Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000400/LER-1993-008-01, :on 930525,TS Violation Occurred Due to Improper Wiring in Containment Penetration Current Limiting Breaker.C/As:Breaker Satisfactorily Tested Per MST-E0006 on 930618 + (11:36:49, 7 January 2025)
- 05000400/LER-1993-007-01, :on 930523,SUT to Auxiliary Bus E Supply Breaker 121 Failed to Open Automatically Due to Misaligned Mechanism Operated Cell Switch in Breaker 122.Insp of Other 6.9 Kv Breakers Performed + (11:36:51, 7 January 2025)
- 05000400/LER-1993-006-01, :on 930517,automatic Sampling Device Did Not Function During Release of Secondary Waste Sample Tank Due to Failure in Units Electronic Counter.Counter Replaced W/Modified Model + (11:36:53, 7 January 2025)
- ML18010B117 + (11:37:01, 7 January 2025)
- ML18010B115 + (11:37:02, 7 January 2025)
- ML18010B114 + (11:37:03, 7 January 2025)
- ML18010B113 + (11:37:04, 7 January 2025)
- ML18010B110 + (11:37:05, 7 January 2025)
- ML18010B109 + (11:37:06, 7 January 2025)
- IR 05000400/1993010 + (11:37:10, 7 January 2025)
- ML18010B106 + (11:37:11, 7 January 2025)
- ML18010B105 + (11:37:12, 7 January 2025)
- ML18010B104 + (11:37:13, 7 January 2025)
- ML18010B102 + (11:37:15, 7 January 2025)
- ML18010B101 + (11:37:16, 7 January 2025)
- 05000400/LER-1993-005-02, :on 930428,discoverd That Error Made During Review & Evaluation of Charging/Si Pump (Csip) B Acceptance Test Results.Caused by Personnel Error.Csip B Declared Inoperable + (11:37:18, 7 January 2025)
- ML18010B099 + (11:37:19, 7 January 2025)
- ML18010B098 + (11:37:20, 7 January 2025)
- ML18010B097 + (11:37:21, 7 January 2025)
- ML18010B095 + (11:37:22, 7 January 2025)
- ML18010B092 + (11:37:23, 7 January 2025)
- 05000400/LER-1993-004-02, :on 930413,discovered That Two CR Ventilation Dampers Not Tested within Required Surveillance Interval Due to Personnel Error.Operations Surveillance Test OST-1131 Revised & Event Reviewed by ISI Personnel + (11:37:25, 7 January 2025)
- ML18010B090 + (11:37:26, 7 January 2025)
- ML18010B089 + (11:37:27, 7 January 2025)
- ML18010B088 + (11:37:29, 7 January 2025)
- ML18010B087 + (11:37:30, 7 January 2025)
- ML18010B085 + (11:37:31, 7 January 2025)
- ML18010B084 + (11:37:31, 7 January 2025)
- ML18010B083 + (11:37:32, 7 January 2025)
- ML18010B082 + (11:37:33, 7 January 2025)
- 05000400/LER-1993-002-03, :on 930330,discovered Bearing Failure on Fan AH-92H Concurrent W/Inoperable Train B Essential Svc Chilled Water Chiller.Caused by Loose Bearings Shaft Locking Ring. Air Handling Unit Repaired & Returned to Svc + (11:37:35, 7 January 2025)
- ML18010B079 + (11:37:37, 7 January 2025)
- ML18010B077 + (11:37:38, 7 January 2025)
- IR 05000400/1993007 + (11:37:41, 7 January 2025)
- ML18010B074 + (11:37:43, 7 January 2025)
- IR 05000400/1992027 + (11:37:44, 7 January 2025)
- 05000400/LER-1993-001-03, :on 930308,discovered That Operations Surveillance Test for Onsite Power Distribution Did Not Check Position of Battery 2CB Input Breakers.Caused by Procedure Rev Oversight.Procedure Revised + (11:37:46, 7 January 2025)
- IR 05000400/1993006 + (11:37:50, 7 January 2025)
- ML18010B066 + (11:37:52, 7 January 2025)
- ML18010B067 + (11:37:52, 7 January 2025)
- ML18010B065 + (11:37:53, 7 January 2025)
- ML18010B064 + (11:37:54, 7 January 2025)
- ML18010B063 + (11:37:55, 7 January 2025)
- ML18010B062 + (11:37:55, 7 January 2025)
- ML18010B061 + (11:37:56, 7 January 2025)
- ML18010B060 + (11:37:57, 7 January 2025)
- ML18010B058 + (11:37:57, 7 January 2025)
- ML18010B056 + (11:37:58, 7 January 2025)
- ML18010B055 + (11:37:59, 7 January 2025)
- ML18010B051 + (11:38:00, 7 January 2025)
- ML18010B047 + (11:38:01, 7 January 2025)
- ML18010B049 + (11:38:01, 7 January 2025)