shearon

Harv is Nucleav

Power Planti

Unit li Carolina

AUTH. NAME

AUTHOR AFFILIATION

ERRELLIi D. M.

Reg ion 2i

Office,of Director

RECIP. NAME

RECIPIENT AFFILIATION

UTLEYe E. E.

Cav olina

Powev

5 Light Co.

SUBJECT:

Fov war d s lns p

Rep t 50-400/87-13

on 870323-27.

No violati ons

ov deviations

noted.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED: LTR

ENCL

SIZE:

TITLE: General

<50 Dkt)-Insp Rept/Notice

of Violation Response

NOTES: Application for pevmit renewal filed.

DOCKET

05000400

05000400

RECIPIENT

ID CQDE/NAME

PD2-1

LA

BUCKLEY'S B

COPIES

LTTR ENCL

1

0

1'

RECIPIENT

ID CODE/NAME

PD2-1

PD

COPIES

LTTR ENCL

'1

1

INTERNAL:

ACRS

DEDRO

NRR ROE'. L

NRR/DREP/EPB

NRR/DR IS DIR

OGC/HDS1

RES SPEISi T

2

2

1

1

1

1

1

1

1

1

~

1

1

1

1

LE

01

AEOD

ENF LIEBERM*N

NRR/DOEA DIR

NRR/DREP/RPB

NRR

MAS/ILRB

F

RG

1

1

1

1

1

1

1

1

1

1

1

1

ERNAL:

LPDR

NSIC

NRC

PDR

TQTAL NUMBER OF CQPIES

REQUIRED:

LTTR

22

ENCL

21

gpss i 4 1987

Docket No. 50-400

License

No.

NPF-53

Carolina

Power and Light Company

~TN:

Mr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P.

0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT

NO. 50-400/87-13

This refers to the Nuclear Regulatory Comission

(NRC) inspection

conducted

by

P.

G. Stoddart'n

March 23-27,

1987.

The inspection

included

a review of

activities authorized

for your Harris facility.

At the conclusion of the

inspection,

the findings

were

discussed

with those

members

of your staff

identified in the en'closed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of

activities in progress.

Within the

scope

of

the

inspection,

no violations

or deviations

were

identified.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have any questions

concerning this letter, please

contact

us.

Sincerely,

ORIGINAL SI( Neg

BY

DAY(D A< PERotI I t

David M. Verrelli, Chief

.

Reactor Projects

Branch

1

Division of Reactor Projects

Enclosure:

Inspection

Report

8704290037

870414

PDR

ADOCK 05000400

8

Carolina

Power and Light Company

cy. w/encl:

M. A. Watson,

Vice President

~

~

Harris Nuclear Project

. L. Tibbitts, Director of Regulatory

ompliance

. L. Willis, Plant General

Manager

b

w/encl:

. Barth,

OGC

Moore,

OGC

RC Resident

Inspector

RII

RI

~

I

PStoddart

Kah e

D o lins.

redr c son

4/io /87

4//~/87

4//g/87

4 0/87