ML18004B786
| ML18004B786 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 04/14/1987 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML18004B787 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8704290037 | |
| Download: ML18004B786 (5) | |
See also: IR 05000400/1987013
Text
REGULATORY -INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION
NOR: 8704290037
DOC. DATE: 87/04/14
NOTARIZED:
NO
FACIL: 50-400 Shearon
Harv is Nucleav
Power Planti
Unit li Carolina
AUTH. NAME
AUTHOR AFFILIATION
ERRELLIi D. M.
Reg ion 2i
Office,of Director
RECIP. NAME
RECIPIENT AFFILIATION
UTLEYe E. E.
Cav olina
Powev
5 Light Co.
SUBJECT:
Fov war d s lns p
Rep t 50-400/87-13
on 870323-27.
No violati ons
ov deviations
noted.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED: LTR
ENCL
SIZE:
TITLE: General
<50 Dkt)-Insp Rept/Notice
of Violation Response
NOTES: Application for pevmit renewal filed.
DOCKET
05000400
05000400
RECIPIENT
ID CQDE/NAME
PD2-1
LA
BUCKLEY'S B
COPIES
LTTR ENCL
1
0
1'
RECIPIENT
ID CODE/NAME
PD2-1
COPIES
LTTR ENCL
'1
1
INTERNAL:
DEDRO
NRR ROE'. L
NRR/DREP/EPB
NRR/DR IS DIR
OGC/HDS1
RES SPEISi T
2
2
1
1
1
1
1
1
1
1
~
1
1
1
1
LE
01
ENF LIEBERM*N
NRR/DOEA DIR
NRR/DREP/RPB
MAS/ILRB
F
1
1
1
1
1
1
1
1
1
1
1
1
ERNAL:
LPDR
NRC
TQTAL NUMBER OF CQPIES
REQUIRED:
LTTR
22
ENCL
21
gpss i 4 1987
Docket No. 50-400
License
No.
Carolina
Power and Light Company
~TN:
Mr. E.
E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P.
0.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT
NO. 50-400/87-13
This refers to the Nuclear Regulatory Comission
(NRC) inspection
conducted
by
P.
G. Stoddart'n
March 23-27,
1987.
The inspection
included
a review of
activities authorized
for your Harris facility.
At the conclusion of the
inspection,
the findings
were
discussed
with those
members
of your staff
identified in the en'closed
inspection report.
Areas
examined
during the inspection
are identified in the report.
Within
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation
of
activities in progress.
Within the
scope
of
the
inspection,
no violations
or deviations
were
identified.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
will be placed in the
NRC Public Document
Room.
Should you have any questions
concerning this letter, please
contact
us.
Sincerely,
ORIGINAL SI( Neg
BY
DAY(D A< PERotI I t
David M. Verrelli, Chief
.
Reactor Projects
Branch
1
Division of Reactor Projects
Enclosure:
Inspection
Report
8704290037
870414
ADOCK 05000400
8
Carolina
Power and Light Company
cy. w/encl:
M. A. Watson,
Vice President
~
~
Harris Nuclear Project
. L. Tibbitts, Director of Regulatory
ompliance
. L. Willis, Plant General
Manager
b
w/encl:
. Barth,
Moore,
RC Resident
Inspector
RII
RI
~
I
PStoddart
Kah e
D o lins.
redr c son
4/io /87
4//~/87
4//g/87
4 0/87